  2626   Wednesday, June 26, 2024, 13:49 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from SW silo to TCS.Tm2 has been successfully moved from SW
silo to TCS. 
  
  2629   Wednesday, July 03, 2024, 14:01 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from TCS to SW silo.Tm2 has been moved from TCS to SW silo.
the move is smooth.
  
  2655   Monday, August 12, 2024, 15:55 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67 LP-SISTarget Loading Ta#67 Target loaded onto TM2
Leak check passed
Electrical test passed after loosening
  
  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check TM2 with new target Ta#67 had been
electric/leak checked before moving to ITE.
See attachment pls.
 TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf 
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection TM2 with new target Ta#67 was connected
in ITE, all TP are running at their full
speed now.
 TM2_with_Ta#67_connection_in_ITE_20240813.pdf 
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer 5 shielding blocks have been transferred
from ITW to ITE, MAA has been secured after
moving.
  
  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection TM2 with spent target Ta#67 was disconnected
in ITE. see attachment pls.
 TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf 
  2696   Tuesday, October 01, 2024, 10:55 David WangSouth Hot-CellStandard OperationTM2 TM2 has been moved from ITE to SHC.TM2 has been moved from ITE to SHC. Peter
did the move with Travis on help.  The
move is smooth. 
  
  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2  October 1, 2024 - Aaron Tam 
Ta#67 LP-SIS removed from TM2
Ta#67 is sitting in SHC awaiting
 9x 
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting October 7, 2024 - Aaron Tam 
Ta#68 HP-SIS checks performed at
B1 lab, moved to anteroom, and inserted into
 17x 
  2699   Tuesday, October 08, 2024, 11:45 David WangSouth Hot-CellStandard OperationTM2 Tm2 electrical check with Ta#68 installed at SHC. ABCD was dead shorted to 60kv bias during
the first time measurement after target installation.
Target was removed and reinstalled again
 TM2_Ta#68_electrical_check.pdf 
  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.Tm2 has been moved form SHC to ITE. The
move is smooth. 
  
  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection TM2 with new target Ta#68 installed
is connected in ITE. Pls see form attached.
 TM2_with_new_target_Ta#68_connection_in_ITE.pdf 
  2702   Thursday, October 10, 2024, 10:24 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Ta#67 PIE  Post Irradiation Examination
October 9, 2024 - Aaron Tam w/
Chad Fisher, Aurelia Laxdal, and Lucas Backes 
 35x 
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnectionTM2 with spent target TA#68 was disconnected 
in ITE and is being moved to SHC. All water
lines are purged for module storage.
 TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf 
  2726   Tuesday, December 03, 2024, 10:51 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - ITE to SHCTM2 was moved from ITE to SHC with Ta#68
target. During the move, a railing was lightly
bumped by the corner of the module - no obvious
  
  2727   Tuesday, December 03, 2024, 12:28 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM3 move - TCS to ITETM3 was moved with UCx#47 from TCS to ITE.
The move was smooth. 
  
  2728   Tuesday, December 03, 2024, 15:53 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 Removal  Note: Ta#68 had a difficult
install. See E-log ID# 2698 for more info 
First look:
 22x 
  2730   Wednesday, December 04, 2024, 09:00 David WangFacilitiesStandard OperationTM2 all water lines on TM2 have been purged.all water lines on TM2 have been purged.
Refilled them(except HS ) with 60psi nitrogen
for module silo storage before next year
  
  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to siloTM2 was remotely moved from the South Hot
Cell to SW Silo. Reading at SHC = 89.8 mSv/h.
The move was smooth. 
  