343
|
Thursday, February 01, 2024, 11:16 |
Albert Kong | Standard Operation | Other | Cooling | Spent resin can rinse, purge, and drying | The recently removed resin can from
the T2 target station was rinsed with city
water and flushed with compressed air for |
|
342
|
Thursday, February 01, 2024, 11:14 |
Albert Kong | Standard Operation | Target 1 | Hot Cell | T1-MK1 Flush and Purge on Hot Cell | The recently removed T1-MK1 target ladder
was flushed with city water for ~30s at all
target positions. It was then purged with |
    |
341
|
Friday, January 19, 2024, 17:07 |
Albert Kong | Standard Operation | Other | Target | T1/T2 Profile Monitor, TGT Ladder, CUNO filter leak, Motor Coupling Inspection, + M9/M20 Blocker Actuation | The following tasks were completed:
Yesterday (Jan 18), the
T1/T2 cooling packages were inspected for |
7x |
340
|
Monday, January 15, 2024, 16:47 |
Albert Kong | Standard Operation | Other | Cooling | T1/T2 Cooling Pkg. Prep for Refill + Leak Check At Pressure | The following tasks were completed
in preparation of re-filling the T1 and T2
cooling packages: |
7x |
339
|
Monday, January 15, 2024, 16:36 |
Albert Kong | Standard Operation | Target 2 | Cooling | T2 Resin Flask Exchange | The resin flask on the T2 cooling package
was exchanged today (new resin can prepped
in the morning). |
  |
338
|
Thursday, January 11, 2024, 15:10 |
Albert Kong | Maintenance | Other | Cooling | T1/T2 Cooling Pkg. Proteus Paddle Wheel Maintenance, CUNO Filter Replacement, and Fitting Inspection | The following tasks were performed:
All electrical, water,
and pneumatic connections to the T1 target |
|
337
|
Wednesday, January 10, 2024, 12:47 |
Albert Kong | Standard Operation | Target 1 | Target | T1 target ladder exchange (T1-MK1 to hot cell roof, T1-MK2 from pit to station) | T1-MK1 was moved from the target station
to the hot cell roof.
Radiation surveys report 140 mSv/hr |
  |
336
|
Wednesday, January 10, 2024, 12:25 |
Albert Kong | Standard Operation | Other | Cooling | T1/T2 cooling packages drained | Jan 10, 2024:
The cooling packages for T1/T2 was
drained this morning. ~150 L from each of |
  |
335
|
Monday, December 04, 2023, 09:22 |
Albert Kong | Standard Operation | Target 2 | Cooling | T2 TGT Low Flow | See Cyclotron fault 16553.
"B1A:T2CS:FGTGT readback is
toggling at the warn limit of 3.0 GPM and |
    |
334
|
Tuesday, October 17, 2023, 14:25 |
Albert Kong | Maintenance | Other | Other | T1/T2 Air Amplifier Spool O-Ring Servicing | Today we re-lubricated the o-rings on the
top air amplifier for T1/T2, and replaced
the o-rings on the bottom air amplifier with |
 |
333
|
Tuesday, October 17, 2023, 10:16 |
Eric Lahe | Maintenance | Other | Active Sump | Testing the Remote Handling Lab Active Sump Level Sensor | The level sensor for the active sump in
the RH lab was tested.
The level sensor is working properly |
|
332
|
Thursday, August 03, 2023, 10:33 |
Albert Kong | Repair | Target 2 | Cooling | T2 Expansion Tank Water Level Low (Leak Identified) | The water level in the T2 cooling system
expansion tank dropped to below the trip
treshold of 20 cm (ref Cyclotron fault #16123), |
7x |
331
|
Tuesday, July 18, 2023, 09:14 |
Adam Newsome | Other | Target 1 | Cooling | T1 Cooling Package: target flow (FGTGT) sensor noise issues | Between 1:00 pm and 6:00 pm on July 17,
2023, the T1 target cooling water flow rate
sensor exhibited some noise which resulted |
 |
330
|
Tuesday, June 06, 2023, 15:42 |
Albert Kong | Standard Operation | Target 1 | Cooling | T1 Heat Exchanger Low Flow Diagnostics | On May 31, the low active water in BL1A
was turned off briefly and upon re-starting,
the flow to the T1 heat exchanger was very |
 |
329
|
Thursday, May 11, 2023, 11:28 |
Adam Newsome | Repair | Target 1 | Target | T1-MK1 - broken target ladder motor coupler repaired | See Cyclotron Fault 15787. The target ladder
motor failed to move to the commanded position
during a test. The T1 area was uncovered |
|
328
|
Wednesday, May 03, 2023, 10:06 |
Adam Newsome | Maintenance | Other | Hot Cell | Meson Hall Hot Cell - Nuclear Ventilation HEPA Filter Changed, Operational | The HEPA filter in the nuclear ventilation
system for the Meson Hall Hot Cell was changed
and tested by mechanical services under work |
|
327
|
Thursday, April 06, 2023, 13:35 |
Albert Kong | Maintenance | Target 1 | Controls | T1 Motor Controller Hearbeat Trip (+T2 Heartbeat Trip) | The T1 motor controller hearbeat tripped
(noticed this morning).
This does not seem prevent beam delivery |
   |
326
|
Thursday, March 30, 2023, 13:17 |
Albert Kong | Maintenance | Other | Target | Air Amplifier Testing: M9 BB (AKA T2 blocker), M20 BB, T2 MK1 prof. monitor, T1 MK1 prof. monitor actuation | We tested the air amplifiers by actuating
the beam blockers and profile monitors on
the T1 and T2 target stations. |
  |
325
|
Wednesday, March 15, 2023, 15:56 |
Albert Kong | Maintenance | Target 2 | Controls | T2 - M9 and M20 beam blocker actuation and vacuum test | We tested the actuation of the M9/M20
beam blockers on the T2 monolith (3-4pm).
Vacuum levels remained steady throughout |
6x |
324
|
Monday, March 06, 2023, 16:58 |
Albert Kong | Repair | Target 2 | Cooling | M20 O-Ring Replacement and Valve Replacement Leak Check | We replaced tha O-ring on M20 at
T2 and brought the target station down to
vacuum, which allowed the target water pump |
 |