ID Date Author Category Type Specific Subject Text Attachments
  158   Friday, May 01, 2015, 16:01 Isaac EarleRepairTarget 1OtherRH Warm Cell Used by Beamlines Group for TNF Heat Exchanger Leak CheckThe Meson Hall RH Lab Warm Cell was used
by Beamlines Group for hydrostatic testing
of the TNF heat exchanger.  The location
 IMG_1510.JPGIMG_1511.JPGIMG_1512.JPG 
  157   Tuesday, April 28, 2015, 15:55 Isaac EarleDevelopmentTarget 1TargetTarget Version Jumper Wires Installed for T1-MK1 and T2-MK1 The T1-MK1 and T2-MK1 targets have
been re-wired to allow version identification.
 Work was performed in the target storage
  
  156   Friday, April 24, 2015, 11:53 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target Info Sheet & ElevationsT2-MK2 target information sheet, beam spot
measurements, and elevations were updated
and delivered to Operations. PDF copy attached.
 T2-MK2_-_2015_Elevations.pdf 
  155   Thursday, April 23, 2015, 16:29 Isaac EarleStandard OperationTarget 1TargetT1 & T2 Profile and Protect Monitors Electrical Check CompletedAn electrical check has been completed
for the T1 & T2 Profile and Protect Monitors
by Dave Cameron and Mike Russell.  They
  
  154   Thursday, April 23, 2015, 13:40 Isaac EarleDevelopmentTarget 2OtherT2 Protect Monitor Elevation Adjustment- T2 Protect Monitor moved from the beam
line to the hot cell on Monday April 20th
- Elevation of the plate center measured
 Old_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Entry_Side.jpgOld_T2_Protect_Monitor_(removed_Apr_22_2015)_-_Exit_Side.jpg 
  153   Wednesday, April 22, 2015, 15:17 Isaac EarleDevelopmentTarget 1TargetT1-MK2 wired for version identification The T1-MK2 target was wired for automatic
target version detection by the new PLC control
system (A to C jumper  in POT/CAM MS
  
  152   Wednesday, April 22, 2015, 15:15 Isaac EarleStandard OperationTarget 1CoolingT1 and T2 Cooling Packages ReadyBoth cooling packages are running steadily
with the targets in Position 0.  
The demin flow (Q2) for both was
  
  151   Wednesday, April 22, 2015, 09:46 Isaac EarleDevelopmentTarget 1TargetWater Sensors Installed on T1 Monolith Four water sensors have been installed
on top of the T1 monolith.  These water
sensors were wired and brought to the area
 T1_Water_Sensors.jpgIMG_4859.JPGIMG_4860.JPG 
  150   Tuesday, April 21, 2015, 13:38 Isaac EarleStandard OperationTarget 1TargetAir Amplifier Started. T1 & T2 Profile Monitor Actuation Checked The lower air amplifier has been
started, and air supplied to the T1 and T2
areas by opening the appropriate ball valves
  
  149   Tuesday, April 21, 2015, 12:59 Isaac EarleStandard OperationTarget 1TargetT1-MK2 target moved from storage pit to beam line The T1-MK2 target was transported
from the storage pit to the beamline.  The
target measured approximately 10mSv/hr at
  
  148   Monday, April 20, 2015, 11:42 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Target & T2 Protect Moved The T2-MK2 target was moved from
the hot cell to the beam line. The T2 Protect
Monitor was moved from the beam line to the
  
  147   Thursday, April 09, 2015, 13:56 Isaac EarleDevelopmentTarget 2TargetT2-MK2 target wired for version identification, cable ties replaced, ready for useThe "POT/CAM" MS connector on
the T2-MK2 has been wired to allow automatic
target version number identification by the
  
  146   Tuesday, March 31, 2015, 17:40 Isaac EarleRepairTarget 2CoolingT2 Thermistors ReplacedThe Inlet (T1), Outlet (T2), Col.A (T6),
and Col. B (T7) thermistors at the T2 cooling
package all gave intermittent faulty readings
  
  145   Thursday, March 12, 2015, 10:51 Isaac EarleStandard OperationTarget 2TargetT2-MK2 Pos'n 4 Elevation MeasurementsElevation measurements of the T2-MK2 target
were taken in the hot cell to confirm previous
records in preparation for the T2 Protect
  
  144   Wednesday, March 04, 2015, 18:08 Isaac EarleRepairTarget 2CoolingT2 Cooling Package MRO UpdateThe following work was done today at the
T2 cooling package:
- Remainder of #4 Hansen o-rings
  
  143   Friday, February 27, 2015, 18:06 Isaac EarleDevelopmentTarget 1TargetT1 Rotary Collimator Water and Air Line Investigation Ron Kuramoto, Keith Ng, John McKinnon,
and myself spent some time today investigating
water and air lines related to the T1 Rotary
  
  142   Friday, February 20, 2015, 13:55 Isaac EarleStandard OperationTarget 2TargetT1 & T2 Target Moves- The T1-MK1 target was moved from the
hot cell to storage pit hole #3 (ready as
T1 spare)
  
  141   Wednesday, February 18, 2015, 14:49 Isaac EarleRepairTarget 1TargetT1-MK1 Repair CompleteThis is a continuation of work detailed
in E-Log #129 and #140.
- Static water test performed on
 IMG_4638.JPGIMG_4646.JPGIMG_4647.JPG 
  140   Friday, February 06, 2015, 12:39 Isaac EarleRepairTarget 1TargetT1-MK1 Repair Status (Pos'n 1 Plug Leak) The T1-MK1 target is currently in
the hot cell for repair of a leak at position
1.  See E-Log #129 for details on previous
 IMG_4603.JPG 
  139   Monday, February 02, 2015, 16:06 Isaac EarleMaintenanceTarget 2CoolingT2 MRO Status- T2-MK2 target (currently in the T2 monolith)
purged with air
  