Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 10 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O#down Status Subject Text Attachments
  978   Friday, August 25, 2023, 17:21 Aaron SchmidtNb#11LP-IG-LISITWTM245447-942132-4In progressConditioning Nb#11Replacement for Nb#10
Friday, August 25, 2023, 17:15: Roughing.
Friday, August 25, 2023, 17:57: Vacuum
 Nb#11_Conditioning.docx 
  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assemblyNo UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
  
  971   Thursday, July 06, 2023, 16:55 Aaron SchmidtNb#10LP-IG-LISITWTM245447-742132-2In progressConditioning Nb#10Thursday, July 06, 2023, 16:13: Roughing.
Thursday, July 06, 2023, 16:41: TP1B
on.
 Nb#10_Conditioning.docx 
  686   Friday, September 21, 2018, 11:41 Aaron SchmidtUC#26LP-IG-LISITETM4 42132-1In progressConditioning Heat Shield for UC#26Friday, September 21, 2018, 11:40: Roughing
Friday, September 21, 2018, 11:41:
Doors sealed for roughing.
 TS-2018-09-21-14-53.rgaUC#26.docx 
  537   Friday, September 02, 2016, 15:47 Aaron SchmidtSiC#34LP-IG-LISITETM439814-V2-141751-9 Conditioning SiC# 34Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18:
Turbos started -AM
 ER-580-270-m40.txtITE-TM4-SiC#34-LP-IG-LIS_Test_Stand.docxSiC#34.docxTS-2016-09-06-08-12.rga 
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  521   Monday, July 11, 2016, 13:51 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulatorsMonday, July 11, 2016, 13:49: Begin roughing.



 Tube_only_test_-_with_insulators_&_new_EE_Maldonado_160712.zip160713.zip 
  522   Thursday, July 14, 2016, 13:22 Aaron Schmidt     41751-7 Tube only - NEW EE w/insulators - No PEThursday, July 14, 2016, 14:41:  Roughing
started.
Thursday, July 14, 2016, 15:41: Turbo
 Tube_only_Test_-__New_Insulators-No_PE-160715.zip160716.zip 
  523   Monday, July 18, 2016, 12:20 Aaron Schmidt     41751-7 Tube only - No EE - No PEMonday, July 18, 2016, 12:19: Roughing.
Monday, July 18, 2016, 13:13: Turbo
pumps on.
 Tube_only_-_No_EE_-_No_PE.zip 
  524   Tuesday, July 19, 2016, 15:15 Aaron Schmidt     41751-7 Tube only - No EE - With PETuesday, July 19, 2016, 15:14: Roughing.
Tuesday, July 19, 2016, 15:48: Turbo
pumps started.
 Tube_only_-_No_EE_-_With_PE.zip 
  535   Wednesday, August 24, 2016, 09:16 Aaron Schmidt    41882-441751-6 HS Test OR CleanHeat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge
 7x 
  564   Wednesday, January 25, 2017, 09:48 Aaron Schmidt    41882-441751-6DoneOut gas Heat Shield for Target cleaning testNo EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in
 7x 
  565   Wednesday, January 25, 2017, 14:54 Aaron Schmidt    42218-941751-6DoneTarget cleaning test HP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}


 HP-SIS_CC_Clean.docxTS-2017-01-30-11-00.rgaOMEGA_OM-DAQPRO-5300_01-Feb-17_15.36.02.dlp 
  566   Wednesday, January 25, 2017, 14:55 Aaron Schmidt    42218-641751-6DoneTarget cleaning test (Long) HP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 HP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_07-Feb-17_09.17.23.dlpTS-2017-02-01-10-40.rgaTS-2017-02-03-08-50.rga 
  567   Wednesday, January 25, 2017, 14:56 Aaron Schmidt    42218-1441751-6DoneTarget cleaning test LP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp 
  568   Wednesday, January 25, 2017, 14:57 Aaron Schmidt    42218-1141751-6DoneTarget cleaning test LP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga 
  570   Wednesday, February 15, 2017, 13:42 Aaron Schmidt    42218-1141751-6Problems/SolutionsVacuum Check (Water leak)*Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.*
  
  571   Tuesday, February 21, 2017, 10:35 Aaron Schmidt    42218-1141751-6Problems/SolutionsWater leak (E)(G)Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water
  
  594   Friday, June 30, 2017, 13:31 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53 Friday, June 30, 2017, 13:48: Roughing.
Friday, June 30, 2017, 14:26: Turbo
pumps on.
 Ta#53.docxTS-2017-06-30-14-35.rga 
  596   Monday, July 10, 2017, 13:27 Aaron SchmidtTa#53HP-SISITWTM242218-641751-6In progressConditioning Ta#53Monday, July 10, 2017, 14:03: Roughing.
Monday, July 10, 2017, 14:27: Turbo
pumps started.
 7x 
ELOG V2.9.2-2455