  388   Thursday, June 19, 2014, 10:48 Anders Mjos      Problems/SolutionsFC0 did not retract from beam lineUpon inspection it was found that the bolt
attaching the FC to the actuator had fallen
off. The bolt was reattached and FC0 can
  
  387   Wednesday, June 18, 2014, 09:23 Anders Mjos      Problems/SolutionsTSH:MB1 Trip & MB1 June 10th water leakA water leak on MB1 was found and reported
by operations on June 10th e fault 7429
MB1 can not be switched on due to
  
  386   Tuesday, June 17, 2014, 15:22 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressSiC#30 HV and Heaters Conditioning

    

       
            
 SiC#30_Conditioning_3rd_time.docx 
  385   Monday, June 16, 2014, 09:12 Anders Mjos      In progressEmpty chamberMonday, June 16, 2014, 09:12: Roughing

Tuesday, June 17, 2014, 14:38:
Venting 
  
  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  383   Thursday, June 12, 2014, 09:28 Anders Mjos      Problems/SolutionsElevated backing pressure on ISAC Test Stand TMS:RP2

    

       
            
  
  382   Monday, May 26, 2014, 14:15 Aurelia LaxdalSiC#30HP-FEBIADITETM3  DoneSiC#30 HV and Heaters Conditioning HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line
 SiC#30_Conditioning_2nd_time.docx 
  381   Wednesday, May 21, 2014, 17:05 Aurelia LaxdalSiC#30HP-FEBIADITETM3  In progressSiC#30 HV and Heaters conditiongAs per Friedhelm the conditioning settings
are:


  
  380   Tuesday, May 20, 2014, 12:39 Anders Mjos      DoneFEBIAD Cathode Negative BIAS configurationAs per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co.
  
  379   Tuesday, May 20, 2014, 11:17 Anders Mjos      Problems/SolutionsBurnt off GND connection on Service CapThe ground connection between B and F (ISK4523D
Rev 6) was found burnt off. It will be switched
out as per CATHODE BIAS configuration (ISK4563D
  
  378   Thursday, May 15, 2014, 14:58 Anders Mjos      Problems/SolutionsIOC rebooted to recover from white-out.Restarted archivers.   
  377   Monday, May 12, 2014, 14:20 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressConditioning SiC#30Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting
turbos
 SiC#30_Conditioning.docx 
  376   Friday, May 09, 2014, 10:48 Anders Mjos      Problems/SolutionsEPICS white-out e-fault 7380Monday, May 12, 2014, 10:02: Jane R. power
cycled the hardware. EPICS is back up. Sources
archiver required a restart.
  
  375   Thursday, May 08, 2014, 15:09 Anders Mjos      Problems/SolutionsSOURCES archiver reported stopped Archiver restarted.   
  374   Monday, April 28, 2014, 10:23 Anders Mjos      In progressCu-strip cleaning test - sample #2, cleanedMonday, April 28, 2014, 10:23: Started
roughing
Monday, April 28, 2014, 10:48: Started
  
  373   Wednesday, April 23, 2014, 14:16 Anders Mjos      DoneCu-strip cleaning test - sample #1, not cleanedWednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34
: Starting turbos
 Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg 
  372   Wednesday, April 23, 2014, 09:37 Anders Mjos      Problems/SolutionsStarted Sources archiverThe archiver was not running   
  371   Friday, April 04, 2014, 17:01 Rick MaharajUC#9LP-SISITWTM1 39230-3DoneConditioning Heatshield for UCx#9Friday, April 04, 2014, 16:26: Heatshield/Ionsource
assembly for UC LP SIS  installed in
test stand with Ta tube as heat load.
  
  370   Friday, April 04, 2014, 08:24 Anders MjosTiC#4HP-SISITETM3  In progressVenting 

    
  
  369   Thursday, April 03, 2014, 16:46 Aurelia LaxdalTiC#4HP-SISITETM3  DoneHV and Heaters ConditioningHV and Heaters Conditioning had finished.
The target was cooled down and it's ready
for the on-line installation.
 ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx 