ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
615
|
Friday, December 01, 2017, 14:31 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | Silver plated bolts test / Outgas TS | Chamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT. |
|
217
|
Friday, September 28, 2012, 09:59 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training - Source Off | Checked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week. |
|
218
|
Monday, October 01, 2012, 10:41 |
Aurelia Laxdal | | HP-FEBIAD | | | | | In progress | SiC-HP-FEBIAD for operator training - Source ON | Turned the source back ON. Heaters are
ramping up. |
|
216
|
Thursday, September 27, 2012, 12:27 |
Aurelia Laxdal | | | | | | | In progress | SiC-HP-FEBIAD for operator training | The source was used yesterday for operator
training.
Today, I found the source off: the |
|
881
|
Wednesday, June 23, 2021, 12:24 |
Aaron Schmidt | SiC#40 | HP-SIS | ITE | TM4 | 42218-8 | 43515-8 | In progress | SiC#40 Conditioning-2 | Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on. |
|
446
|
Monday, May 25, 2015, 14:40 |
Anders Mjos | SiC#31 | HP-SIS | ITW | TM4 | 38817-7 | | In progress | SiC#31 Conditioning | Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started. |
|
381
|
Wednesday, May 21, 2014, 17:05 |
Aurelia Laxdal | SiC#30 | HP-FEBIAD | ITE | TM3 | | | In progress | SiC#30 HV and Heaters conditiong | As per Friedhelm the conditioning settings
are:
|
|
382
|
Monday, May 26, 2014, 14:15 |
Aurelia Laxdal | SiC#30 | HP-FEBIAD | ITE | TM3 | | | Done | SiC#30 HV and Heaters Conditioning | HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line |
|
384
|
Friday, June 13, 2014, 08:43 |
Anders Mjos | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | 39956-5 | Done | SiC#30 HV and Heaters Conditioning |
|
|
386
|
Tuesday, June 17, 2014, 15:22 |
Anders Mjos | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | 39956-5 | In progress | SiC#30 HV and Heaters Conditioning |
|
|
228
|
Friday, November 02, 2012, 15:40 |
Aurelia Laxdal | | LP-SIS | ITW | TM1 | | | Done | SiC#3 cooldown started | Started the cooldown for SiC#3. |
|
84
|
Monday, May 14, 2012, 16:57 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27-HP-SIS installed in the Test Stand | Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down. |
|
94
|
Wednesday, May 16, 2012, 18:10 |
Aurelia Laxdal | | | ITE | TM4 | | | | SiC#27 cooling down | Today: did a mass scan at 580A on TGHT
and 230A on TBHT at 30kV. Found some A/q
units discrepancies on the mass scan page. |
|
835
|
Monday, December 21, 2020, 07:58 |
Aaron Schmidt | | | | | | | | Shutdown TS | Shutting down the ISAC TS for the planned
outage on Dec 22.
Monday, December 21, 2020, 07:50: |
|
141
|
Thursday, July 12, 2012, 09:05 |
Anders Mjos | | | | | | | Problems/Solutions | Shut down TSGTP1A - bearing noise | Shut down TSGTP1A due to noise (possibly
from bearings) after consulting Edi. |
|
172
|
Thursday, August 16, 2012, 16:54 |
Anders Mjos | | | | | | | Problems/Solutions | Short between gas line and heat shield | There was a short between the gas line
and the heat shield - as the gas line insulator
was not tied to the heat shield. A Ta-wire |
|
997
|
Tuesday, February 20, 2024, 14:22 |
Aaron Schmidt | | | | | | | | Set to Cathode BIAS Mode | Tuesday, February 20, 2024, 14:20: TS to
wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: |
|
1001
|
Tuesday, April 09, 2024, 15:28 |
Aaron Schmidt | | | | | | | | Set to Anode BIAS Mode & Old gas leak installed. | Switched to Anode mode on March 28 including
polarity. The old calibrated leak was also
re-installed. |
|
867
|
Tuesday, March 30, 2021, 13:19 |
Carla Babcock | | | | | | | | Second emittance meter testing | Emittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening, |
|
908
|
Tuesday, December 21, 2021, 13:34 |
Aaron Schmidt | | LP-SIS | | | 44691-8 | 44378-6 | In progress | Salts test HS & Holiday Shutdown | LP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS. |
|