Entry  Tuesday, July 28, 2020, 13:27, Aaron Schmidt, , , , , , , Problems/Solutions, Water leak on magnet PS 

 Fault: 13334

Tuesday, July 28, 2020, 12:00: Leak discovered in ISAC Test Stand MB1 PS. Appears to be coming from hose barb soldered connection to heat sink of pass bank. Pass bank will need to be disassembled and heat sink soldered on a workbench.

Entry  Wednesday, July 22, 2020, 08:56, Luca Egoriti, P2N test, HP-SIS, ITE, TM4, , , In progress, p2n heating test - electrical feedthrough configuration ISACteststand_TMwiring.pptxP2N-TestStand_20200722.pngP2N-TestStand_1200A.png

 The electrical feedthroughs at the top of the test stand module were reconfigured to deliver up to 1200A to the p2n target.

1) The two COIL lines (one + and one -) were disconnected from their terminals E and F

2) The TBHT terminals (two + and two -) were disconnected from A and B

3) The two TBHT positive terminals are connected to E and G respectively. The two TBHT negative terminals are both connected to F, and a 4/0 cable is run from F to H

4) The three TGHT + terminals are left connected to D. The three TGHT - terminals are left connected to C

In the vacuum chamber, COIL and TGHT terminals of the same polarity are shorted by means of thick copper bars specifically machined to match the test stand terminals geometry. The test can proceed by ramping both TGHT and TBHT up to 600 A each, possible at the same time and speed.

The wiring diagram is shown in the attached picture 

 

Extech measurements before heating (µOhm):

TGHT Left leg Ta-Cu: 205, 215, 212, 201.

TGHT Right leg Ta-Cu: 287, 295, 275, 292.

TGHT Ta legs: 596, 606, 597, 598.

TBHT A: 1470, 1471.

TBHT B: 1469, 1469.

 

Wednesday, July 22, 2020, 16:21

Rampup finished around 2PM, looks good. Around 300+300A the TBHT voltage limit prevented the TBHT current to increase, and instead it decreased. Aaron ramped it down, adjusted the voltage limit and proceeded without issues.

The water flow and temperatures looked fine.

Attached the plots and a picture at 1200A

 

 Thursday, July 23, 2020, 11:53

Frank Song checked for us the status of the test stand. Pictures looked good, despite the reflections, I can't see sign of the flexy legs glowing. Thank you Frank!

The voltage on the TGHT has dropped 0.02 V, and the voltage on the TBHT (COIL lines) has dropped by 0.04V in 20 hours. I think it's negligible, just a sign of some sintering.

The cooling parameters are as follows:

Input 1: 28.05 C

Input 2: 8.49 lpm

Input 3: 27.79 C

Input 4: 11.14 lpm

Input 5: 27.72 C

Input 6: 3.90 lpm

Input 7: 27.78 C

Input 8: 7.79 lpm

 

Friday, July 24, 2020, 16:42

This morning I saw the target for my first time and not in a picture. I could see a mild glow in the center of both flexy legs, while the external foils seemed cold. This seems really good, as expected!

Water parameters were checked:

Input 1: 27.75 C

Input 2: 8.38 lpm

Input 3: 27.52 C

Input 4: 11.13 lpm

Input 5: 27.37 C

Input 6: 3.93 lpm

Input 7: 27.53 C

Input 8: 7.78 lpm 

 

 

Monday, July 27, 2020, 09:35

Aaron's measurement from today at 7:30am

 Input 1: 26.61 C

Input 2:  8.25 lpm

Input 3: 26.35 C

Input 4: 11.19 lpm

Input 5: 26.21 C

Input 6: 3.84 lpm

Input 7: 26.35 C

Input 8: 7.76 lpm


FM

Thursday, July 30, 2020, 15:53: Auto-cooling TGHT/TBHT to 0 @ 4 A/min 

 

 

Thursday, July 30, 2020, 23:02

Ramp down terminated around 7pm, the current was ramped smoothly but the voltage from both PS (TGHT and TBHT) had some bumps in correspondance with vacuum response. Maybe something was shorting? A thorough inspection of the heat shield and target might tell more.

Thanks Fernando for ramping down! 


Tuesday, August 04, 2020, 07:33: PS / sources off. Lock out. IG & Turbo pumps off. Purge waterlines. - AS

 

Tuesday, August 04, 2020, 09:32

Started rewiring the test stand.

TBHT+ (A1 and A2): connected to A

TBHT- (B1 and B2): connected to B

COIL+ (A3): connected to E

COIL-(B3): connected to F

4/0 short connection from F to H removed

 

Tuesday, August 04, 2020, 15:27

Extech measurements after heating (µOhm):

TGHT Left leg Ta-Cu: 160, 176, 184, 180

TGHT Right leg Ta-Cu: 49, 48, 52, 53.

TGHT Ta legs: 470, 469, 463, 480.

TBHT A: 2400, 2229,2492.

TBHT B: 2361, 2411, 2412.

Entry  Monday, July 20, 2020, 11:40, Aaron Schmidt, (Empty-Test), , , , 44160-1, 43822-2, In progress, Conditioning Test P2N P2N_-_1_-_July-20-22-2020.docx

Salts added: 

Cs - 15 uL

Li - 10 uL

Na - 10 uL

Rb - 10 uL

K - 5 uL

Empty target in use. Mirror installed inside to look at the target through the top cooling opening.

Monday, July 20, 2020, 14:36: Roughing. Assistance req'd to close the doors.

Monday, July 20, 2020, 15:12: Turbo pumps on.

Monday, July 20, 2020, 15:17: Ion gauge on.

Monday, July 20, 2020, 15:26: TP1A tripped.

Monday, July 20, 2020, 16:00: Continued backing trips. Await pump down.

Monday, July 20, 2020, 16:29: Attempt Bypass.

Monday, July 20, 2020, 16:32: Trip on TMS:TP2? Odd. Restarted quick.

Monday, July 20, 2020, 16:34: TSG:TP1A & TSG:TP1B up to speed. Ion gauge on. Pumping down.


See: https://elog.triumf.ca/TIS/Test-Stand/802 for wiring spec. TGHT / TBHT (on coil) connected.

Tuesday, July 21, 2020, 07:16: Water lines Opened. No response on vacuum. Ok @ 2.13e-06T. 

Tuesday, July 21, 2020, 08:27: Ion gauge & Turbo pumps off. One more target / electrical check is required.

Tuesday, July 21, 2020, 09:50: Venting.

Tuesday, July 21, 2020, 10:19

Extech measurements (µOhm):

TGHT Left leg Ta-Cu: 205, 215, 212, 201.

TGHT Right leg Ta-Cu: 287, 295, 275, 292.

TGHT Ta legs: 596, 606, 597, 598.

TBHT A: 1470, 1471.

TBHT B: 1469, 1469.

Tuesday, July 21, 2020, 10:36: Roughing.

Tuesday, July 21, 2020, 13:06: Turbo pumps on.

Tuesday, July 21, 2020, 13:16: Ion gauge on.

Tuesday, July 21, 2020, 13:40: Lockout / power / sources on.


Wednesday, July 22, 2020, 09:28: Auto-ramping TGHT / TBHT to 100 / 100 A @ 4 A per min.

Wednesday, July 22, 2020, 09:54: Auto-ramping TGHT / TBHT to 200 / 200 A @ 4 A per min.

Wednesday, July 22, 2020, 10:30: Visual note @ 200 A. No glow noted on target or the legs. Auto-ramping TGHT / TBHT to 300 / 300 A @ 4 A per min.

Wednesday, July 22, 2020, 10:57: Visual note @ 300 A. The target is glowing & reflecting the glow on the legs. The glow is even. Vacuum @ 2.95e-06T (Allow to stabilize).

Wednesday, July 22, 2020, 11:05: Vacuum @ 2.24e-06T. Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.

Wednesday, July 22, 2020, 11:26: Auto-ramp aborted. TGHT heating OK. TBHT moving off?

TGHT: "Set" to 384 A = 383.6 A

TBHT: "Set" to 384 A = 318.2 A

Wednesday, July 22, 2020, 11:34: Manually tap down by 10 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 374 A = 373.6 A

TBHT: "Set" to 374 A = 325.4 A

Wednesday, July 22, 2020, 11:35: Manually tap down TGHT only by 10 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 364 A = 363.4 A

TBHT: "Set" to 374 A = 331.3 A

Wednesday, July 22, 2020, 11:37: Manually tap down TBHT only by 10 A. No change.

TGHT: "Set" to 364 A = 363.4 A

TBHT: "Set" to 364 A = 331.4 A

Wednesday, July 22, 2020, 11:39: Manually tap down TGHT down to 350 A. TBHT increases as TGHT decreases.

TGHT: "Set" to 350 A = 349.5 A

TBHT: "Set" to 364 A = 339.0 A

Wednesday, July 22, 2020, 11:40: Tap down to TGHT & TBHT to 340 A.

Wednesday, July 22, 2020, 11:43: Adjust TBHT Voltage limit from 3.001 to 4.001 V.

Wednesday, July 22, 2020, 11:44: Manually tap up both TGHT &TBHT to 350 A.

TGHT: "Set" to 350 A = 349.5 A

TBHT: "Set" to 350 A = 348.9 A

Wednesday, July 22, 2020, 11:45: Auto-ramping TGHT / TBHT to 400 / 400 A @ 4 A per min.

Wednesday, July 22, 2020, 12:43: Auto-ramping TGHT / TBHT to 500 / 500 A @ 4 A per min.

Wednesday, July 22, 2020, 12:59: Adjust TBHT voltage limit from 4.001 to 6.001 V

Wednesday, July 22, 2020, 13:11: Visual note @ 500 A. The target  is glowing bright. Vacuum @ 2.51e-06T

Auto-ramping TGHT / TBHT to 550 / 550 A @ 4 A per min.

Wednesday, July 22, 2020, 13:25: TGHT / TBHT @ 550 A. Vacuum @ 2.74e-06T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.59 8.17
 TBHT 27.37

11.06

 COIL + EE 27.18 3.78
 TGHT  27.32 7.65

 Wednesday, July 22, 2020, 13:27: Auto-ramping TGHT / TBHT to 600 / 600 A @ 4 A per min.

Wednesday, July 22, 2020, 13:41: TGHT / TBHT @ 600 A. Vacuum @ 3.23e-06T

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.69 8.61
 TBHT 27.44

11.30

 COIL + EE 27.28 3.97
 TGHT  27.43 7.91

Target visual. Center hot / Legs Ok. Bright. Use welding glasses to view. 

Entry  Monday, July 13, 2020, 14:52, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 43515-2, , UCx HS conditioning.  

Broken LP-FEBIAD used to out gas.

Monday, July 13, 2020, 14:52: Roughing.

Monday, July 13, 2020, 15:29: Turbo pumps on. 

Monday, July 13, 2020, 15:34: Ion gauge on.


Tuesday, July 14, 2020, 06:44: Waterlines opened.

Tuesday, July 14, 2020, 06:47: Power / sources on.

Tuesday, July 14, 2020, 06:49: Auto-ramping TGHT to 580 A @ 2 A per min.

Tuesday, July 14, 2020, 14:15: Vacuum @ 2.59e-06T 


Friday, July 17, 2020, 10:54: Auto-cooling @ 1 A per min. 


Monday, July 20, 2020, 06:51: Power /  sources off.

Monday, July 20, 2020, 06:52: Ion gauge / Turbo pumps off.

Monday, July 20, 2020, 06:53: Re-attached N bottle / regulator for purging.

Monday, July 20, 2020, 06:57: Waterlines Purged. N bottle @ 1300 PSI.

Entry  Monday, July 06, 2020, 05:28, Fernando Maldonado, Test FEBIAD , HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 3/3 

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Monday, July 06, 2020 is:
  1. Ramp up TGHT/TBH to 580/315 A.
  2. Anode sweep
  3. Mass scan without gas.
  4. Coil sweep without gas
  5. Gases in.
  6. Mass scan with gases
  7. Coil sweep with gasses
  8. Efficiency measurements at highest and lowest FC6 current

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-06 FEBIAD development part 3  (Web view)


Monday, July 06, 2020, 05:27: Auto-ramping TGHT/TBHT to 580/315 @ 2 A/min.

 Monday, July 06, 2020, 14:2: IV4 open.

Monday, July 06, 2020, 14:41: Anode sweep completed. No anode current registered.

Monday, July 06, 2020, 14:42:  HV spark. Anode current now show something. 13.431 mA. The source current however did not change after the spark.

Monday, July 06, 2020, 15:08: Anode sweep completed.

Monday, July 06, 2020, 15:19: IG1=2.57e-6T. 

Monday, July 06, 2020, 15:43: Mass scan completed.

Monday, July 06, 2020, 16:02: Coil sweep completed.

Monday, July 06, 2020, 16:04: FC6=8.40e-11A. IG1=2.59e-6T.

Monday, July 06, 2020, 16:07: SV1 closed. SV3 and SV4 open/closed x5.

Monday, July 06, 2020, 16:10: SV3 and SV4 open.

Monday, July 06, 2020, 16:12: SV1 closed. SV5 open/closed x5.

Monday, July 06, 2020, 16:13: SV5 open. No trip!!!

Monday, July 06, 2020, 16:25: FC6=1.16e-10A. IG1=2.74e-6T.

Monday, July 06, 2020, 16:33: Closing gas lines to prevent more leakage.

Tomorrow I will move to mass 40, to see if the ionization changes with the small gas load.

Monday, July 06, 2020, 16:36: Done for the day.


The plan for today Tuesday, July 07, 2020 is:
  1. Gases in.
  2. Mass scan with gases
  3. Coil sweep with gasses
  4. Efficiency measurements at highest and lowest FC6 current

Tuesday, July 07, 2020, 13:38:FC6=4.46e-11A. IG1=2.41e-6T.

SV3 and SV4 open/closed x5.  SV1 open.

Tuesday, July 07, 2020, 13:40: SV3 and SV4 open.

Tuesday, July 07, 2020, 13:41: SV1 closed. SV5 open/closed x5.

SV5 open. No trip!!!

Tuesday, July 07, 2020, 13:57: FC6=8.46e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:15: Mass scan completed.

Tuesday, July 07, 2020, 14:22: mass=39.82. A slight bump between the potassiums 38 and 41.

Tuesday, July 07, 2020, 14:38: Coil sweep completed.

Coil=0A. FC6=1.18e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:39: SV3 closed.

Tuesday, July 07, 2020, 14:47: FC6=1.26e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 14:48: SV4 closed.

Tuesday, July 07, 2020, 14:59: 1.15e-11A. IG1=2.41e-6T.

Tuesday, July 07, 2020, 15:00: SV5 closed.

Tuesday, July 07, 2020, 15:07: FC6=1.15e-11A. IG1=2.41e-6T.

Tuesday, July 07, 2020, 15:08: SV3 and SV4 open/closed x5. SV1 open.

Tuesday, July 07, 2020, 15:09: SV3 and SV4 open. SV1 closed.

Tuesday, July 07, 2020, 15:10:  SV5 open/closed x5. SV5 open. No trip!!!

Tuesday, July 07, 2020, 15:2: FC6=1.26e-11A. IG1=2.59e-6T.

Tuesday, July 07, 2020, 15:32: SV3 closed.

Tuesday, July 07, 2020, 15:44: FC6=1.4e-11A. IG1=2.57e-6T

Tuesday, July 07, 2020, 15:44: SV4 closed.

Tuesday, July 07, 2020, 16:01: FC6=1.15e-11A. IG1=2.39e-6T.

Tuesday, July 07, 2020, 16:01: SV5 closed.

 Tuesday, July 07, 2020, 16:31: Coil sweep with no gas completed.

Tuesday, July 07, 2020, 16:52: Mass scan completed.

Tuesday, July 07, 2020, 16:52: Done for the day.


The plan for today Wednesday, July 08, 2020 is:
  1. Ramp up TBHT to 580/320 A.
  2. Anode sweep
  3. Mass scan without gas.
  4. Coil sweep without gas
  5. Gases in.
  6. Mass scan with gases
  7. Coil sweep with gasses
  8. Efficiency measurements at highest FC6 current
  9. Coil sweep without gas

Wednesday, July 08, 2020, 15:00: IG1=2.41e-6T.

 Wednesday, July 08, 2020, 15:29: Auto-ramping TBHT to 320A @ 2A/min.

Wednesday, July 08, 2020, 15:54: Anode sweep completed.

Wednesday, July 08, 2020, 16:33: Mass scan completed

Wednesday, July 08, 2020, 16:56: Coil completed.

Wednesday, July 08, 2020, 16:57. IG1=2.59e-6T. FC6=8.63e-11A.

Wednesday, July 08, 2020, 16:58: SV3 and SV4 open/closed x5. SV1 open.

Wednesday, July 08, 2020, 16:59: SV3 and SV4 open. SV1 closed.

Wednesday, July 08, 2020, 17:01: SV5 open/closed x5. SV5 open. No trip!!!

Wednesday, July 08, 2020, 17:12: FC6=9.20e-12A. IG1=2.65e-6T.

Wednesday, July 08, 2020, 17:44: Mass scan completed.

FC6=8.61e-12A. IG1=2.65e-6T.

Wednesday, July 08, 2020, 18:14: Coil sweep completed.

FC6=5.52e-11A. IG1=2.68e-6T.

Wednesday, July 08, 2020, 18:19: SV3 closed.

Wednesday, July 08, 2020, 18:25: FC6=6.8e-11A. IG1=2.65e-6T

Wednesday, July 08, 2020, 18:25: SV4 closed.

Wednesday, July 08, 2020, 18:39 : FC6=1.70e-11A. IG1=2.59e-6T.

Wednesday, July 08, 2020, 18:40 : SV5 closed.

Wednesday, July 08, 2020, 19:08: FC6=1.32e-11A. IG1=2.59e-6T.

Wednesday, July 08, 2020, 19:12: Sudden TBHT current increase of approx 2A. TBHT voltage seem to have droped a little 0.02V.

Wednesday, July 08, 2020, 19:14: Coil=0A. I'll wait until IG1 reading stabilizes.

Wednesday, July 08, 2020, 19:31: FC6=8.09e-12. IG1=2.48e-6T.

Wednesday, July 08, 2020, 19:31: TBHT returned to values  pior to sudden jump.

Wednesday, July 08, 2020, 19:58: Coil sweep with no gas completed.

Wednesday, July 08, 2020, 19:58: Done for the day.


The plan for today Thursday, July 09,2020 is:
  1. Ramp down TBHT to 580/290 A.
  2. Anode sweep
  3. Coil sweep without gas
  4. Gases in.
  5. Coil sweep with gases
  6. Ramp down test stand

Thursday, July 09, 2020, 09:53: Manually tap down TBHT to 290A @ ~~2A/min 

Thursday, July 09, 2020, 11:02: Anode sweep completed.

Thursday, July 09, 2020, 13:15: Coil=0A. IG1=2.24e-6T. FC0=2.48e-10A. FC6=7.43e-12A.

Thursday, July 09, 2020, 14:15: SV3 and SV4 open/closed x5. SV1 open.

Thursday, July 09, 2020, 14:16: SV3 and SV4 open. SV1 closed.

Thursday, July 09, 2020, 14:17 : SV5 open/closed x5. SV5 open. No trip!!!

Thursday, July 09, 2020, 14:31: FC6=3.03e-11A. IG1=2.50e-6T.

Thursday, July 09, 2020, 14:54: Coil sweep completed.

Thursday, July 09, 2020, 15:16: Anode=0 V.

Thursday, July 09, 2020, 15:16: SV3, SV4, SV5 closed

Thursday, July 09, 2020, 15:18: IV4 closed. timeout, reset it

Thursday, July 09, 2020, 15:20: BIAS/EZL/EE 0 kV.

Thursday, July 09, 2020, 15:21: Auto-cooling 2 A/min

Thursday, July 09, 2020, 15:25: Done for the day.


Monday, July 13, 2020, 07:01: Ion gauge & Turbo pumps off. Noted HV cage is already removed & PS locked out.

Entry  Tuesday, June 30, 2020, 21:59, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8 , 42752-5 , Done, FEBIAD development part 2/3 

 Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Wednesday, July 01, 2020 () is:
  1. Coil sweep with gas lines opened.
  2. Coil sweep with gas lines closed
  3. Coil sweep with gas lines opened.
  4. Efficiency measurements at highest and lowest FC6 signal
  5. Mass scan.

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-07-01 FEBIAD development part 2  (Web view)


Wednesday, July 01, 2020, 11:50: FC6=6.89e-12A. IG1=2.76e-6T.

FC6 has dropped 60% and the vacuum 15% with the respect to the last set of measurements.

Maybe the mass is not Ar+ but K? Or the decrease in pressure has this large correlation to FC6 magnitude.

Wednesday, July 01, 2020, 12:41: Coil sweep up and down completed.

Wednesday, July 01, 2020, 12:47: SV3, SV4, and SV5 close

IG1=2.59e-6T. The gas bottles are definitely running out, as there is no much change in pressure whether they are opened or closed

Wednesday, July 01, 2020, 13:15: Coil sweep completed.

Wednesday, July 01, 2020, 13:22: FC6 and IG1 increasing. Probably due to the coil still at 90A. reducing coil current.

Wednesday, July 01, 2020, 13:29: SV1 open. SV3 open/closed x5. SV4 open/closed x5.

Wednesday, July 01, 2020, 13:31: SV3 and SV4 open.

Wednesday, July 01, 2020, 13:32: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 13:33 SV5 open. No trip!!!

Wednesday, July 01, 2020, 14:30: Coil=0A.

Wednesday, July 01, 2020, 14:34 : SV3 closed.

Wednesday, July 01, 2020, 14:37:SV4 closed.

Coffee break.

Wednesday, July 01, 2020, 14:54: FC6~~9.76E-13A. IG1= 2.44e-6T

Wednesday, July 01, 2020, 15:11:SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Wednesday, July 01, 2020, 15:13:  SV3 and SV4 open.

Wednesday, July 01, 2020, 15:30: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 15:30: SV5 open. No trip!!!

Wednesday, July 01, 2020, 15:52: Coil=90A. FC6=1.41e-11A . IG1=2.68e-6T.

Wednesday, July 01, 2020, 15:57: FC6=1.16e-11A. IG1=2.68E-6T.

Wednesday, July 01, 2020, 15:58: SV3 closed.

Wednesday, July 01, 2020, 16:03: SV4 closed.

Wednesday, July 01, 2020, 16:07: 4.95e-12A. IG1=2.77e-6T.

Pressure increasing.

Wednesday, July 01, 2020, 16:14:SV1 open. FC6 decreasing momentarily, now increasing again due to the pressure increase.

Wednesday, July 01, 2020, 16:15: SV3 open/closed x5. SV4 open/closed x5.

IG1=3.1e-6T. FC6=6.00e-12A. Seems table now.

Wednesday, July 01, 2020, 16:17: SV3 and SV4 open.

Wednesday, July 01, 2020, 16:20: SV1 closed. SV5 open/closed x5.

Wednesday, July 01, 2020, 16:20: SV5 open. No trip!!!

 Wednesday, July 01, 2020, 16:44: FC6=1.12e-11A. IG1=3.14e-6T.

Wednesday, July 01, 2020, 17:40: Mass scan completed. Peaks are really bad resolved.

Wednesday, July 01, 2020, 17:43;FC0 in. Coil=0A.

Wednesday, July 01, 2020, 17:43: Done for the day


The plan for today Thursday, July 02, 2020 is:
  1. Increase cathode current to 310A.
  2. Anode voltage sweep.
  3. Mass scan at nominal values.
  4. Coil sweep with gases
  5. Efficiency measurement at highest coil current.
  6. Coil sweep without gas.
  7. Mass scan without gas.

 Thursday, July 02, 2020, 08:03: IG1=2.68e-6T. Vacuum decreased overnight, reading on FC0 decreased as well.

Thursday, July 02, 2020, 08:11: Auto-ramp TBHT to 310A @ 2A/min 

 Thursday, July 02, 2020, 09:15: FC0 increasing

Thursday, July 02, 2020, 10:30: FC0 seems to be stable now on 5.51e-9A. 

Thursday, July 02, 2020, 11:10: Mass scan completed.

 Thursday, July 02, 2020, 11:26: Mass=40.

Thursday, July 02, 2020, 13:47: Coil sweep completed.

Thursday, July 02, 2020, 13:48: Coil=90A. FC6=1.35e-10A. IG1=2.76e-6T.

Thursday, July 02, 2020, 13:49: SV3 closed.

Thursday, July 02, 2020, 13:52: SV4 closed.

Thursday, July 02, 2020, 14:00: SV5 closed.

Thursday, July 02, 2020, 14:02:  FC6=5.80e-11A. IG1=2.59e-6T.

Thursday, July 02, 2020, 14:08 : SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Thursday, July 02, 2020, 14:09:  SV3 and SV4 open.

Thursday, July 02, 2020, 14:11: SV1 closed. SV5 open/closed x5.

Thursday, July 02, 2020, 14:11: SV5 open. No trip!!!

Thursday, July 02, 2020, 14:30: FC6=1.40e-10A. IG1=2.96e-6T.

Thursday, July 02, 2020, 14:32: SV3 closed.

Thursday, July 02, 2020, 14:35 : SV4 closed.

Thursday, July 02, 2020, 14:50 : SV5 closed.

Thursday, July 02, 2020, 15:28:  FC6=3.34e-11A. IG1=2.59e-6T.

Thursday, July 02, 2020, 16:05: Coil sweep without gases finished.

 Thursday, July 02, 2020, 16:35: Mass scan finished.

Thursday, July 02, 2020, 16:51: Coil=90A.

Thursday, July 02, 2020, 17:07: Mass scan completed.

Thursday, July 02, 2020, 17:07 : SV1 open.  SV3 open/closed x5. SV4 open/closed x5.

Thursday, July 02, 2020, 17:09:  SV3 and SV4 open.

Thursday, July 02, 2020, 17:10: SV1 closed. SV5 open/closed x5.

The mini-pump line was open for a moment while SV5 was opened, there was no trip but this might have added air into the system.

Thursday, July 02, 2020, 17:13: SV5 open. No trip!!!

Thursday, July 02, 2020, 17:21: FC6=4.10e-11A. IG1=2.76e-6T.

Thursday, July 02, 2020, 17:38: Mass scan completed.

Thursday, July 02, 2020, 17:40: Coil=0A.

Thursday, July 02, 2020, 17:56: Mass scan finished.

Thursday, July 02, 2020, 17:57: Done for the day.


The plan for today Friday, July 03, 2020 is:
  1. Emittance scans at difference coil values.

Friday, July 03, 2020, 11:45: Coil=0. Mass=40u

Friday, July 03, 2020, 11:45: FC6=4.12e-11A. IG1=2.72e-6T.

Friday, July 03, 2020, 12:13: Coil=0. Mass=28u. FC6=7.88e-10A. IG1=2.74e-6T.

 Friday, July 03, 2020, 12:25: Test Stand tripped and the lights around flicker. EPICS whiteout. Even turbos shut off.

Friday, July 03, 2020, 12:27: Called control room and they told that there were a couple of power bumps.

Friday, July 03, 2020, 12:41: EPICS restarted but still whiteout problem similar to e-log 702. Likely to submit a faulty report

Friday, July 03, 2020, 12:57: PLC restarted, EPICS workings.

Friday, July 03, 2020, 12:58: Turbos at speed.

Friday, July 03, 2020, 13:25: Source/Optics on.

Friday, July 03, 2020, 13:36: BIAS/EZL/EE @ 30/13/1.5 kV.

Friday, July 03, 2020, 13:39: IG1=2.15e-6T.

Friday, July 03, 2020, 13:41: Auto-ramping TGHT/TBHT to 400/200A @ 2A/min for the weekend.

Friday, July 03, 2020, 13:44: Done for the day. To continue on Monday.

 

Entry  Thursday, June 25, 2020, 08:57, Fernando Maldonado, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, Done, FEBIAD development part 1/3 

 Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

 

The plan for today Thursday, June 25, 2020 is:
  1. Optimize (tune) the beam to FC0 and then to FC6.
  2. Compensate beam energy by substracting the value of anode voltage to the high voltage. Thursday, June 25, 2020, 16:07: FEBIAD is on cathode bias
  3. Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
  4. Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.

The system is prone to trip if the build-up pressure for the gas lines is higher than 7e-6T.  I will try to wait as long as reasonably possible to make sure the gas lines are pumped to good vacuum levels.

COVID-19 protocol: buddy is Marla Cervantes

New idea: Screenshot e-log on the ISAC TS team notebook: 20-06-26 FEBIAD development day  (Web view)


Thursday, June 25, 2020, 08:38:  TGHT / TBHT @ 580 / 280. Coil @ 0A. Vacuum @ 3.71e-06T. BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.

Thursday, June 25, 2020, 10:34: TP6 tripped. Closed IV4 closed and reset it. TP6 on

Thursday, June 25, 2020, 10:41:IV4 open


Thursday, June 25, 2020, 10:54: Optimizing beam to FC0 with current tune.

Thursday, June 25, 2020, 12:19: New values for TPS:Q1,Q2,Q3,Q4. Better beam shape on RMP0A and 0B

Thursday, June 25, 2020, 12:33: I think there is something wrong with this  FEBIAD as the mass scan does not show any peaks.

I've noticed the word document from Aaron, and he observed peaks likely from surface ionized species. Furthermore there is no anode current readback on epics nor on the power supply.

Possbile culprits. The anode is not well attached to the 9-pin. The cathode temperature is extremely low and there are no electron-impact ionized species.

 Thursday, June 25, 2020, 12:52: Power supply is on cathode bias mode as well as all the service cap wiring.

Thursday, June 25, 2020, 13:03:  Back to old tunes. Mass scan still showing only surfaced ionized species.

 Thursday, June 25, 2020, 14:30:  Mass scan for 0V finished. Peaks at 38 and 28 u. 38 is Potassium, but 28 is odd, closest surface ionized species might be Al27 with an ionization potential of about 5.8 eV.

Thursday, June 25, 2020, 15:20 : Mass scan for 100V finished. Peaks still at 38 and 28 but with different intensities. Now there are features  what seem to be 18 and 14. Water and N respectively.

Thursday, June 25, 2020, 15:03: Manually tap TBHT to 290 A.

Thursday, June 25, 2020, 15:31: FC6 signal increased. Anode leakage current still showing 0.0 mA.

Thursday, June 25, 2020, 15:35: Manually tap TBHT to 295 A

Thursday, June 25, 2020, 15:58: Mass scan completed. More peaks showed up.

Thursday, June 25, 2020, 15:35: Manually tap TBHT to 300A. Anode leakage current still showing 0.0 mA.

Thursday, June 25, 2020, 16:30: Manually tap TBHT to 305A. Anode leakage current still showing 0.0 mA.

Increasing Anode to 500 V, now there is a reading of 1.2mA. However, there were sparks on the high voltage so this current might be a leakage current from the high voltage.

Thursday, June 25, 2020, 16:34: Lowering to 300A to run a mass scan.

Thursday, June 25, 2020, 16:59: Similar mass spectrum, the anode current is meaningless.

Thursday, June 25, 2020, 17:00: Mass 28 will be used for efficiency measurements.

Thursday, June 25, 2020, 17:15: SV3 closed.

Thursday, June 25, 2020, 17:20: SV4 closed.

Thursday, June 25, 2020, 17:38: SV5 closed.

Thursday, June 25, 2020, 17:39: SV1 opened (mini pump)

Thursday, June 25, 2020, 17:41: Opening and closing SV3 and SV4.

Thursday, June 25, 2020, 17:45: Opening SV5. System tripped.

Thursday, June 25, 2020, 17:51: I will open the cage  to see if the mini pump is on.

Thursday, June 25, 2020, 17:58: The mini-pump was off and unplug. Now connected and running.

 Thursday, June 25, 2020, 18:00: SV1 open.

Thursday, June 25, 2020, 18:10: SV1 closed

Thursday, June 25, 2020, 18:10: SV5 open. Negligible response on IG1.

Thursday, June 25, 2020, 18:13: SV5 off. SV3 and SV4 open.

Thursday, June 25, 2020, 18:14: SV1 open.

Thursday, June 25, 2020, 18:17: SV1 closed.

Thursday, June 25, 2020, 18:17: SV5 open/close/open. Maximum vacuum 6e-6T. This is very closed to the hard-coded interlock. Everything is off, so it will be better to have the vacuum response at least near 4 or 5 e-6T.

Thursday, June 25, 2020, 18:26: SV3 closed.

Thursday, June 25, 2020, 18:31: SV4 closed.

Thursday, June 25, 2020, 18:41: SV5 closed. SV1 open. Wait 15 min

Thursday, June 25, 2020, 19:02: Vacuum response 5e-6.

Thursday, June 25, 2020, 19:02: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

 


 

 The plan for today Friday, June 26, 2020 is:

  1. Ramp up high voltage to operation values
  2. Mass scan at nominal values
  3. Send m=28 beam to FC6
  4. Perform an efficiency measurement to know the correct work of the mini pump and also the time needed for 1 measurement.
  5. Perform at least 3 efficiency measurements of the same configuration as a sanity check on the reproducibility of the measurements.

 

Friday, June 26, 2020, 11:31: BIAS/EZL/EE @ 30/13/1.5 kV. Anode @ 150 V

Friday, June 26, 2020, 11:58: Mass scan completed.

 Friday, June 26, 2020, 12:0: Magnet set to m=28. FC9=1.17e-9A. IG1=3.42e-6T

Friday, June 26, 2020, 12:17: SV3 closed.

Friday, June 26, 2020, 12:24: No effect on FC6 reading.

Friday, June 26, 2020, 12:24: SV4 closed.

Friday, June 26, 2020, 12:35: FC6=5.5e-10T and seems to  flatten.

Friday, June 26, 2020, 12:44: FC6=5.33e-10.

Friday, June 26, 2020, 12:45: SV5 closed. FC6=5.18e-10 and decreasing.

SV5 closes the gas line segment to the ion source. The response on the ion current indicates that once the leakage lines are closed, there is still some gas in the lines causing the slow decrease on ion current.

There is approximately a factor of 2 increase for m=28 when the argon is used.

Friday, June 26, 2020, 12:52: SV1 on.

Friday, June 26, 2020, 12:52: SV3 open/closed x5

Friday, June 26, 2020, 12:53: SV4 open/closed x5

Friday, June 26, 2020, 12:54: SV3 and SV4 opened.

Friday, June 26, 2020, 12:56: SV1 closed

Friday, June 26, 2020, 12:57: SV1 opened

Friday, June 26, 2020, 12:59 SV1 closed. SV5 open/closed x5

Friday, June 26, 2020, 13:00: SV5 opened.  No trip!!!

Ion current increases when the valve is open. This indicated the build up pressure being release into the ion source. Max FC6=4.17e-9 A. Now decreasing.

Friday, June 26, 2020, 13:07: FC6 reading and IG1 reading approaching values previous to efficiency measurement.

Friday, June 26, 2020, 13:13: FC6=1.17e-9A. IG1=3.47e-6.

Total time for 1 efficiency measurement 50 minutes. The largest wait occurs for the current to stabilize.

Approximately 30 minutes when closing the valves, 15 minutes when opening them, and 10 minutes for roughing the lines.

Friday, June 26, 2020, 13:30: Same measurement for (my) sanity check. FC6=1.16e-9. IG1=3.51e-6T

Friday, June 26, 2020, 13:30: SV3 closed.

Friday, June 26, 2020, 13:35: SV4 closed.

Friday, June 26, 2020, 13:50: SV5 closed.

Friday, June 26, 2020, 13:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 13:53: SV3 and SV4 opened.

Friday, June 26, 2020, 13:57: FC6=4.87e-10A. IG1=3.38e-6T.

Friday, June 26, 2020, 13:59: SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 14:00: SV5 open. No trip!!!

Friday, June 26, 2020, 14:00: FC6=2.9e-9A. IG1=4.1e-6T. and decreasing.

Friday, June 26, 2020, 14:14: FC6=1.16e-9. IG1=3.56e-6T

Total time for eff measurement=45 minutes

Friday, June 26, 2020, 14:20: Last efficiency measurement for these values. Then lunch break.

Friday, June 26, 2020, 14:23: SV3 closed.

Friday, June 26, 2020, 14:29: SV4 closed.

 Friday, June 26, 2020, 14:42: SV5 closed.

Friday, June 26, 2020, 14:43: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 14:44: SV3 and SV4 opened

Friday, June 26, 2020, 14:49: FC6=4.71e-10. IG1=3.29e-6T.

 Friday, June 26, 2020, 14:51: SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 14:52: SV5 open. No trip!!!

Friday, June 26, 2020, 14:52: FC6=3.2e-9A. IG1=4.13e-6T.

 Friday, June 26, 2020, 15:05: FC6=1.12e-9A. IG1=3.49e-6T.

Total time for eff measurement=43 minutes.

Friday, June 26, 2020, 15:33: By averaging all readings, the gas signal corresponds to 57.7% of the entire signal.  There is an increase factor of  2.36. No efficiency can be estimated as the signal is not from the gas bottle.

Friday, June 26, 2020, 15:43: Switching to mass 40 (Ar+1).

 Friday, June 26, 2020, 15:56: I think I am set on mass 40 (Ar+) The signal varies when  adjusting the voltage. Proceeding to efficiency measurement.

Friday, June 26, 2020, 15:59: FC6=2.49e-11. IG1=3.67e-6T

Friday, June 26, 2020, 16:00: SV3 closed.

Friday, June 26, 2020, 16:05: SV4 closed.

Friday, June 26, 2020, 16:20 : SV5 closed.

Friday, June 26, 2020, 16:20 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 16:21 : SV3 and SV4 opened.

Friday, June 26, 2020, 16:21 : FC6=1.06e-11A. IG1=3.40e-6T

Friday, June 26, 2020, 16:24 : SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 16:24 : SV5 open. No trip!!!

Friday, June 26, 2020, 16:25  FC6=3.7e-11. IG1=4.30e-6T

Friday, June 26, 2020, 16:28: The proportion between gas signal and background is 57.4% of the entire signal. Very similar result to  previous mass. There is also an increase factor of 2.35 for Ar+1

Friday, June 26, 2020, 16:37: FC6=2.44e-11. IG1=3.58e-6

Friday, June 26, 2020, 16:43: Coil=20 A. This provides the smallest ion current signal FC6=1.13e-11.

Friday, June 26, 2020, 16:49: FC6=1.13e-11. IG1=3.58e-6T.

Friday, June 26, 2020, 16:50: SV3 closed.

Friday, June 26, 2020, 16:54 :SV4 closed.

Friday, June 26, 2020, 17:09 :SV5 closed.

Friday, June 26, 2020, 17:10 :SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Friday, June 26, 2020, 17:10 :SV3 and SV4 opened.

Friday, June 26, 2020, 17:10 :FC6=1.51e-12A. IG1=3.38e-6T

The proportion of this measurement is 86.63%.

Friday, June 26, 2020, 17:12 :SV1 closed. SV5 open/closed x5.

Friday, June 26, 2020, 17:12 :SV5 open. No trip!!!.

Friday, June 26, 2020, 17:22 :  FC6=3.7e-11. IG1=4.30e-6T

 Friday, June 26, 2020, 17:24:  FC6 reading keeps decreasing and it's already below the initial current.

I suspect that the ion current that was read when the coil was changed corresponds to superposition of previously ionized species and the coil adjusted those charges. Once flushed, the neutral atoms will established a new equilibrium.

NOTE: Will setting the anode to 0 V flushed the source? Test it tomorrow.

Friday, June 26, 2020, 17:43: FC6 signal is increasing. I'll leave it as is.

 


Saturday, June 27, 2020, 11:47: FC6=1.06e-11A. IG1=3.40e-6T. Similar to the value of the current prior to the efficiency measurement.

 The plan for today Saturday, June 27, 2020 is:

  1. Perform an efficiency for coil 20. This might be a long measurement if the value has to increases again. If after 1.5 h the signal still shows a mismatch, then I'll try to flush the source by setting the anode to 0V
  2. Redo efficiency measurement.
  3. Try another coil value.

Saturday, June 27, 2020, 11:52: FC6=1.06e-11. IG1=3.40e-6T

Saturday, June 27, 2020, 11:55: SV3 closed.

Saturday, June 27, 2020, 12:03 : SV4 closed.

Saturday, June 27, 2020, 12:20 : SV5 closed.

Saturday, June 27, 2020, 12:20: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 12:21 : SV3 and SV4 opened.

Saturday, June 27, 2020, 12:23 : FC6=6.76e-12A. IG1=3.14e-6T

Saturday, June 27, 2020, 12:26 : SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 12:27 : SV5 open. No trip!!!

Saturday, June 27, 2020, 12:42: FC6=1.01e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 12:48Coil to 0, then to 20A. Anode voltage to 0V then to 150V. FC6=1.05e-11A.

Saturday, June 27, 2020, 12:50: SV3 closed.

Saturday, June 27, 2020, 12:55 : SV4 closed.

Saturday, June 27, 2020, 13:01: SV5 closed

Saturday, June 27, 2020, 13:01 : SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 13:02: SV5 closed.

Saturday, June 27, 2020, 13:04: TSG:CB1 and TPS:VCB3 tripped. now on

Saturday, June 27, 2020, 13:04: FC6=6.64e-12A. IG1=3.23e-6T.

Saturday, June 27, 2020, 13:05:  SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 13:07: SV5 open. No trip!!!

Saturday, June 27, 2020, 13:13: FC6=1.03e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 13:15: Now I will sweep the coil from  0 to 20. Then run the efficiency measurement again.

Saturday, June 27, 2020, 13:22: Coil=15A provides the minimum current but I will stay with 20 A.

Saturday, June 27, 2020, 13:23 : SV3 closed

Saturday, June 27, 2020, 13:28 : SV4 closed.

Saturday, June 27, 2020, 13:37: SV5 closed.

Saturday, June 27, 2020, 13:42: FC6=6.60e-12A. IG1=3.23e-6T.

By averaging all the readings for coil 20. The proportion of current coming from the gas is only 36%. There is an increase factor of 1.56 compared to the no gas situation.

Saturday, June 27, 2020, 13:49: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 13:51: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 13:52: SV5 open. No trip!!!

Saturday, June 27, 2020, 14:08 : FC6=1.00e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 14:10: Coil=40A. This values gives a similar current as coil=0A.

Saturday, June 27, 2020, 14:11: FC6=2.65e-11A. IG1=3.38e-6T.

Saturday, June 27, 2020, 14:19: SV3 closed.

Saturday, June 27, 2020, 14:26: FC6=2.45e-11.

Saturday, June 27, 2020, 14:27:SV4 closed.

Lunch break.

Saturday, June 27, 2020, 15:23: IG1=9.65e-12. IG1=3.20e-6T.

Saturday, June 27, 2020, 15:24: SV5 closed.

Saturday, June 27, 2020, 15:33: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 15:34: SV3 and SV4 opened.

Saturday, June 27, 2020, 15:55: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 15:56: SV5 open. No trip!!!

Saturday, June 27, 2020, 16:14: FC6=1.95e-11A. IG1=3.40e-6T.

Again, the base current with all the gas is note the same as prior to the effciciency measurment.

Saturday, June 27, 2020, 16:15 : Anode to 0V.

Saturday, June 27, 2020, 16:16 Anode=150 V. FC6=2.01e-11A.

Saturday, June 27, 2020, 16:18:Coil=0A.

Saturday, June 27, 2020, 16:19 Coil=40A. FC6=1.98e-11A.

Saturday, June 27, 2020, 16:20 Coil to 0. Anode to 0.

Saturday, June 27, 2020, 16:20 Anode=150V, coil=40A.

Saturday, June 27, 2020, 16:22: FC6=1.97e-11

Saturday, June 27, 2020, 16:32: Coil to 0. Anode to 0.

Saturday, June 27, 2020, 16:33: Coil=40A. Anode 150V.

Saturday, June 27, 2020, 16:34:FC6=1.97e-11A.

Saturday, June 27, 2020, 16:36: SV3 closed.

Saturday, June 27, 2020, 16:43: SV4 closed.

Saturday, June 27, 2020, 16:50: SV5 closed.

Saturday, June 27, 2020, 16:51: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 16:52 :SV3 and SV4 opened.

Saturday, June 27, 2020, 16:55: FC6=7.64e-12. IG1=3.31e-6

Saturday, June 27, 2020, 16:56 : SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 16:57 : SV5 open. No trip!!!

 Saturday, June 27, 2020, 17:1: FC6=1.91e-11A

 What's FC6 value for coil=0?

Saturday, June 27, 2020, 17:17: Coil=0

 Saturday, June 27, 2020, 17:18: FC6=2.71e-11A.

Now coil=55A gives a similar current as coil=0... Back to coil=40A.

Saturday, June 27, 2020, 17:53: SV3 closed.

Saturday, June 27, 2020, 17:58: SV4 closed.

 Saturday, June 27, 2020, 18:07: SV5 closed.

FC6=7.47e-12A. IG1=3.23e-6T.

Saturday, June 27, 2020, 18:07 : The second set of measurements for coil=40. The proportion of current coming from the gas is 59.94%. There is an increase factor of  2.50 compared to the no gas situation.

Saturday, June 27, 2020, 18:07: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Saturday, June 27, 2020, 18:08: SV3 and SV4 opened.

Saturday, June 27, 2020, 18:18: SV1 closed. SV5 open/closed x5.

Saturday, June 27, 2020, 18:18 : SV5 open. No trip!!!

 Saturday, June 27, 2020, 18:4: FC6=1.84e-11. IG1=3.38e-6T.

 Saturday, June 27, 2020, 18:4: Done for today.


Sunday, June 28, 2020, 14:38: FC6=1.62e-11A. IG1=3.30e-6T.

 The plan for today Sunday, June 28, 2020 is:

  1. Perform an efficiency  measurement for coil=65A.
  2. Coil sweep with all gas lines closed.

 Sunday, June 28, 2020, 14:50: Coil=65A. Provides highest current. For coil<100A.

Sunday, June 28, 2020, 14:59: FC6=2.16e-11A. IG1=3.31e-6T.

Sunday, June 28, 2020, 15:08: SV3 closed.

Sunday, June 28, 2020, 15:13:FC6=1.94e-11.A.

Sunday, June 28, 2020, 15:14. SV4 closed.

Sunday, June 28, 2020, 15:30:SV5 closed.

Sunday, June 28, 2020, 15:30: FC6=3.82e-12A. IG1=3.14e-8T.

Sunday, June 28, 2020, 15:32: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 15:32: SV3 and SV4 opened.

Sunday, June 28, 2020, 15:37:FC6=3.22e-12A. IG1=3.14e-6T.

Sunday, June 28, 2020, 15:38: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 15:38: SV5 open. No trip!!!

Sunday, June 28, 2020, 15:55: FC6=1.79e-11A. IG1=3.31e-6T.

Sunday, June 28, 2020, 16:02: SV3 closed.

Sunday, June 28, 2020, 16:08: SV4 closed.

Sunday, June 28, 2020, 16:22: SV5 closed.

Sunday, June 28, 2020, 16:22: 3.31e-12A. IG1=3.05e-6T.

Sunday, June 28, 2020, 16:23: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 16:24: SV3 and SV4 opened.

Sunday, June 28, 2020, 16:25: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 16:25: SV5 open. No trip!!!

Sunday, June 28, 2020, 16:37: 1.82e-11. IG1=3.23-8T.

Sunday, June 28, 2020, 16:51:SV5 closed.

Sunday, June 28, 2020, 16:51:SV3 and SV4 closed.

Sunday, June 28, 2020, 17:25: Coil sweep finished .

Sunday, June 28, 2020, 17:26: SV1 on. SV3 open/closed x5. SV4 open/closed x5.

Sunday, June 28, 2020, 17:27: SV3 and SV4 opened.

Sunday, June 28, 2020, 17:28: SV1 closed. SV5 open/closed x5.

Sunday, June 28, 2020, 17:28 :SV5 open. No trip!!!

Sunday, June 28, 2020, 17:29: Coil=0A.

Sunday, June 28, 2020, 17:33: Done for the day.

 

 

Entry  Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando) FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

Monday, June 22, 2020, 08:45: Roughing.

Monday, June 22, 2020, 09:17: Turbo pumps on.

Monday, June 22, 2020, 09:22: Ion gauge on.


Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.

Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.

Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).

Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.

Open w/ SV3 & SV4.

Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.

Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open

Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.

Tuesday, June 23, 2020, 08:29: Optics on.

Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T

Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.

Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.

 

 

 

Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt

Tuesday, June 16, 2020, 11:01: Turbo pumps on.


Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.

Wednesday, June 17, 2020, 07:51: Power / Sources on.

Wednesday, June 17, 2020, 07:52: Opened IV4.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.89 6.17
 TBHT 27.73

8.71

 COIL + EE 27.66 2.82
 TGHT  27.74 6.68

Wednesday, June 17, 2020, 07:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 4 A per min. Optics on.

Wednesday, June 17, 2020, 08:03: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 09:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

12:50 Approx TRIP*. Vacuum spike?

Wednesday, June 17, 2020, 13:10: Sources back on. Auto-ramping TGHT / TBHT to 450 / 150 A @ 4 A per min. Optics switched back on.

Wednesday, June 17, 2020, 13:42: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 15:25: Auto-ramping TGHT / TBHT to 500 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 15:48: Auto-ramping TGHT / TBHT to 525 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 16:14: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 17:03: Scans complete

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.28 8.11
 TBHT 27.92

10.78

 COIL + EE 27.75 3.76
 TGHT  27.92 7.57

Wednesday, June 17, 2020, 17:09: TGHT brought down to 550 A. BIAS /  EE / EZL @ 0 kV.

Wednesday, June 17, 2020, 17:10: IV4 closed

Wednesday, June 17, 2020, 17:13: TBHT to 200 A.

Wednesday, June 17, 2020, 22:25: TSG:CG1A & TSG:CG1B leveling off. Reducing ~ On the strip tool. 


Thursday, June 18, 2020, 05:32: From 550 A / 200 A. Vacuum @ 5.63e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min. Max loop reached (5.500e-06T). Allow to out gas.


Sunday, June 21, 2020, 11:07: Auto-cooling @ 0.5 A per min. vacuum @ 4.29e-06T. 


Monday, June 22, 2020, 04:51: Auto-cooling @ 4 A per min. vacuum @ 1.49e-06T. 

Monday, June 22, 2020, 05:10: Sources / power off.

Monday, June 22, 2020, 05:13: Ion gauge & Turbo pumps off.

Monday, June 22, 2020, 06:46: Venting. HS waterline purged.

Entry  Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x

Salts: 

Li - 10 uL

Na - 10 uL

K - 5 uL

Rb - 10 uL

Cs - 15 uL

Wednesday, June 10, 2020, 08:55: Roughing.

Wednesday, June 10, 2020, 09:30: Turbo pumps on.

Wednesday, June 10, 2020, 09:35: Ion gauge on.

Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.

Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.21 5.81
 TBHT 27.04

8.83

 COIL + EE 26.93 2.76
 TGHT  27.04 6.58

Wednesday, June 10, 2020, 14:02: Sources on.


Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. 

Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues? 

Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.

Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A. 

Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min. 


Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.  


Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.  TGHT @ 512 A. Vacuum @ 6.11e-06T.

Monday, June 15, 2020, 06:46:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.40 7.51
 TBHT 26.08

10.15

 COIL + EE 25.88 3.53
 TGHT  26.06 7.31

Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.

Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.

Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.

Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV. 


Tuesday, June 16, 2020, 06:57: IV4 closed & reset.

Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.

Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting.

Entry  Tuesday, May 19, 2020, 06:01, Aaron Schmidt, , , , , , 42972-8, Problems/Solutions, Leak check / Troubleshoot May_19-20_Leak_check_-_FS#3.docxMess_inside_TS_-_1.jpgMess_inside_TS_-_2.jpgBlock_water_leak_visible.jpg

 https://elog.triumf.ca/TIS/Test-Stand/791

https://elog.triumf.ca/TIS/Test-Stand/792

Tuesday, May 19, 2020, 06:01: Venting. 

Troubleshoot / Leak Check ISAC TS.

Tuesday, May 19, 2020, 06:35: Quite a bit of condensation was found inside the TS. Most lines had water on them.

Tuesday, May 19, 2020, 07:09: Wiped out the interior. Running a fan inside to aid in the drying.

Tuesday, May 19, 2020, 08:20:

Opened lines FS#2,3,4. No visual leaks detected.

Installed previously used/outgassed HS (Ferran's tests). Replaced all the bolts.

Roughing.

Tuesday, May 19, 2020, 08:32: Multiple attempts made to rough. Doors not sealing?

Tuesday, May 19, 2020, 08:58: IT FINALLY SEALED!!! (Assistance was provided on the doors)

Tuesday, May 19, 2020, 09:02: BV1B Open.

Tuesday, May 19, 2020, 10:54: Vacuum @ 15.339 T.

Tuesday, May 19, 2020, 10:59: FS#2 opened.

Tuesday, May 19, 2020, 11:02: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:03: FS#3 opened.

Tuesday, May 19, 2020, 11:06; Vacuum @ 15.069 T

Tuesday, May 19, 2020, 11:07: FS#4 opened.

Tuesday, May 19, 2020, 11:10: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:11: FS#5 Opened.

Tuesday, May 19, 2020, 11:13: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:30: Close & purge cooling lines. Observe Vacuum.


Left open overnight. Ran the fan on it this morning.

All water lines into the TS closed. FS# 2,3,4,5, & 8.

Wednesday, May 20, 2020, 08:35: Roughing.

Wednesday, May 20, 2020, 08:50: BV1B open. Vacuum at 8 T and dropping.

Wednesday, May 20, 2020, 10:12: Vacuum at 2.635 T.

Wednesday, May 20, 2020, 10:14: FS#2 opened.

Wednesday, May 20, 2020, 10:17: Vacuum @  2.646 T.

Wednesday, May 20, 2020, 10:19: FS#3 opened.

Wednesday, May 20, 2020, 10:24: Vacuum @ 2.764  T

Wednesday, May 20, 2020, 10:25: FS#4 opened.

Gradual increase is noted, but no obvious spike.

Wednesday, May 20, 2020, 10:28: Vacuum @  2.816 T.

Wednesday, May 20, 2020, 10:32: Vacuum @ 3.606 T.

Starting to spike.

Wednesday, May 20, 2020, 10:36: Closed supply / return. Purged. Closed the lines Vacuum @  4.173 T.

Wednesday, May 20, 2020, 10:54: Vacuum @ 3.984 T.

Wednesday, May 20, 2020, 10:58: FS#2 opened.

Wednesday, May 20, 2020, 11:10: Vacuum @ 3.858 T.

Wednesday, May 20, 2020, 11:11: FS#3 opened. Vacuum spiking 4.3T +

Wednesday, May 20, 2020, 11:15: Closed supply / return. Purged. Closed the lines Vacuum @  4.614 T.

Wednesday, May 20, 2020, 11:47: Venting.

Wednesday, May 20, 2020, 13:12: Significant leak discovered on FS#3. Pressurized the lines to full pressure with water and waited 15 minutes. Small drops seen pushing out from the water block.

Removed old O-ring (Appeared to have a warp/bulge, very faint) Replaced with Sn C-Seal "Small Package" MIL-DTL-117H-TII C-E S-I / MIL-PRF-131K C-II.

T= 0.095"

D= 0.424"

Wednesday, May 20, 2020, 14:02: Roughing.

Wednesday, May 20, 2020, 14:08: BV1B open.

Wednesday, May 20, 2020, 15:28: Vacuum @ 1.242 T

Wednesday, May 20, 2020, 15:29: Open FS#3.

Wednesday, May 20, 2020, 15:31: Close FS#3 supply / return. Purged. Closed the lines Vacuum @  2.462 T.

Wednesday, May 20, 2020, 15:42: Start venting to 200 T. 


Removed Right coil line on FS#3 and blanked it off (G) (H).

Monday, May 25, 2020, 14:00: Roughing.

Monday, May 25, 2020, 14:02: BV1B open.

Monday, May 25, 2020, 15:16: Turbo pumps on.

Monday, May 25, 2020, 15:25: Ion gauge on.


Wednesday, May 27, 2020, 10:28: Ion gauge & turbo pumps off. 

FS#(G)(H) right coil line -  Lower G water block replaced leak checked / cleaned.

Line re-installed.

Wednesday, May 27, 2020, 12:56: Roughing.

Wednesday, May 27, 2020, 13:39: Turbo pumps on.

Wednesday, May 27, 2020, 13:47: Ion gauge on.


Monday, June 01, 2020, 06:47: Vacuum @ 5.12e-06T

Monday, June 01, 2020, 06:50: FS#3 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 06:57: FS#2 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:01: FS#4 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:04: FS#5 opened. Vacuum @ 5.10e-06T.

Monday, June 01, 2020, 07:12: PS on

Monday, June 01, 2020, 07:15: FS#8 opened. Vacuum @ 5.03e-06T.

Monday, June 01, 2020, 07:16: Sources on.

Monday, June 01, 2020, 07:18: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. Vacuum limits adjusted:

7.000e-06 Vacuum ok, increment when less than this value.

8.000e-06 Vacuum exceeds, the last increment on TGHT / TBHT is backed off.

Monday, June 01, 2020, 09:17: Halt, adjust. Continue Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min.Vacuum @5.19 e-06T

Monday, June 01, 2020, 10:37: Auto-ramping TGHT / TBHT to 400 / 200 A @ 2 A per min.Vacuum @ 6.29e-06T.

Monday, June 01, 2020, 11:05: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2 A per min.Vacuum @ 6.70e-06T.

Monday, June 01, 2020, 12:18: Tripped* restarted* Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.Vacuum @ 6.70e-06T.

Tripped as the TGHT / TBHT "good vac" interlock is at 7.30e-06T.

Monday, June 01, 2020, 17:10: Lowered TGHT to 325A to avoid a trip and continue outgassing. Vacuum @ 7.00e-06T.


Tuesday, June 02, 2020, 06:06: Manually tap TGHT up to 350 A.

Tuesday, June 02, 2020, 06:39: Manually tap TGHT up to 375 A.


Wednesday, June 03, 2020, 09:37: Manually tap TGHT up to 400 A. Vacuum, @ 6.68e-06T.

Wednesday, June 03, 2020, 09:44: Manually tap TGHT up to 400 A. Vacuum, @ 6.90e-06T.

Wednesday, June 03, 2020, 10:45: Tripped* restarted* Auto-ramping TGHT / TBHT to 400 / 200 A @ 4 A per min.Vacuum @ 5.53e-06T.


Friday, June 05, 2020, 06:19: Manually tap TGHT up to 425 A. 


Tuesday, June 09, 2020, 19:57: Auto-Cooling from 475 A to 0 A @ 1 A per min. 


Wednesday, June 10, 2020, 06:32: PS off. Ion Gauge off. Turbo pumps off. 

Entry  Friday, March 27, 2020, 11:30, Aaron Schmidt, , , , , , , , Vacuum loss / spike / Shutdown Mar_27_-_2020_-_Vacuum_Trip.docx

The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.

Check daily


Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.


Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip. 

Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)

Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.

Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.


Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.


Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T. 


Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.


Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.


Friday, April 03, 2020, 05:05: Vacuum @ 9.213T. 


Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T. 


Tuesday, April 28, 2020, 11:11: Venting. 

    Reply  Tuesday, April 07, 2020, 10:53, Anders Mjos, , , , , , , , Vacuum loss / spike / Shutdown 

Aaron Schmidt wrote:

The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.

Check daily


Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.


Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip. 

Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)

Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.

Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.


Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.


Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T. 


Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.


Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.


Friday, April 03, 2020, 05:05: Vacuum @ 9.213T. 


Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T. 

Tuesday, April 07, 2020, 10:53:

Tried pumping down chamber with roughing pump. Looks like there is water in the system. Will leave it as is for now.


Tuesday, April 28, 2020, 12:30

Removed SiC#40 target and pumped down with HS lines blanked off. Used recycled SST gaskets.

Tuesday, April 28, 2020, 13:00

Still problem with water in the system. CG1 at about 25 Torr. Purging all water lines and pumping down again.

Entry  Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx

Tuesday, March 17, 2020, 11:37: Roughing.

FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).

Tuesday, March 17, 2020, 12:08: Turbo pumps on.

Tuesday, March 17, 2020, 12:13: IG1 on.


Wednesday, March 18, 2020, 04:31: Waterlines open. Vacuum ok @ 8.45e-07T.

Wednesday, March 18, 2020, 04:37: HV rack / 9-pin grounded.

Wednesday, March 18, 2020, 04:40: Power / Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.42 4.04
 TBHT 24.39

6.72

 COIL + EE 24.21 1.63
 TGHT  24.30 5.76

Wednesday, March 18, 2020, 04:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Wednesday, March 18, 2020, 04:51: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.

Wednesday, March 18, 2020, 04:52: Optics on / set. IV4 open.

Wednesday, March 18, 2020, 07:45: Fluctuation noticed on BIAS. No audible sparks. Conditioning.

Wednesday, March 18, 2020, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, March 18, 2020, 09:44: EZL Increased to 13 kV.

Wednesday, March 18, 2020, 09:51: Reset MB1 manually. Ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.76 5.00
 TBHT 25.49

7.61

 COIL + EE 25.35 2.04
 TGHT  25.32 6.14

Wednesday, March 18, 2020, 10:57: Mass, wire, & emittance scans complete.


Thursday, March 19, 2020, 11:41: Auto-cooling @ 1 A per min.

Thursday, March 19, 2020, 11:46: BIAS / EE / EZL @ 0 kV.


Monday, March 23, 2020, 05:15: IV4 closed / reset. 

Monday, March 23, 2020, 05:17: Power / sources off.

 

Entry  Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx

Thermocouples installed on EE. Double checked continuity & used a heat gun.

Wednesday, March 11, 2020, 13:30: Roughing.

Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment) 

Wednesday, March 11, 2020, 15:10: IG1 on.


Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.

 Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T

Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.

Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.

Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

W/ Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 17.7 17.8
250 / 150 26.4 28.1
350 / 200 34.1

39.0

450 / 230 41.4 48.0
580 / 230 43.1 49.0

Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.

Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.

Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T

W/O Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 15.5 15.6
250 / 150 26.6 27.6
350 / 200 35.0

38.9

450 / 230 42.6 48.1
580 / 230 46.3 51.9
580 / 230 @ 2:41 pm 43.3 49.3

Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.


Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.

Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.

Tuesday, March 17, 2020, 07:08: Venting.

Entry  Wednesday, March 04, 2020, 17:15, Fernando Maldonado, , , , , , , Problems/Solutions, Emittance rig communication 

Wednesday, March 04, 2020, 17:13: EPICS page indicated a sucesful scan but data was empty.

Wednesday, March 04, 2020, 17:13: Power suppply didn't respond to the voltage sweep

Wednesday, March 04, 2020, 17:14: Problem most likely similar to elog entry 531.

Wednesday, March 04, 2020, 17:14: Keiko contacted for a soft reboot.

Wednesday, March 04, 2020, 17:14: Emittance power supply now  responds.

Entry  Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60 

Monday, March 02, 2020, 14:36: Roughing.

Monday, March 02, 2020, 15:08: Turbo pumps on.


Remove HV cage (top). Reroute FS#3 back to cool EE

Tuesday, March 03, 2020, 08:11: Waterlines open. Vacuum ok @ 6.52e-07T.

HV cage top on. Data Logger removed. Wiring grounded.

Tuesday, March 03, 2020, 09:00: Power / sources / HV on.

Tuesday, March 03, 2020, 09:03: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.65 4.38
 TBHT 25.50

6.97

 COIL + EE 25.39 1.06
 TGHT 25.82 5.84

Tuesday, March 03, 2020, 09:08: BIAS / EE / EZL on.

Tuesday, March 03, 2020, 09:11: BIAS / EE / EZL @ 10 / 7.5 / -1 kV.

Tuesday, March 03, 2020, 09:15: BIAS / EE / EZL @ 20 / 12.5 / -1.5 kV. Read back on PS same / ok.

Tuesday, March 03, 2020, 09:17: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

Tuesday, March 03, 2020, 09:18: IV4 Opened.

Tuesday, March 03, 2020, 09:24: Optics on / set.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 11:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

FM

Tuesday, March 03, 2020, 18:30: BIAS/EE/EZL @ 0 kV.

Tuesday, March 03, 2020, 18:31: TGHT / TBHT to 400 / 200 A @ 4 A per min.

Nothing observed on the emittance scan regardless of the tune


Wednesday, March 04, 2020, 09:09:  Auto-ramping TGHT / TBHT to 500 / 210 A @ 4 A per min. 

Wednesday, March 04, 2020, 10:47:  Auto-ramping TGHT / TBHT to 580/ 230 A @ 4 A per min. 

*Got busy in the morning, starting later than expected

Wednesday, March 04, 2020, 13:47: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

*Seminar at 2:30 I'll continue later

Wednesday, March 04, 2020, 16:08: Emittance rig troubleshoot (see e-log 778)

Wednesday, March 04, 2020, 19:00: BIAS/EE/EZL @ 0 kV.

Wednesday, March 04, 2020, 19:09: TBHT to 200A to try preserver some salts for tomorrow tests


Friday, March 06, 2020, 17:50: Auto-cooling 4 A/min .


Monday, March 09, 2020, 12:08: IV4 closed

Monday, March 09, 2020, 12:08: IG1 Off.

Monday, March 09, 2020, 12:09: Turbos off

Monday, March 09, 2020, 16:19: Venting

Entry  Thursday, February 27, 2020, 07:20, Aaron Schmidt, , , , , , , , FS#3 - Fitting change out 

Thursday, February 27, 2020, 07:10: Swapped out an old brass fitting on the supply line going into FS#3 - Line K.

Replaced w/ SS fitting for interchangeability w/ other lines in case a bypass is needed.

Entry  Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx

 Ta#60 (Unconditioned) - Salts in.

Thursday, February 20, 2020, 14:04: Roughing.

Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).

Thursday, February 20, 2020, 14:43: IG1 on.


Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.

Friday, February 21, 2020, 06:38: Turbo pumps off.

EE Thermocouples req'd.

Friday, February 21, 2020, 11:15: Vented.

9-pin removed. Thermocouples installed.

Friday, February 21, 2020, 13:52: Roughing.

Friday, February 21, 2020, 14:24: Turbo pumps on.


EE Waterline - On

Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T

Wednesday, February 26, 2020, 07:43: Power / sources on.

Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
 250 / 150 20.8 24.0
 350 / 200 22.5

29.7

 450 / 230 20.1 30.9
 580 / 230 14.5 28.8
580 / 230 @ 2:52 pm 6.2 21.6

Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.

Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)

Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.


Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.

Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.

No water/cooling running into EE.

Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.

Thursday, February 27, 2020, 07:28: Power / Sources on.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
0 / 0 22.8 22.9
 50 / 25 22.6 22.7
100 / 50 22.6

22.6

150 / 100 22.2 23.3
200 / 150 22.0 24.9
200 / 150 7am Day 2 21.2 23.9
250 / 200 23.3 29.3
300 / 230 22.4 30.6
350 / 230 19.2 27.7
450 / 230 18.5 29.7
580 / 230 13.4 27.3

Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.

Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.

Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.

Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.


Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.

Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.

Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.

Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.

Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.


Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)

Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off.

Entry  Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS UC#31.docx

Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*

Wednesday, February 12, 2020, 10:57: Roughing.

Wednesday, February 12, 2020, 11:30: Turbo pumps on.


Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.

Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.

Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.


Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.


Thursday, February 20, 2020, 07:33: PS, sources off, locked out.

Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.

Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.

Thursday, February 20, 2020, 09:22: Venting.

 

Entry  Tuesday, February 11, 2020, 14:27, Aaron Schmidt, , , , , , , , Pump down empty Chamber 

Tuesday, February 11, 2020, 14:27: UC#32 HS removed.

Tuesday, February 11, 2020, 14:27: Roughing.


Wednesday, February 12, 2020, 09:05: Venting.