  ID Date Authordown Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  434   Thursday, April 09, 2015, 11:21 Anders Mjos      Problems/SolutionsNo RGA communcationsRGA stopped working. Likely after a spark
yesterday.
  
  435   Monday, April 13, 2015, 13:07 Anders Mjos      Problems/SolutionsISAC Test Stand Optical elements power supply drop out See e-fault 8027 
Monday, April 13, 2015
Kevin and Graham are working on it
  
  436   Wednesday, April 22, 2015, 13:17 Anders Mjos       Source Tray Removed by Mico, Dan and Anders   
  437   Friday, April 24, 2015, 12:25 Anders Mjos      Problems/SolutionsBacking line pressure highTSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced.
  
  438   Friday, April 24, 2015, 12:26 Anders Mjos LP-FEBIAD TM2 39230-1In progressTesting new TM2 Source TrayPhotos on DocuShare

 
Friday, April 24, 2015
 TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdfTM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdfTM2_Source_Tray_Test_FEBIAD_Target.docxTM2_Source_Tray_Coil_Leak_2015-04-30.png 
  439   Monday, May 04, 2015, 09:51 Anders Mjos      Problems/SolutionsFEBIAD Coil power supply replaced Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a 
  
  440   Friday, May 08, 2015, 09:07 Anders Mjos      Problems/SolutionsEPICS lost contact with the PLCEverything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has
  
  441   Wednesday, May 13, 2015, 13:27 Anders Mjos LP-FEBIAD TM2 39230-1In progressRe-testing new TM2 Source TrayNOTE:
COIL PS is a 100 A supply, thus actual COIL
current is 0.5x COIL set point.
  
  442   Tuesday, May 19, 2015, 19:10 Anders Mjos      Problems/SolutionsEPICS white out Likely caused by the PLC. e-fault
 8139

Wednesday, May 20, 2015
  
  443   Thursday, May 21, 2015, 16:40 Anders Mjos      Problems/SolutionsReconfigured service cap coil connections The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F ,
 TestStandSourceTray.jpgTM2SourceTray.jpg 
  444   Thursday, May 21, 2015, 17:26 Anders Mjos LP-FEBIAD TM2  In progressRe-testing new TM2 Source Tray Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos
started
 TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx2015-05-22_Flow.xlsx 
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate A gauge and a valve was installed
on the roughing line to the large turbo pump
  
  446   Monday, May 25, 2015, 14:40 Anders MjosSiC#31HP-SISITWTM438817-7 In progressSiC#31 ConditioningMonday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started.
 SiC#31.docxER30kV580-200.txtER30kV580-230.txt 
  447   Wednesday, May 27, 2015, 14:19 Anders Mjos LP-FEBIAD TM2  In progressRe-testing new TM2 Source TrayWednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos
started
 TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docxTM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf 
  448   Wednesday, June 03, 2015, 09:35 Anders Mjos      Problems/SolutionsPLC upgradeWednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15:
  
  449   Monday, June 15, 2015, 14:07 Anders Mjos      Problems/SolutionsTest Stand Source Tray installedMonday, June 15, 2015
Remaining items to do

    ANODE wire not yet attached
 Coils_configuration.jpg 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed throughNo wires connected yet.
Monday, June 22, 2015, 15:48: Roughing

Tuesday, June 23, 2015, 09:05:
 9-pin_feed_through.jpg 
  452   Thursday, June 25, 2015, 09:00 Anders Mjos LP-FEBIAD TM2   TM2 FEBIAD TestThursday, June 25, 2015, 09:00: Water on
HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started
  
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 