584
|
Tuesday, May 16, 2017, 14:25 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | | Tri-Coil CTL-FEBIAD test III | Coil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing. |
8x |
583
|
Wednesday, May 10, 2017, 15:07 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (FS#3 out) | FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos |
|
582
|
Friday, May 05, 2017, 14:28 |
Aaron Schmidt | UC#20 | LP-IG-LIS | | | | | | Conditioning Heat shield for UC#20 (2) | New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines |
|
581
|
Thursday, May 04, 2017, 13:49 |
Aaron Schmidt | UC#20 | LP-IG-LIS | | | | | | Conditioning Heat shield for UC#20 (1) | Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos
on. |
|
580
|
Tuesday, May 02, 2017, 14:03 |
Aaron Schmidt | | | | | | | | Pump down empty chamber. (FS#3 out) | Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging.
Wednesday, May 03, 2017, |
|
579
|
Tuesday, April 18, 2017, 07:46 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1B & TSG:BV1B tripped | Tuesday, April 18, 2017, 07:30: TSG : TP1B
Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG |
|
578
|
Wednesday, April 12, 2017, 16:04 |
Anders Mjos | | | | | | | Problems/Solutions | Leak on FS#3 COIL and EE | A water to vacuum leak has been found on
FS#3. The leak is not detected on the leak
detector, but can be seen as an increase |
|
577
|
Monday, April 10, 2017, 15:12 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum leak on front door | The vacuum behaved erratic over night with
excursion up into the mid 10^-6 Torr range.
To investigate the chamber was vented. With |
|
576
|
Thursday, April 06, 2017, 12:06 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | | | In progress | Tri-Coil CTL-FEBIAD test | Thursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on. |
|
575
|
Tuesday, April 04, 2017, 14:33 |
Aaron Schmidt | | | | | | | | Power supply failure to E-rig | Wednesday, March 29, 2017, 15:15: DAC power
supply appears to have failed. Pop sound
and electrical smoke/smell noticed. |
|
574
|
Friday, March 24, 2017, 14:43 |
Aaron Schmidt | Ta#51 | LP-SIS | ITW | TM2 | 41790-4 | 41751-5 | In progress | Conditioning Ta#51 | Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on. |
9x |
573
|
Wednesday, March 22, 2017, 09:37 |
Anders Mjos | | | | | | | | Pump down empty chamber | Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05:
Turbos started |
|
572
|
Friday, March 10, 2017, 15:42 |
Aaron Schmidt | UC#19 | | | | 41882-4 | 41751-2 | In progress | Conditioning Heat shield for UC#19 | Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo
pumps started. |
|
571
|
Tuesday, February 21, 2017, 10:35 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Water leak (E)(G) | Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water |
|
570
|
Wednesday, February 15, 2017, 13:42 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Problems/Solutions | Vacuum Check (Water leak) | *Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.* |
|
569
|
Monday, February 06, 2017, 09:14 |
Aaron Schmidt | | | | | | | Problems/Solutions | Power outage. | Weekend power outage. All turbos were tripped.
Epics white out. Control group notified.
Monday, February 06, 2017, 09:07: |
|
568
|
Wednesday, January 25, 2017, 14:57 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Done | Target cleaning test LP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
567
|
Wednesday, January 25, 2017, 14:56 |
Aaron Schmidt | | | | | 42218-14 | 41751-6 | Done | Target cleaning test LP-SIS CC Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
566
|
Wednesday, January 25, 2017, 14:55 |
Aaron Schmidt | | | | | 42218-6 | 41751-6 | Done | Target cleaning test (Long) HP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
565
|
Wednesday, January 25, 2017, 14:54 |
Aaron Schmidt | | | | | 42218-9 | 41751-6 | Done | Target cleaning test HP-SIS CC Clean |