Entry  Thursday, April 09, 2015, 11:21, Anders Mjos, , , , , , , Problems/Solutions, No RGA communcations 
RGA stopped working. Likely after a spark yesterday.
Entry  Monday, April 13, 2015, 13:07, Anders Mjos, , , , , , , Problems/Solutions, ISAC Test Stand Optical elements power supply drop out 
 See e-fault 8027 
Monday, April 13, 2015
Kevin and Graham are working on it
Entry  Wednesday, April 22, 2015, 13:17, Anders Mjos, , , , , , , , Source Tray Removed 
 by Mico, Dan and Anders
Entry  Friday, April 24, 2015, 12:25, Anders Mjos, , , , , , , Problems/Solutions, Backing line pressure high 
TSG:RP1 backing line pressure is >200 mT. An e-fault has been submitted to have the roughing pump replaced.
Friday, April 24, 2015, 13:13: Pump replaced by vacuum group.
Entry  Friday, April 24, 2015, 12:26, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Testing new TM2 Source Tray TM2_Source_Tray_in_Test_Stand_-_Electrical_Check.pdfTM2_Source_Tray_in_Test_Stand_FEBIAD_Coil_Water_Leak.pdfTM2_Source_Tray_Test_FEBIAD_Target.docxTM2_Source_Tray_Coil_Leak_2015-04-30.png
Photos on DocuShare

 
Friday, April 24, 2015
Entry  Monday, May 04, 2015, 09:51, Anders Mjos, , , , , , , Problems/Solutions, FEBIAD Coil power supply replaced 
 Power supply did not work after high voltage conditioning. On Friday May 1st John Chow replaced the power supply with a 12 V 100 A power supply temporary while the other supply is being repaired. EPICS controls have not been adjusted.
Entry  Friday, May 08, 2015, 09:07, Anders Mjos, , , , , , , Problems/Solutions, EPICS lost contact with the PLC 
Everything shut down, while EPICS showed everyhing to be on.
Controls group (Dave Morris) has reestablished contact. System is operations.
TSG section vented for Source Tray work
Entry  Wednesday, May 13, 2015, 13:27, Anders Mjos, , LP-FEBIAD, , TM2, , 39230-1, In progress, Re-testing new TM2 Source Tray 
NOTE: COIL PS is a 100 A supply, thus actual COIL current is 0.5x COIL set point.
Changed the FEBIAD connector blocks to have copper tubes exit below the block. Extended ANODE wire to allow it to be wrapped around Cu-tubes and
keep it further away from the GE lines.
Entry  Tuesday, May 19, 2015, 19:10, Anders Mjos, , , , , , , Problems/Solutions, EPICS white out 
 Likely caused by the PLC. e-fault  8139

Wednesday, May 20, 2015
Dave Morris re-established contact with controls. (PLC IOC was down).
Entry  Thursday, May 21, 2015, 16:40, Anders Mjos, , , , , , , Problems/Solutions, Reconfigured service cap coil connections TestStandSourceTray.jpgTM2SourceTray.jpg
 The service cap has been reconfigured (colling and electric) to be compatible with the TM2 Source tray. Coil- is E & F , Coil+ is G & H.
Entry  Thursday, May 21, 2015, 17:26, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray  TM2_Source_Tray_Test_FEBIAD_Target_Test_3.docx2015-05-22_Flow.xlsx
Thursday, May 21, 2015, 17:26: Roughing
Thursday, May 21, 2015, 18:02: Turbos started
Thursday, May 21, 2015, 18:12: Turbos at speed. Vacuum at 4.7E-5 T
Entry  Thursday, May 21, 2015, 17:38, Anders Mjos, , , , , , , Problems/Solutions, Installed equipment for measuring outgassing rate 
 A gauge and a valve was installed on the roughing line to the large turbo pump
Entry  Monday, May 25, 2015, 14:40, Anders Mjos, SiC#31, HP-SIS, ITW, TM4, 38817-7, , In progress, SiC#31 Conditioning SiC#31.docxER30kV580-200.txtER30kV580-230.txt
Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos started.
Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T
Entry  Wednesday, May 27, 2015, 14:19, Anders Mjos, , LP-FEBIAD, , TM2, , , In progress, Re-testing new TM2 Source Tray TM2_Source_Tray_Test_FEBIAD_Target_Test_4.docxTM2_Source_Tray_in_Test_Stand_-_Test_Results.pdf
Wednesday, May 27, 2015, 14:19: Roughing
Wednesday, May 27, 2015, 14:50: Turbos started
Wednesday, May 27, 2015, 15:00: Turbos at speed. Vacuum at 1.6e-5 T
Entry  Wednesday, June 03, 2015, 09:35, Anders Mjos, , , , , , , Problems/Solutions, PLC upgrade 
Wednesday, June 03, 2015, 09:35: TP6 and TP2 off
Wednesday, June 03, 2015, 10:15: Upgrade in progress.
Entry  Monday, June 15, 2015, 14:07, Anders Mjos, , , , , , , Problems/Solutions, Test Stand Source Tray installed Coils_configuration.jpg
Monday, June 15, 2015
Remaining items to do

    ANODE wire not yet attached
    FEBIAD COILS not yet reconfigured


Tuesday, June 16, 2015:
Entry  Monday, June 15, 2015, 14:09, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-1, , In progress, ZrC#7 Conditioning ZrC#7.docxER580-220-30kV-m39-off30.txt
Monday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos started.
Monday, June 15, 2015, 14:49: Turbos at speed. Vacuum at 5.3E-5 T
Entry  Monday, June 22, 2015, 15:49, Anders Mjos, , , , , , , In progress, Installed new 9-pin feed through 9-pin_feed_through.jpg
No wires connected yet.
Monday, June 22, 2015, 15:48: Roughing

Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.
Entry  Thursday, June 25, 2015, 09:00, Anders Mjos, , LP-FEBIAD, , TM2, , , , TM2 FEBIAD Test 
Thursday, June 25, 2015, 09:00: Water on HS. No vacuum response.
Thursday, June 25, 2015, 11:48: Started auto ramping heaters.
Thursday, June 25, 2015, 17:14: Target at 580/275 A. BIAS/EZL/EE at 30 / 13.5 / 1.5 kV
Entry  Tuesday, June 30, 2015, 14:51, Anders Mjos, ZrC#7, LP-SIS, , TM2, 41177-2, , In progress, ZrC#7 Conditioning 2 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt
Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started turbos. CG1 at 0.075 T
Tuesday, June 30, 2015, 16:23 : Turbos at speed. Vacuum at 1.4E-5 T