  Test-Stand, Page 11 of 53  Not logged in ELOG logo
Entry  Wednesday, August 17, 2016, 08:19, Aaron Schmidt, , , , , 41882-4, 41751-5, , HS Test OR Clean HS_41751-5_TEST.docxTS-2016-08-17-11-45.rga20160824_143555.jpg20160824_143558.jpg
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Friday, March 24, 2017, 14:43, Aaron Schmidt, Ta#51, LP-SIS, ITW, TM2, 41790-4, 41751-5, In progress, Conditioning Ta#51 9x
Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo pumps on.
Friday, March 24, 2017, 16:04: Ion gauge on.
Entry  Monday, August 15, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-4, , HS Test OR Clean HS_41751-4_TEST.docxTS-2016-08-15-11-45.rga20160824_143550.jpg
Heat Shield Test (OR Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Friday, October 06, 2017, 12:14, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 9x
NOTE* : The right coil terminal terminates into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12: Roughing. * Note on installation. Middle TBHT prong 'stuck' to insulator slightly and was moved to fit. Fit ok
in Jig.
Entry  Friday, October 13, 2017, 15:53, Aaron Schmidt, SiC#37, HP-FEBIAD, ITE, TM4, 39530-10, 41751-4, In progress, Conditioning SiC#37 (ii) 10x
Previous short fixed. Grid clamp removed. Grid tack welded.
Friday, October 13, 2017, 15:49: Roughing.

By Anders
Entry  Monday, August 22, 2016, 08:20, Aaron Schmidt, , , , , 41882-4, 41751-3, , HS Test Full Clean HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Thursday, October 27, 2016, 13:37, Aaron Schmidt, UC#18, LP-SIS, ITW, TM2, , 41751-3, In progress, Conditioning Heat shield for UC#18 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga
Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27: Turbo pumps started.
Thursday, October 27, 2016, 14:33: Ion gauge on.
Entry  Wednesday, August 10, 2016, 08:09, Aaron Schmidt, , , , , 41882-4, 41751-2, , HS Test Full Clean HS_41751-2_TEST.docxTS-2016-08-10-11-45.rga20160824_143539.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Friday, March 10, 2017, 15:42, Aaron Schmidt, UC#19, , , , 41882-4, 41751-2, In progress, Conditioning Heat shield for UC#19 TS-2017-03-10-16-20.rgaOMEGA_OM-DAQPRO-5300_22-Mar-17_09.05.23.dlp
Friday, March 10, 2017, 15:40: Roughing.
Friday, March 10, 2017, 15:58: Turbo pumps started.
Friday, March 10, 2017, 16:19: Ion gauge on.
Entry  Wednesday, August 03, 2016, 13:47, Aaron Schmidt, Ta#49, HP-SIS, ITW, TM2, , 41751-10, , Conditioning Ta#49 7x
Wednesday, August 03, 2016, 13:47: Roughing
Wednesday, August 03, 2016, 14:17: Turbo pumps started.
Wednesday, August 03, 2016, 14:22: Ion gauge on.
Entry  Monday, August 08, 2016, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-1, , HS Test Full Clean HS_41751-1_TEST.docxTS-2016-08-08-11-45.rga20160824_144103.jpg20160824_144106.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Tuesday, October 18, 2016, 13:29, Aaron Schmidt, Ta#50, LP-SIS, ITE, TM4, 41790-5, 41751-1, In progress, Conditioning Ta#50 9x
Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46: Turbo pumps started.
Tuesday, October 18, 2016, 13:52: Ion gauge on.
Entry  Friday, September 30, 2016, 11:11, Aaron Schmidt, SiC#35, HP-FEBIAD, ITW, TM2, 39530-9, 41120-8, Done, Conditioning SiC#35 6x
Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Entry  Monday, June 27, 2016, 13:11, Aaron Schmidt, SiC#33, HP-SIS, ITW, TM2, , 41120-7, , Conditioning SiC#33 8x
Monday, June 27, 2016, 12:05: Roughing.
Monday, June 27, 2016, 13:08: Turbo pumps on.
Monday, June 27, 2016, 13:15: Ion Gauge on.
Entry  Thursday, April 21, 2016, 14:26, Aaron Schmidt, Ta#48, HP-SIS, ITW, TM2, 41369-5, 41120-5, In progress, Conditioning Ta#48 TS-2016-04-21_Ta#48.rga
Thursday, April 21, 2016, 14:25: Begin pumping down.
Thursday, April 21, 2016, 15:02: Turbo pumps started.
Thursday, April 21, 2016, 15:34: Ion gauge on.
Entry  Friday, October 16, 2015, 12:26, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14 2015-10-22_TS_Leak.docx
Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06: Started turbos.
Friday, October 16, 2015, 13:25: Turbos at speed. Vacuum at 3.2E-5 T
    Reply  Tuesday, November 03, 2015, 09:00, Anders Mjos, Target tube only, , , , , 41120-4, In progress, Conditioning HS for UC#14 
Tuesday, November 03, 2015, 08:59: Starting TGHT ramping to 580 A at 1 A/min

Thursday, November 05, 2015, 16:39 : Ramping down

Monday, November 09, 2015, 08:13: Turbos stopped
Entry  Friday, March 04, 2016, 14:23, Anders Mjos, Target tube only, LP-SIS, ITW, TM2, 39459-2, 41120-10, In progress, Conditiong Heat Shield for UC#15 
Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos started
Friday, March 04, 2016, 15:11: Turbos at speed. Vacuum at 3.5E-5 T.
Entry  Wednesday, March 30, 2016, 16:32, Aaron Schmidt, Ta#47, LP-SIS, ITE, TM4, 41790-1, 41120-05, In progress, Conditioning Ta#47 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx
Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34 : Turbos started -AM
Wednesday, March 30, 2016, 18:50: Turbos at speed. Vacuum at 1.8E-6 T -AM
Entry  Wednesday, March 16, 2016, 09:59, Anders Mjos, Target tube only, , , TM1, 39459-2, 40898-2, In progress, Conditiong Heat Shield for UC#15 
Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58: Roughing
Wednesday, March 16, 2016, 12:54: Started Turbo pumps