Entry  Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray  TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx2015-05-22_Flow.xlsx

Thursday, May 21, 2015, 17:26: Roughing

Thursday, May 21, 2015, 18:02: Turbos started

Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T


Friday, May 22, 2015, 08:00: Opened water. Vacuum stable at 3.4E-6 T. No response on RGA

Friday, May 22, 2015, 08:10: Pumping on gas line

Friday, May 22, 2015, 08:21: Opened gas line.

Friday, May 22, 2015, 08:30: Auto-ramping to 500 / 250 A at 4/2 A/min. Good/bad vacuum 4E-6 and 5E-6 T

Friday, May 22, 2015, 08:35: BIAS/EZL/EE to 10 / 10 / 1.5 kV. COIL 50 A, ANODE 200 V

Friday, May 22, 2015, 12:16: Opened IV4

Friday, May 22, 2015, 14:59: BIAS/EZL/EE to 30 / 15 / 1.5 kV

Friday, May 22, 2015, 15:29 : Auto-ramping to 580 / 270 A at 2/1 A/min.


Saturday May 23 15:10 TGHT: 7.51 V 580 A, TBHT: 2.23 V 270 A, ANODE 200 V 13.4 mA, FC0 1.5e-8 A, IG1 1.9e-6 T, COIL 0 V 0 A not responding, some bias sparking over last 7 hours


Monday, May 25, 2015, 09:07: EE current limiting. Started auto-cool down at 4/2 A/min. Vacuum 1.2E-6 T

Monday, May 25, 2015, 09:37: BIAS and EZL to 0

Monday, May 25, 2015, 10:34 : Closed IV4

Monday, May 25, 2015, 11:56 : Cool down complete. Stopped turbos.

Monday, May 25, 2015, 13:17: Venting

Monday, May 25, 2015, 13:25: HS cooling circuit purged.

Monday, May 25, 2015, 14:25: The EE water line was found to be touching the COIL lines on the source tray.

Entry  Thursday, May 21, 2015, 16:40, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured service cap coil connections TestStandSourceTray.jpgTM2SourceTray.jpg

 The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H.

Entry  Tuesday, May 19, 2015, 19:10, Anders Mjos, , , , , , , Problems/Solutions, EPICS white out 

 Likely caused by the PLC. e-fault  8139


Wednesday, May 20, 2015

Dave Morris re-established contact with controls. (PLC IOC was down).

Entry  Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray 

NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.

Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and keep it further away from the GE lines.

Wednesday, May 13, 2015, 13:45: Roughing

Wednesday, May 13, 2015, 14:13: Starting turbos

Wednesday, May 13, 2015, 14:23: Turbos at speed. Vacuum at 4.6E-5 T


Thursday, May 14, 2015, 09:27: He pressure tested waterlines to 70 psi He. No response on the RGA. Vacuum 3.3E-6 T

Thursday, May 14, 2015, 09:39: Opened water supply. No increase on the RGA or IG

Thursday, May 14, 2015, 10:04: Tested COIL to 50 A set point (= 25 A). Returned to 0 A.

Thursday, May 14, 2015, 10:09: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 4E-6 / 5E-6 T

Thursday, May 14, 2015, 13:59: COIL at 50 A

Thursday, May 14, 2015, 21:57 : Starting cool down.


Friday, May 15, 2015, 06:25: Stopped turbos

Friday, May 15, 2015, 07:42 : Venting

C-seals installed.

Friday, May 15, 2015, 13:56: Roughing

Friday, May 15, 2015, 14:28 : Staring turbos

Friday, May 15, 2015, 14:38: Turbos ate speed. Vacuum at 3.9E-5 T


Tuesday, May 19, 2015, 07:31: Vacuum at 7.1E-7 T. Pumping on gas lines

Tuesday, May 19, 2015, 07:35: Water lines opened. Vacuum stable at 7.1E-7 T. No response on RGA

Tuesday, May 19, 2015, 07:43: Opened gas lines (SV5)

Tuesday, May 19, 2015, 07:47: Auto-ramping to 400 / 200 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T

Tuesday, May 19, 2015, 08:46: ANODE and COIL to 200 V and 50 A

Tuesday, May 19, 2015, 09:39: Auto-ramping to 500 / 250 A at 2 / 1 A/min. Good/Bad vacuum 2E-6 / 4E-6 T

Tuesday, May 19, 2015, 10:54: Opened IV4

Tuesday, May 19, 2015, 11:14: Atuo-ramping to 270 A. BIAS/EZL/EE at 30 / 15 / 1.5 kV

Tuesday, May 19, 2015, 11:42: BIAS/EZL/EE to 20 / 10 / 1.5 kV


Wednesday, May 20, 2015, 09:55:  Auto-ramping to 500 / 250 A at 4 / 2 A/min. Good/Bad vacuum 2E-6 / 4E-6 T

Wednesday, May 20, 2015, 09:57: BIAS/EZL/EE at 30 / 15 / 1.5 kV

Wednesday, May 20, 2015, 11:57: Auto-ramping to 580 / 290 A at 2 / 1 A/min.

Wednesday, May 20, 2015, 12:55: Vacuum excursion during beam tuning. Stopped turbos.


A leak was observed on the left coil conductor again. After inspecting the service cap, it was found that there was no water flow going through the left coil line due to differences in routing between the TM2 and the Test Stand source tray. A new coil line will be made and the water and electrical connections on the service cap will be reconfigured.

Entry  Friday, May 08, 2015, 09:07, Anders Mjos, , , , , , , Problems/Solutions, EPICS lost contact with the PLC 

Everything shut down, while EPICS showed everyhing to be on.

Controls group (Dave Morris) has reestablished contact. System is operations.

TSG section vented for Source Tray work

Friday, May 08, 2015, 09:13: TMS turbos at speed. Vacuum at 1.2E-5 T

Entry  Monday, May 04, 2015, 09:51, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Coil power supply replaced 

 Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted.

Entry  Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdfTM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdfTM2_Source_Tray_Test_FEBIAD_Target.docxTM2_Source_Tray_Coil_Leak_2015-04-30.png

Photos on DocuShare


 

Friday, April 24, 2015
The source tray has been installed and inspected.

Friday, April 24, 2015, 12:32: Roughing

Friday, April 24, 2015, 13:33: Starting turbos. Vacuum at 0.24 T

Friday, April 24, 2015, 13:42: Turbos at speed.

Friday, April 24, 2015, 13:43: 3.5E-5 T


Leak check performed with RGA and He pressurized on water line  incl GE line to 50 psi. Doors and ANODE line blank off He sprayed. No response.

RGA response to He confirmed with FEBIAD gas leak.

Monday, April 27, 2015, 12:00: Ge water open.

Monday, April 27, 2015, 12:03: Water open

Monday, April 27, 2015, 15:07: Electrical check completed OK. Test results attached. Tested low voltage on EZL, CB1, VCB1, CBC, EE, ANODE and BIAS

Monday, April 27, 2015, 15:15: Turbos stopped. Colimator connected to HS lines (60 kV). Should be on GND potential.

Monday, April 27, 2015, 16:00: Roughing

Monday, April 27, 2015, 16:30: Starting turbos

Monday, April 27, 2015, 16:40: Turbos at speed. Vacuum at 1.8E-5 T


 Tuesday, April 28, 2015, 09:46: Starting auto-ramping of heaters to 100 / 100 A at 2 A/min 3E-6 / 4E-6 T good/bad vacuum limits.

Tuesday, April 28, 2015, 10:38: Continue auto-ramping TGHT to 200 A

Tuesday, April 28, 2015, 11:15: Optics and steerers on.

Tuesday, April 28, 2015, 11:34: Continue auto-ramping TGHT to 250 A

Tuesday, April 28, 2015, 12:50: Continue auto-ramping TGHT/TBHT  to 300 /150 A 

Tuesday, April 28, 2015, 13:30: Continue auto-ramping TGHT/TBHT  to 400 /200 A 

Tuesday, April 28, 2015, 14:24: Continue auto-ramping TGHT/TBHT  to 500 /250 A 


 Wednesday, April 29, 2015, 06:06: Starting auto-ramp down.

Wednesday, April 29, 2015, 09:09: ANODE to 200 V. No current.

Wednesday, April 29, 2015, 09:16 : ANODE to 300 V. No current.

Wednesday, April 29, 2015, 09:16: EE to 2kV. 691 uA

Wednesday, April 29, 2015, 09:17: ANODE off. EE to 1.5 kV

Wednesday, April 29, 2015, 09:20: BIAS/EZL at 5/5 kV

Wednesday, April 29, 2015, 09:26: BIAS/EZL at 7.5/5 kV

Wednesday, April 29, 2015, 09:32 : BIAS/EZL at 10/5 kV

Wednesday, April 29, 2015, 09:47: BIAS/EZL at 15/7.5 kV

Wednesday, April 29, 2015, 10:04: BIAS/EZL at 20/10 kV

Wednesday, April 29, 2015, 10:20: BIAS/EZL at 25/12.5 kV

Wednesday, April 29, 2015, 10:48: BIAS/EZL at 30/15 kV. 2 sparks in 10 min on BIAS

Wednesday, April 29, 2015, 10:54: No sparks for 10 min

Wednesday, April 29, 2015, 12:01: BIAS/EZL at 40/20 kV

Wednesday, April 29, 2015, 12:48: No spark for the last 15 min. 3 sparks in the last 30 min

Wednesday, April 29, 2015, 13:09: BIAS/EZL at 45/22.5 kV

Wednesday, April 29, 2015, 13:45: BIAS/EZL at 50/25 kV

Wednesday, April 29, 2015, 14:53: Sparking above 50 kV. Loosing EPICS communication.

Wednesday, April 29, 2015, 15:46: BIAS/EZL at 53/27.5 kV

Wednesday, April 29, 2015, 16:11: BIAS/EZL at 53/27.5 kV. No sparks for 15 min

Wednesday, April 29, 2015, 16:19: BIAS/EZL/EE off for today


Thursday, April 30, 2015, 08:37: BIAS/EZL at 40/20 kV. EE at 1.5 kV. IG1 at 7.1E-7 T

Thursday, April 30, 2015, 08:55: BIAS/EZL at 50/25 kV

Thursday, April 30, 2015, 09:10: 1 spark in the last 15 min

Thursday, April 30, 2015, 09:32: BIAS/EZL at 53/25 kV

Thursday, April 30, 2015, 09:42: No sparks for 10 min

Thursday, April 30, 2015, 09:53: BIAS/EZL at 54/25 kV

Thursday, April 30, 2015, 10:00: Sparking caused lost EPICS communication.Manually current limiting PS

Thursday, April 30, 2015, 10:25: BIAS/EZL at 53/25 kV

Thursday, April 30, 2015, 10:31: BIAS/EZL at 54/25 kV

Thursday, April 30, 2015, 10:47: BIAS/EZL at 55/25 kV

Thursday, April 30, 2015, 10:53: BIAS/EZL at 55/27.5 kV. No sparks for 5 min

Thursday, April 30, 2015, 10:57: No sparks for 10 min.

Thursday, April 30, 2015, 11:01: BIAS/EZL at 55/30 kV

Thursday, April 30, 2015, 11:17: No sparks for 30 min.

Thursday, April 30, 2015, 11:19: BIAS at 30 kV

Thursday, April 30, 2015, 11:36: ANODE to 200 V. COIL is limited in EPICS to 0A and 0V

Thursday, April 30, 2015, 11:41: Opened isolation valve

Thursday, April 30, 2015, 11:42: Autoramping heaters to 500 / 250 A at 4/2 A/min. Good vacuum 2E-6 T, bad vacuum 3E-6 T

Thursday, April 30, 2015, 12:01: No EZL sparks for 60 min

Thursday, April 30, 2015, 12:03: EZL to 14 kV

Thursday, April 30, 2015, 13:50: Continue ramping to 580 / 300 A at 1/1 A/min

Troubleshooting FEBIAD coil power supply

Thursday, April 30, 2015, 14:10: Pumping on gas lines.

Thursday, April 30, 2015, 14:18: Tripped heaters when opening gas line to vacuum.

Thursday, April 30, 2015, 14:20: Autoramping heaters 500 / 250 A at 6/3 A/min.


A large (water?) leak opened up with target close to max temperature. Water lines were pressurized in an attempt to identify the leaky line. The test yesterday were not conclusive and was repeated this morning with no He response. The vacuum did not improve over night.

Friday, May 01, 2015, 10:08: Venting

Left coil line removed.

Friday, May 01, 2015, 11:10: Roughing

Friday, May 01, 2015, 11:41: Started turbos

With the leak detector pumping on the left coil line, a large leak could be confirmed at the soldering site.

Entry  Friday, April 24, 2015, 12:25, Anders Mjos, , , , , , , Problems/Solutions, Backing line pressure high 

TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.

Friday, April 24, 2015, 13:13: Pump replaced by vacuum group.

Entry  Wednesday, April 22, 2015, 13:17, Anders Mjos, , , , , , , , Source Tray Removed 

 by Mico, Dan and Anders

Entry  Monday, April 13, 2015, 13:07, Anders Mjos, , , , , , , Problems/Solutions, ISAC Test Stand Optical elements power supply drop out 

 See e-fault 8027 

Monday, April 13, 2015
Kevin and Graham are working on it

 

 

 

 

Entry  Thursday, April 09, 2015, 11:21, Anders Mjos, , , , , , , Problems/Solutions, No RGA communcations 

RGA stopped working. Likely after a spark yesterday.

Entry  Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning TM2_FEBIAD_Test_Target.docxER_Scans.zip

Thursday, April 02, 2015, 15:42: Roughing

Thursday, April 02, 2015, 16:12: Turbos started

Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T


Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T

Tuesday, April 07, 2015, 08:25: Pumping on gas lines.

Tuesday, April 07, 2015, 08:37: Finished pumping.

Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber

Tuesday, April 07, 2015, 08:42: RGA filament on.

Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV

Tuesday, April 07, 2015, 08:55: COIL to 50 A,  ANODE to 200 V

Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min

Tuesday, April 07, 2015, 13:25 : Opened IV4

Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A


Wednesday, April 08, 2015, 09:27: Opening for Ne gas

Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV

Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV

Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV


Thursday, April 09, 2015, 11:19: Starting target cool down

Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV

Thursday, April 09, 2015, 17:58: BIAS and source off.


Friday, April 10, 2015, 08:21: Closed gas supply

Friday, April 10, 2015, 08:23: Stopped turbos

Entry  Tuesday, March 24, 2015, 09:50, Anders Mjos, , , , , , , In progress, Empty chamber 

Roughed down on Friday 20th

Tuesday, March 24, 2015, 09:49: Turbos started

Tuesday, March 24, 2015, 09:59: Turbos at speed. Vacuum at 2.8E-6 T


EPICS could not communicate with devices. Contacted controls (Dave M)

Thursday, April 02, 2015, 14:45: Stopped turbos.

Thursday, April 02, 2015, 15:10: Started venting through turbo pump (to 16 T)

Thursday, April 02, 2015, 15:12: Venting through VV1

Entry  Monday, March 16, 2015, 18:53, Anders Mjos, Ta#45, HP-SIS, ITE, TM4, 38817-5, , In progress, Conditioning Ta#45 Ta#45_Test_Stand.docxTa#45_2015-03-17_Mar_17_2015_09-05-31_AM.ana

 Monday, March 16, 2015, 18:53: Started turbos

Monday, March 16, 2015, 19:00: Turbos at speed. Vacuum at 1.3E-5 T


Tuesday, March 17, 2015, 09:03: Opened cooling water. Vacuum stable at 1.9E-7 T

Tuesday, March 17, 2015, 09:12: Opened IV4. BIAS/EZL/EE to 30/14/1.5 kV

Tuesday, March 17, 2015, 09:20: Started heating TGHT/TBHT to 400/150 A at 2/1 A/min


Wednesday, March 18, 2015, 08:41: Continued heating TGHT/TBHT to 580/170 A at 2/1 A/min

Wednesday, March 18, 2015, 09:33: MB1 found tripped on water flow. Water pressure is low this morning as cyclotron main magnet was switched on, but not all water pumps. Expected to be resolved soon..

Some emittance scans at 170, 180, 190, 200 A TBHT were done


Thursday, March 19, 2015, 08:47: Heating TBHT to 220 A

Thursday, March 19, 2015, 08:56: Heating TBHT to 230 A

Thursday, March 19, 2015, 10:50: EE at -2000 V for 10 min

Thursday, March 19, 2015, 10:52: EE back at -1.5 kV

Thursday, March 19, 2015, 17:54: Started cool down of target


Friday, March 20, 2015, 08:47: Closed IV4

Friday, March 20, 2015, 08:47: RGA off.

Friday, March 20, 2015, 08:50: Stopped turbos

Friday, March 20, 2015, 10:24: Venting

Friday, March 20, 2015, 11:45: Target removed.

Entry  Thursday, February 26, 2015, 10:11, Anders Mjos, , , , , , , In progress, Installing FEBIAD test target for emittance rig tests ER_Test_w_FEBIAD.docxFebiadTS.xls

Thursday, February 26, 2015, 10:11: Stopped turbos

Thursday, February 26, 2015, 11:23: Venting

Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later

Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.

Thursday, February 26, 2015, 16:23: Started turbos

Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T


Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T

Friday, February 27, 2015, 09:30: RGA on

Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min

Friday, February 27, 2015, 16:38: Source off


Monday, March 02, 2015, 14:00: Gas lines purged. Opening.

Fixed a air leak on one of the Swagelok joints.

Monday, March 02, 2015, 14:47: RGA with Ne Open

Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T

Mass 18 1.6E-7 T


Tuesday, March 03, 2015, 09:58: Started heating

Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.


Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.

Emittance vs EE voltage studied


Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)

Thursday, March 05, 2015, 15:12: The following devices were found off

TMS:Q6
TMSQ1
TPS:CBC


Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.

Friday, March 06, 2015, 10:51 : Ramping down source

Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.

Graham will be doing some controls work


Monday, March 09, 2015, 09:16: Ramping up the source. IV opened

Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.

Monday, March 09, 2015, 16:51: Opened Ne leak


Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.


Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet


Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.


Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.

Monday, March 16, 2015, 09:14: Bias off. Stopping turbos

Monday, March 16, 2015, 15:26: Venting

Entry  Wednesday, February 18, 2015, 13:32, Anders Mjos, , , , , , , Problems/Solutions, Switched off system in preparation for power outage 

Thursday, February 19, 2015, 12:14: Starting system again after the power outage

Thursday, February 19, 2015, 13:27: The performance of RP1 has degraded. Edi flushed some air through, which helped a bit. It now takes longer to start up.

Thursday, February 19, 2015, 13:33: Vacuum recovered.

Entry  Tuesday, February 17, 2015, 14:41, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 

Tuesday, February 17, 2015, 14:35: Roughing. Doors were difficult to get to seal.

Tuesday, February 17, 2015, 15:11: Started turbos

Tuesday, February 17, 2015, 15:34: Turbos at speed. Vacuum at 6.7E-6 T

Entry  Friday, February 13, 2015, 13:59, Anders Mjos, , , , , , , Problems/Solutions, PLC failure 

The PLC CPU came out of the socket around 11:50am today (Dave Morris). The CPU had not been properly attached. This resulted in full stop of all power supplies and vacuum pumps.

Restarted vacuum pumps at 12:10pm (20 min later).

Entry  Tuesday, February 03, 2015, 16:10, Anders Mjos, , , , , , , Problems/Solutions, Current read back on TBHT has been corrected to 600 A 

 By controls group

Entry  Tuesday, February 03, 2015, 14:33, Anders Mjos, Empty, LP-SIS, , , , , In progress, Target with new center block and new EE insulator 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip

Also with newly installed RGA

Tuesday, February 03, 2015, 14:33: Roughing

Tuesday, February 03, 2015, 15:05: Turbos started

 Tuesday, February 03, 2015, 15:15: Turbos at speed. Vacuum at 3.3E-5 T


Wednesday, February 04, 2015, 13:56: Cooling water on HS circuit on. No response on IG1 or on the RGA (water)


Thursday, February 05, 2015, 09:00: RGA started. Scan 1-100 every 5 min

Thursday, February 05, 2015, 09:02: Opened IV4

Thursday, February 05, 2015, 09:16: Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:24: Opened electrical cage to switch on TGHT PS

Thursday, February 05, 2015, 09:26 : Started target heating to 500 / 150 A at 2 / 1 A/min

Thursday, February 05, 2015, 09:28: BIAS/EZL/EE on and at HV

Thursday, February 05, 2015, 13:21: TGHT voltage limited. Voltage limit increased to 7 V

Thursday, February 05, 2015, 13:53: Continue to 580 A

Thursday, February 05, 2015, 14:25: RGA stopped around 13:34. Started scanning again

Thursday, February 05, 2015, 15:08: Heating to 200 A on TBHT


Friday, February 06, 2015, 10:34: Heating TBHT to 220 A

Friday, February 06, 2015, 11:07: TBHT at 230 A. TGHT at 580 A

Friday, February 06, 2015, 11:50: Cooling down target

Friday, February 06, 2015, 11:56: RGA  off

Friday, February 06, 2015, 11:5: BIAS/EZL/EE off


Tuesday, February 10, 2015, 11:34: BIAS/EZL/EE on. Started heating to 580 / 230 A at 4 / 2 A/min. RGA on


Monday, February 16, 2015, 08:46: BIAS/EZL/EE on

Monday, February 16, 2015, 09:13 : Started heating to 580 / 230 A at 4 / 2 A/min. RGA on

Monday, February 16, 2015, 10:10: Opened isolation valve

Monday, February 16, 2015, 14:23: TGHT was found voltage limiting at 7 V. Increased voltage limit to 7.2 V

Temperature read with digital optical pyrometer. Inside target 1800 - 1900 deg C. Outside 1900 - 2000 deg C

Monday, February 16, 2015, 15:50: Starting cool down


Tuesday, February 17, 2015, 08:30: RGA off

Tuesday, February 17, 2015, 08:32: BIAS/EZL/EE off. Isolation valve closed.

Tuesday, February 17, 2015, 08:34: Turbos off

Tuesday, February 17, 2015, 13:58: Venting