ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
1024
|
Monday, October 07, 2024, 09:54 |
Aaron Schmidt | | | | | | | | Pump down empty chamber / IG6 fix | Monday, October 07, 2024, 09:54:
Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: |
|
1023
|
Thursday, October 03, 2024, 16:26 |
Aaron Schmidt | Ta#68 | HP-SIS | ITE | TM2 | 45447-26 | 45235-16 * | | Conditioning Ta#68 | HS note:
Base# 45235-16
Lid# 39956-8 |
|
1022
|
Friday, September 20, 2024, 14:22 |
Aaron Schmidt | Ta# | LP-SIS | ITE | TM2 | 45447-18 | 45235-13 | | Conditioning Ta# | https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: |
|
1021
|
Tuesday, September 10, 2024, 16:24 |
Dave Neilson | TiC #24D | HP-SIS | ITW | TM3 | 45447-27 | 45235-25 | | Back up target testing and conditioning | Tuesday, September 10, 2024, 16:21:
Target installed in test stand by Brady
Tuesday, September 10, 2024, 16:21: |
|
1020
|
Friday, September 06, 2024, 12:08 |
Dave Neilson | | | | | | | Done | Test Stand repair/update | Friday, September 06, 2024: New TSH:TGHT
power supply has been installed and is now
functional. Magna-Power TSD-900/208. The |
|
1019
|
Tuesday, August 13, 2024, 09:31 |
Dave Neilson | | | | | | | Problems/Solutions | Troubleshooting HV sparks and FC0 signal | Monday, August 12, 2024, 17:00 EOD.
target installed, roughed, turbos on. No
effect on vacuum from turning on water cooling |
|
1018
|
Friday, August 09, 2024, 21:08 |
Ferran Boix Pamies | Ta#67 Thin foils | LP-SIS | ITE | TM4 | 45447-14 | 45235-10 | In progress | Ta#67 thin foil retesting | Friday, August 09, 2024, 21:07 Insulators,
retainer and Re foil have been replaced,
source cup machined so the ion source does |
|
1017
|
Tuesday, August 06, 2024, 15:50 |
Aaron Schmidt | | | | | | | Problems/Solutions | TS Troubleshooting - Leak/HV spark issues | Due to HV sparking & possible water
leaks on the previous TiC & Ta targets,
checks are to be performed. |
|
1016
|
Wednesday, July 31, 2024, 18:50 |
Aaron Schmidt | TiC Spare | HP-FEBIAD | ITW | TM4 | 45447-2 | 42752-7 | In progress | Conditioning Spare for TiC#7 | Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24:
TP1B on. |
|
1015
|
Monday, July 29, 2024, 23:02 |
Aurelia Laxdal | Ta#67 Thin foils | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Cooldown for removing the V wires | 22:55 Cooldown completed to remove
the voltage wires from inside the vacuum
box. |
|
1014
|
Thursday, July 25, 2024, 14:26 |
Dave Neilson | Ta#67 Thin foil | LP-SIS | ITE | TM3 | 45447-14 | 45235-10 | | Conditioning Ta#67 Thin foil | Thursday, July 25, 2024, 14:25 -
competing electrical checks prior to test
stand installation |
|
1013
|
Wednesday, July 24, 2024, 14:08 |
Dave Neilson | | | | | | | | Beam line window change - DUV installation | Wednesday, July 24, 2024, 14:07
Changed beamline window to DUV window (window
at magnet for target source viewing) |
|
1012
|
Tuesday, July 23, 2024, 09:43 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | Done | mass marker - reservoir testing | Wednesday, July 22, 2024, 11:41 -
target installed
Wednesday, July 22, 2024, 13:31 - |
|
1011
|
Wednesday, June 19, 2024, 15:50 |
Brady Borrmann | TiC#9 | HP-SIS | | | 45447-29 | 45235-19 | In progress | Conditioning TiC#9 | Wednesday, June19, 2024, Spare TiC HP-SIS
target installed. TiC#24C
Wednesday, June19, 2024, 15:00: Roughing |
|
1010
|
Thursday, May 30, 2024, 16:00 |
Aaron Schmidt | | LP-FEBIAD | | | 44692-4 | 45235-18 | In progress | Conditioning spare FEBIAD | Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline |
|
1009
|
Friday, May 17, 2024, 17:24 |
Brady Borrmann | UC# | LP-FEBIAD | ITE | | 44692-4 | 45235-18 | In progress | Conditioning Spare Development Target | Friday, May 17, 2024, Spare FEBIAD Development
target installed
Friday, May 17, 2024, 17:00: Roughing |
|
1008
|
Thursday, May 02, 2024, 13:45 |
Dave Neilson | - | LP-SIS | | | 44691-8 | 45235-26 | In progress | Mass marker testing | Wednesday, May 01, 2024, 12:44:
pumped down to rough vacuum, TP1B now on.
Wednesday, May 01, 2024, 12:49: |
|
1007
|
Friday, April 26, 2024, 13:49 |
Aaron Schmidt | TiC#7 | HP-FEBIAD | ITW | TM4 | 45447-5 | 45235-15 | In progress | Conditioning TiC#7 | FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B |
|
1006
|
Wednesday, April 24, 2024, 16:21 |
Dave Neilson | | LP-SIS | | | 44691-8 | 45235-26 | | | Wednesday, April 24, 2024, 16:20:
Target assembly installed.
Wednesday, April 24, 2024, 16:20: |
|
1005
|
Friday, April 19, 2024, 11:33 |
Dave Neilson | - | LP-FEBIAD | | | 44692-4 | 42972-10 | In progress | Development target test - Calibrated leak - Anode mode | Friday, April 19, 2024, 11:32:
assembly installed in test stand.
VV1 closed, pumping down |
|
|