  317   Thursday, February 02, 2023, 15:14 Albert KongMaintenanceTarget 1CoolingT1 Cooling Package: Leaked Valve InspectionA 0.75" SwageLok ball valve that was
taken out from the T1 cooling package was
inspected (SS-45S12).
 CompiledPictures.pdf 
  321   Thursday, March 02, 2023, 06:59 maicodallavalleMaintenanceTarget 1CoolingRefilled Expasion TankI have refilled the water package on T1
with DI water. The Expansion Tank is at 37cm.
This may change when pump is turned on.
  
  327   Thursday, April 06, 2023, 13:35 Albert KongMaintenanceTarget 1ControlsT1 Motor Controller Hearbeat Trip (+T2 Heartbeat Trip)The T1 motor controller hearbeat tripped
(noticed this morning). 
This does not seem prevent beam delivery
 MotorControllerHB.pngScreenshot_2023-04-11_145420.png0367549f-9672-4009-be34-df7abacf4a32.jpgScreenshot_2023-05-16_091027.png 
  329   Thursday, May 11, 2023, 11:28 Adam NewsomeRepairTarget 1TargetT1-MK1 - broken target ladder motor coupler repairedSee Cyclotron Fault 15787. The target ladder
motor failed to move to the commanded position
during a test. The T1 area was uncovered
  
  330   Tuesday, June 06, 2023, 15:42 Albert KongStandard OperationTarget 1CoolingT1 Heat Exchanger Low Flow DiagnosticsOn May 31, the low active water in BL1A
was turned off briefly and upon re-starting,
the flow to the T1 heat exchanger was very
 Picture1.pngPicture2.png 
  331   Tuesday, July 18, 2023, 09:14 Adam NewsomeOtherTarget 1CoolingT1 Cooling Package: target flow (FGTGT) sensor noise issuesBetween 1:00 pm and 6:00 pm on July 17,
2023, the T1 target cooling water flow rate
sensor exhibited some noise which resulted
 1.PNG2.PNG 
  337   Wednesday, January 10, 2024, 12:47 Albert KongStandard OperationTarget 1TargetT1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station)T1-MK1 was moved from the target station
to the hot cell roof. 
Radiation surveys report 140 mSv/hr
 T1_and_T2_Beryllium_Target_Beamtime_Spreadsheet_-_(10Jan2024).xlsxMeson_Hall_Storage_Pit_Target_Device_Location_Record_-_(10Jan2024).pptmVacuumAt2.56PM.PNG 
  342   Thursday, February 01, 2024, 11:14 Albert KongStandard OperationTarget 1Hot CellT1-MK1 Flush and Purge on Hot CellThe recently removed T1-MK1 target ladder
was flushed with city water for ~30s at all
target positions. It was then purged with
 IMG_3950.JPEGIMG_3975.JPEGIMG_3973.JPEGIMG_3971.JPEGT1&T2_Pump-Down_and_Leak_Check_Record_05_FEB_2024.pdf 
  348   Thursday, May 23, 2024, 17:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Target Exchange (+ leak fix, service panel changes, coupler exchange)On May 23, 2024 two sets of plugs from
position 1 and 3 and a 12mm Be target from
position 5 (serial #109) was removed from
 36x 
  356   Wednesday, October 30, 2024, 15:10 Albert KongStandard OperationTarget 1TargetT1-MK1 Electrical Check on Hot CellT1-MK1 electrical checks were completed
on the hot cell. Specifically the profile
and protect monitors were checked (assistance
 7x 
  159   Friday, May 08, 2015, 09:48 Isaac EarleStandard OperationOtherOtherBL1A Blocks RestoredReplacement of the BL1A blocks was completed
yesterday (May 8, 2015) in preparation for
first beam down 1A on May 12th.  The
 1A_Shield_Blocks_Restored_for_1A_beam_2015_&_2014.pdf 
  162   Thursday, June 11, 2015, 16:59 Isaac EarleDevelopmentOtherControlsLab Test of New T1/T2 Level SensorsThe new T1/T2 level sensors (Omega LVCN414)
were tested in the RH HC lab today using
the Omega software on a laptop and positioning
  
  163   Friday, June 19, 2015, 17:11 Isaac EarleDevelopmentOtherControlsPLC Test of Ultrasonic Level SensorThe new T1/T2 level sensors
(Omega LVCN414) were hooked up to the PLC
 Overnight_Level_Sensor_PLC_Test.jpg 
  164   Tuesday, June 23, 2015, 10:24 Isaac EarleStandard OperationOtherOtherBL1A Holding Tank Water Released The water in the BL1A holding tank
was released to the city sewer.  This
water was sampled, tested, and approved for
  
  166   Thursday, July 09, 2015, 13:51 Isaac EarleDevelopmentOtherTargetNew T1 and T2 Beryllium Targets OrderedAn order for new T1 and T2  beryllium
targets was submitted to the TRIUMF machine
shop today.  A total of seven T2 targets
  
  169   Thursday, August 13, 2015, 09:47 Isaac EarleDevelopmentOtherOther"Clamp A" disassembled and used to build clamp "TRH1257-#01"The 4" Marman flange clamp (IRH0001)
labeled "Clamp A",  as used
in the testing detailed in Document-114623
  
  170   Wednesday, August 19, 2015, 12:10 Isaac EarleRepairOtherOtherWarm Cell Water Window Seal Replacement StatusThe following tasks were completed over
the past 2 weeks:
- Aquarium Technology Ltd. (UK) was
 6x 
  171   Thursday, August 27, 2015, 15:47 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Seal Replacement UpdateSince the previous E-Log the following
tasks have been completed:
- Panel spacer rods installed at
  
  172   Monday, September 28, 2015, 10:29 Isaac EarleStandard OperationOtherActive SumpRH Hot Cell Lab Active Sump High Level Sensor Tested The RH hot cell lab active sump high
level sensor was tested as part of the yearly
scheduled inspection.  High water level
  
  173   Monday, September 28, 2015, 11:33 Isaac EarleRepairOtherWater LeakWarm Cell Water Window Repair CompleteThe warm cell water window tanks were filled
on September 17 after 2 weeks of curing time.
 A water leak was found coming from
  