434
|
Thursday, April 09, 2015, 11:21 |
Anders Mjos | | | | | | | Problems/Solutions | No RGA communcations | RGA stopped working. Likely after a spark
yesterday. |
|
435
|
Monday, April 13, 2015, 13:07 |
Anders Mjos | | | | | | | Problems/Solutions | ISAC Test Stand Optical elements power supply drop out | See e-fault 8027
Monday, April 13, 2015
Kevin and Graham are working on it |
|
436
|
Wednesday, April 22, 2015, 13:17 |
Anders Mjos | | | | | | | | Source Tray Removed | by Mico, Dan and Anders |
|
437
|
Friday, April 24, 2015, 12:25 |
Anders Mjos | | | | | | | Problems/Solutions | Backing line pressure high | TSG:RP1 backing line pressure is >200
mT. An e-fault has been submitted to have
the roughing pump replaced. |
|
438
|
Friday, April 24, 2015, 12:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Testing new TM2 Source Tray | Photos on DocuShare
Friday, April 24, 2015 |
|
439
|
Monday, May 04, 2015, 09:51 |
Anders Mjos | | | | | | | Problems/Solutions | FEBIAD Coil power supply replaced | Power supply did not work after high
voltage conditioning. On Friday May 1st John
Chow replaced the power supply with a |
|
440
|
Friday, May 08, 2015, 09:07 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS lost contact with the PLC | Everything shut down, while EPICS showed
everyhing to be on.
Controls group (Dave Morris) has |
|
441
|
Wednesday, May 13, 2015, 13:27 |
Anders Mjos | | LP-FEBIAD | | TM2 | | 39230-1 | In progress | Re-testing new TM2 Source Tray | NOTE:
COIL PS is a 100 A supply, thus actual COIL
current is 0.5x COIL set point. |
|
442
|
Tuesday, May 19, 2015, 19:10 |
Anders Mjos | | | | | | | Problems/Solutions | EPICS white out | Likely caused by the PLC. e-fault
8139
Wednesday, May 20, 2015 |
|
443
|
Thursday, May 21, 2015, 16:40 |
Anders Mjos | | | | | | | Problems/Solutions | Reconfigured service cap coil connections | The service cap has been reconfigured
(colling and electric) to be compatible with
the TM2 Source tray. Coil- is E & F , |
|
444
|
Thursday, May 21, 2015, 17:26 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos
started |
|
445
|
Thursday, May 21, 2015, 17:38 |
Anders Mjos | | | | | | | Problems/Solutions | Installed equipment for measuring outgassing rate | A gauge and a valve was installed
on the roughing line to the large turbo pump |
|
446
|
Monday, May 25, 2015, 14:40 |
Anders Mjos | SiC#31 | HP-SIS | ITW | TM4 | 38817-7 | | In progress | SiC#31 Conditioning | Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started. |
|
447
|
Wednesday, May 27, 2015, 14:19 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | In progress | Re-testing new TM2 Source Tray | Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos
started |
|
448
|
Wednesday, June 03, 2015, 09:35 |
Anders Mjos | | | | | | | Problems/Solutions | PLC upgrade | Wednesday, June 03, 2015, 09:35: TP6 and
TP2 off
Wednesday, June 03, 2015, 10:15: |
|
449
|
Monday, June 15, 2015, 14:07 |
Anders Mjos | | | | | | | Problems/Solutions | Test Stand Source Tray installed | Monday, June 15, 2015
Remaining items to do
ANODE wire not yet attached
|
|
450
|
Monday, June 15, 2015, 14:09 |
Anders Mjos | ZrC#7 | LP-SIS | | TM2 | 41177-1 | | In progress | ZrC#7 Conditioning | Monday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started. |
|
451
|
Monday, June 22, 2015, 15:49 |
Anders Mjos | | | | | | | In progress | Installed new 9-pin feed through | No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing
Tuesday, June 23, 2015, 09:05: |
|
452
|
Thursday, June 25, 2015, 09:00 |
Anders Mjos | | LP-FEBIAD | | TM2 | | | | TM2 FEBIAD Test | Thursday, June 25, 2015, 09:00: Water on
HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started |
|
454
|
Tuesday, June 30, 2015, 14:51 |
Anders Mjos | ZrC#7 | LP-SIS | | TM2 | 41177-2 | | In progress | ZrC#7 Conditioning 2 | Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T |
|
|