724
|
Saturday, May 25, 2019, 12:43 |
Aaron Schmidt | Test FEBIAD / TM4 | LP-FEBIAD | | TM4 | 395530-3 | 42752-5 | In progress | Installed TM4 Source Tray | Silver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings |
|
|
723
|
Wednesday, May 22, 2019, 13:47 |
Aaron Schmidt | | | | | | | | Calibrated Masscorr | Wednesday, May 22, 2019, 13:44: Calibration
Confirmed.
New Masscorr setup: |
|
|
722
|
Tuesday, May 14, 2019, 10:22 |
Aaron Schmidt | ZrC#8 | LP-SIS | ITE | TM2 | 43044-5 | 42972-3 | In progress | Conditioning ZrC#8 HS | Tuesday, May 14, 2019, 10:21: Roughing
Tuesday, May 14, 2019, 10:51: Turbo
pumps on. |
|
|
721
|
Tuesday, May 07, 2019, 13:16 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | | In progress | 9-pin connection configuration (Using Ta#58) | Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin |
|
|
720
|
Friday, May 03, 2019, 08:30 |
Anders Mjos | | | | | | | In progress | Training | Training: Venting and pump down
Friday, May 03, 2019, 08:30: Turbo
pumps stopped. |
|
|
719
|
Friday, April 26, 2019, 13:45 |
Aaron Schmidt | Ta#58 | LP-SIS | ITE | TM2 | 43044-4 | 42972-7 | In progress | Conditioning Ta#58 HS | Friday, April 26, 2019, 13:43: Roughing.
Friday, April 26, 2019, 14:12: Turbo
pumps on. |
7x |
|
718
|
Tuesday, April 23, 2019, 14:39 |
Aaron Schmidt | | LP-SIS | | | | 42752-8 | Done | Conditioning UC#28 HS | Tuesday, April 23, 2019, 14:39: Roughing.
Tuesday, April 23, 2019, 15:09: Turbo
pumps started. |
|
|
717
|
Monday, April 15, 2019, 14:42 |
Aaron Schmidt | | LP-SIS | | | | 42972-1 | Done | Conditioning UC#27 HS & test FS#3 | New coil lines installed for P2N testing
later.
Monday, April 15, 2019, 14:15: Roughing. |
|
|
716
|
Friday, April 05, 2019, 07:02 |
Aaron Schmidt | | LP-FEBIAD | | | 395530-3 | 42752-5 | In progress | TS operation test - LP FEBIAD | Due to previous issues, a full run / test
should be performed on the ISAC Test Stand.
Friday, April 05, 2019, 07:00: RGA |
|
|
715
|
Wednesday, March 27, 2019, 11:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | BIAS PS replaced. Test | Wednesday, March 27, 2019, 10:25: BIAS
@ 1 kV
952V - 548uA on controls readback |
|
|
714
|
Tuesday, March 26, 2019, 10:44 |
Aaron Schmidt | | | | | | | Problems/Solutions | EZL PS replaced. Test | EZL checked. OK @ 5kV
BIAS PS issues.
2.3kV on screen. Read back on PS |
|
|
713
|
Thursday, March 21, 2019, 08:33 |
Aaron Schmidt | | | | | | | | Pump down TS | Thursday, March 21, 2019, 08:32: Roughing. |
|
|
712
|
Monday, March 11, 2019, 13:56 |
Aaron Schmidt | | | | | | | Done | TGHT PS replaced | Monday, March 11, 2019, 13:55: The TGHT
PS was replaced.
Brought up to 20 A. Operation. ok. |
|
|
711
|
Thursday, March 07, 2019, 07:55 |
Aaron Schmidt | | LP-FEBIAD | | | | | Problems/Solutions | TS restart - Troubleshoot BIAS spark | Thursday, March 07, 2019, 07:48: IV4 reset,
BV6 & TMS TP6 reset.
Turbo pump restarted. |
|
|
710
|
Friday, March 01, 2019, 14:51 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Gas lines test & Emissions measurement prep | Friday, March 01, 2019, 14:50:
SV5 replaced with a new valve.
SV1 disconnected from the He line |
|
|
709
|
Friday, February 22, 2019, 11:11 |
Aaron Schmidt | | LP-FEBIAD | | | | | | Gas line backing pump tests | Backing "mini pump" testing.
-Open gas lines & auto ramp (If
using HV, close up the back) |
|
|
708
|
Thursday, January 24, 2019, 08:42 |
Aaron Schmidt | | | | | | | | IG6 fix (w/ instruction) | TMS:IG6 had continued communication errors
post power outage & would not switch
on. After a power loss, IG6 switches automatically |
|
|
707
|
Monday, January 21, 2019, 10:55 |
Aaron Schmidt | | | | | | | | 2019 Anode tests FM-1 | Monday, January 21, 2019, 10:50: RGA on.
Monday, January 21, 2019, 10:54:
Waterlines opened. No response on RGA. Vacuum |
|
|
706
|
Monday, January 14, 2019, 09:47 |
Aaron Schmidt | | | | | | | | TS restart after power outage | Monday, January 14, 2019, 09:00: Epics
white out
Ref: Fault report 11993 (11981 |
|
|
705
|
Thursday, January 10, 2019, 11:38 |
Aaron Schmidt | | | | | | | | Power outtage prep | Thursday, January 10, 2019, 11:32: Power
down TS. Lock out.
Thursday, January 10, 2019, 11:36: |
|
|