  RH-ISAC, Page 87 of 138  Not logged in ELOG logo
Entry  Friday, April 20, 2012, 14:07, Travis Cave, Conditioning Station, Standard Operation, TM1, Nb#6, module move 
Entry  Tuesday, April 24, 2012, 10:02, Travis Cave, ITW, Standard Operation, TM1, Nb#6, module move 
Entry  Tuesday, April 24, 2012, 10:36, Bevan Moss, Conditioning Station, Standard Operation, TM1, Nb#6, HV test April 23 
Entry  Tuesday, April 24, 2012, 10:38, David Wang, Conditioning Station, Standard Operation, TM1, LP SIS Nb6, TM1 heat shield circuit leak check with Nb5 
Entry  Wednesday, May 02, 2012, 11:27, David Wang, ITW, Standard Operation, TM1, , ITW is ready for taking proton beam. 
Entry  Tuesday, June 05, 2012, 12:20, Bevan Moss, South Hot-Cell, Standard Operation, TM1, Ta#38, Target inserted into HC 
Entry  Tuesday, June 05, 2012, 15:06, Bevan Moss, ITW, Standard Operation, TM1, Nb#6, Module move from ITW to SHC 
Entry  Wednesday, June 06, 2012, 08:21, David Wang, ITW, Standard Operation, TM1, , TM1 disconnected in ITW 
Entry  Wednesday, June 06, 2012, 13:36, chad fisher, South Hot-Cell, Standard Operation, TM1, Ta#38, Target Change Nb#6 - Ta#38 
Entry  Wednesday, June 06, 2012, 14:33, David Wang, South Hot-Cell, Standard Operation, TM1, Ta38, leak check heat shield circuit 
Entry  Thursday, June 07, 2012, 11:58, Bevan Moss, Conditioning Station, Standard Operation, TM1, Ta38, Module Move from SHC to TCS 
Entry  Friday, June 08, 2012, 11:07, David Wang, Conditioning Station, Standard Operation, TM1, Ta38, conditioning staion and TM1 is under TP1 and TP2 pumping now. 
Entry  Friday, June 08, 2012, 15:00, Don Jackson, South Hot-Cell, Standard Operation, TM1, Nb#6, Electrical Check Nb#6 at end of run Nb#6_End_of_Run.JPG
Entry  Friday, June 08, 2012, 15:03, Don Jackson, South Hot-Cell, Standard Operation, TM1, Ta38, Electrical Check on new Ta38 at hot cell Ta38_New_Target.JPG
Entry  Monday, June 11, 2012, 14:14, Travis Cave, Conditioning Station, Standard Operation, TM1, Ta#38, Electrical check TM#1_Ta38_at_constat_elec_check.PDF
Entry  Monday, June 11, 2012, 14:41, David Wang, Conditioning Station, Standard Operation, TM1, Ta38, Heat shield helium pressure test 
Entry  Tuesday, June 19, 2012, 10:35, Travis Cave, ITW, Standard Operation, TM1, Ta#38, module move 
Entry  Tuesday, June 19, 2012, 16:18, David Wang, ITW, Standard Operation, TM1, Ta38, TM1connected in ITW 
Entry  Tuesday, July 31, 2012, 09:52, David Wang, ITW, Standard Operation, TM1, Ta38, TM1 disconnected in ITW 
Entry  Tuesday, July 31, 2012, 10:50, Travis Cave, South Hot-Cell, Standard Operation, TM1, Ta#38, module move 