  2626   Wednesday, June 26, 2024, 13:49 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from SW silo to TCS.

Tm2 has been successfully moved from SW silo to TCS.

  2629   Wednesday, July 03, 2024, 14:01 David WangConditioning StationStandard OperationTM2 Tm2 has been moved from TCS to SW silo.

Tm2 has been moved from TCS to SW silo. the move is smooth.

  2655   Monday, August 12, 2024, 15:55 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67 LP-SISTarget Loading

 Ta#67 Target loaded onto TM2

Leak check passed

Electrical test passed after loosening off target electrode conductor screws, and torqueing by feel 

 

  2656   Tuesday, August 13, 2024, 08:39 Frank SongSouth Hot-CellStandard OperationTM2Ta#67electrical check/leak check

 TM2 with new target Ta#67 had been electric/leak checked before moving to ITE. See attachment pls.

Attachment 1: TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
TM2_with_Ta@67_electric_and_leak_check_on_SHC.pdf
  2657   Tuesday, August 13, 2024, 14:18 Frank SongITEStandard OperationTM2Ta#67Module Connection

 TM2 with new target Ta#67 was connected in ITE, all TP are running at their full speed now.

Attachment 1: TM2_with_Ta#67_connection_in_ITE_20240813.pdf
TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf TM2_with_Ta#67_connection_in_ITE_20240813.pdf
  2666   Monday, August 19, 2024, 15:29 Frank SongITW/ITEStandard OperationTM2Ta#67shielding blocks transfer

 5 shielding blocks have been transferred from ITW to ITE, MAA has been secured after moving.

  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection

 TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls.

Attachment 1: TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
  2696   Tuesday, October 01, 2024, 10:55 David WangSouth Hot-CellStandard OperationTM2 TM2 has been moved from ITE to SHC.

TM2 has been moved from ITE to SHC. Peter did the move with Travis on help.  The move is smooth.

  2697   Tuesday, October 01, 2024, 12:40 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Target Ta#67 Removed from TM2

 October 1, 2024 - Aaron Tam 

Ta#67 LP-SIS removed from TM2

Ta#67 is sitting in SHC awaiting PIE 

TM2 Containment Box Cover has not been reinstalled 

Photos of target removal and module attached 

Attachment 1: Containment_Box.jfif
Attachment 2: Containment_Box_Cover_Internal.jfif
Attachment 3: Target_Fasteners_on.jfif
Attachment 4: Target_Fasteners_off.jfif
Attachment 5: Service_Tray_no_Target.jfif
Attachment 6: Ta#67_Left.jfif
Attachment 7: Ta#67_Right.jfif
Attachment 8: Ta#67_Top.jfif
Attachment 9: Ta#67_Bottom.jfif
  2698   Tuesday, October 08, 2024, 11:20 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 install onto TM2, w/ Troubleshooting

October 7, 2024 - Aaron Tam 

Ta#68 HP-SIS checks performed at B1 lab, moved to anteroom, and inserted into SHC via tool port w/ Aaron Schmidt. 

Ta#68 fixed to source tray with 4 mounting bolts in order of: Right manip. holding, Top left, Right manip. removed, Bottom right, Top right, bottom left. w/ Aaron Schmidt and Brady Borrmann

  • Motion was smooth, no resistance when positioning onto pins

VCR fittings done up with ample force, leak check passed

Conductor bolts installed in order of: 2 Target electrode conductors (Checked washers), 3 target Inner and outer conductors.

All bolts checked for full contact with mirror and binos. 

Electrical check failed: Dead short (look for David's ELOG for more detail when available) 

Troubleshooting while David is checking resistance: w/ Ferran

  • Intermittent success with heavy manipulation of water lines
    • Loosening off Waterline bracket-to-source-tray 
    • Loosening off Bracket to water line bolts 5/32 hex's 
    • Rotating bracket towards operator (effectively raising waterlines in the back upwards) seems to yield more intermittent success, but never passing megger @ 250V 
    • Tube was inadvertently dented when handling the tube in a wrenching motion with manip tong. counterclockwise
  • Target removed while David is still on the multimeter (calling for any sign of success)
    • Starting to remove Target in order of: Tightening back waterline-to-bracket 5/32 hex screws, loosening off waterline bracket, loosening off VCR nuts, 2 Target electrode conductor bolts, 3 Target inner and outer conductor bolts, Fixing bolts Top left (dropped below source tray), Bottom right...
      • (At this time David called with some success with electrical check)
    • Reversing course to verify fault has passed, target was reassembled, only finger loose on the VCR nuts.
    • Faults no longer present
    • Target removed
      •  As target was being pulled off source tray locating pins, a piece of ceramic fell onto the source tray just behind window waterlines.

Target taken out of Hotcell by Ferran. New VCR gaskets installed. Target reinserted 

Target installed no issues. Used fixing bolt used to replace dropped one. 

Leak check passed, Electrical check passed

  • Notably don't have a photo of reinstalled target or source tray before 2nd install attempt. 

Containment cover reinstalled 

Ceramic piece moved into Pail #285 (suspect this is a very hot piece)

TM2 ready for move to ITE

Attachment 1: 1st_Install_Leak_check_passed.jfif
Attachment 2: 1st_Install_Complete_waiting_for_electrical_check.jfif
Attachment 3: Troubleshooting_1st_install_(dent_in_tube_visible).jfif
Attachment 4: Water_Line_Dent_Face.jfif
Attachment 5: Water_Line_Dent_profile.jfif
Attachment 6: Waterline_alignment_after_removing_VCR_connection.jfif
Attachment 7: Ceramic_piece_fell_untouched_position.jfif
Attachment 8: Ceramic_Piece.jfif
Attachment 9: 285_Pail_location.jfif
Attachment 10: Closer_look_Below_Target_between_electrodes.jfif
Attachment 11: Closer_Look_Taget_Electrode_Conductor_LEFT_(2).jfif
Attachment 12: Closer_Look_Taget_Electrode_Conductor_LEFT.jfif
Attachment 13: Closer_Look_Taget_Electrode_Conductor_RIGHT_(2).jfif
Attachment 14: Closer_Look_Taget_Electrode_Conductor_RIGHT.jfif
Attachment 15: Closer_Look_Target_Inner_and_Outer_conductors.jfif
Attachment 16: Closer_Look_waterline_bracket_after_manipulation.jfif
Attachment 17: TM2_Cover_Closed_completed_ready_for_move.jfif
  2699   Tuesday, October 08, 2024, 11:45 David WangSouth Hot-CellStandard OperationTM2 Tm2 electrical check with Ta#68 installed at SHC.

ABCD was dead shorted to 60kv bias during the first time measurement after target installation. Target was removed and reinstalled again with new VCR seals by Ferran.  during target removal process, short disappeared when Aaron remove bolts on CD tube heaters terminal.  leak check and electrical check result are good after second time target installation. 

Attachment 1: TM2_Ta#68_electrical_check.pdf
TM2_Ta#68_electrical_check.pdf TM2_Ta#68_electrical_check.pdf
  2700   Tuesday, October 08, 2024, 11:46 David WangITEStandard OperationTM2Ta#68.Tm2 has been moved form SHC to ITE.

Tm2 has been moved form SHC to ITE. The move is smooth.

  2701   Wednesday, October 09, 2024, 14:04 Frank SongITEStandard OperationTM2Ta#68Module Connection

 TM2 with new target Ta#68 installed is connected in ITE. Pls see form attached.

Attachment 1: TM2_with_new_target_Ta#68_connection_in_ITE.pdf
TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf TM2_with_new_target_Ta#68_connection_in_ITE.pdf
  2702   Thursday, October 10, 2024, 10:24 Aaron TamSouth Hot-CellStandard OperationTM2Ta#67Ta#67 PIE

 Post Irradiation Examination

October 9, 2024 - Aaron Tam w/ Chad Fisher, Aurelia Laxdal, and Lucas Backes 

PIE conducted by Chad with direction from Aurelia. Aaron and Lucas observing/documenting 

Goal: Thin foil target material is somewhat novel, and we should characterize the differences if there are any. 

Photos of the pre-examined target can be seen on ELOG 2697  on Tuesday October 1, 2024, when the target was removed from TM2

Notes:

  • Right most inner/outer target conductor bolts was sitting proud and had threads showing, photo attached
  • Some Black deposit was found on the inside of the heatshield directly below the extraction tube, and loose in powder form inside the heatshield. 
  • Target tube seems to have more of a crystalline texture than previous examinations.
  • When Target tube was being removed, one of the target electrode conductors broke off
  • some dimple texture was found on the target tube windows and this was further explored by prying a channel through the length of one side of the tube to get a better look

Target pieces were placed loosely back within the heatshield, and the lid loosely placed back on.

Awaiting pail loading, and move to storage vault

 

Attachment 1: Black_deposit_loose_inside_heatshield_(2).jfif
Attachment 2: Black_deposit_loose_inside_heatshield.jfif
Attachment 3: Black_Deposit_on_heatshield_(2).jfif
Attachment 4: Black_Deposit_on_heatshield.jfif
Attachment 5: Closer_Look_at_Broken_off_Conductor_piece.jfif
Attachment 6: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(2).jfif
Attachment 7: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE_(4).jfif
Attachment 8: Closer_look_Dimple_texture_on_target_tube_window_ENTRANCE.jfif
Attachment 9: Closer_look_Dimple_texture_on_target_tube_window_EXIT_(2).jfif
Attachment 10: Closer_look_Dimple_texture_on_target_tube_window_EXIT.jfif
Attachment 11: Conductor_Screw_sitting_proud_(1).jfif
Attachment 12: Conductor_Screw_sitting_proud.jfif
Attachment 13: Copper_Colour_Pattern_(2).jfif
Attachment 14: Copper_Colour_pattern.jfif
Attachment 15: Crystalline_Texture_on_target_tube_(1).jfif
Attachment 16: Crystalline_Texture_on_target_tube.jfif
Attachment 17: Entrance_Window_inside_heatshield.jfif
Attachment 18: Entrance_Window_outside_Heatshield.jfif
Attachment 19: Exit_Window_inside_Heatshield.jfif
Attachment 20: Exit_window_outside_heatshield.jfif
Attachment 21: f8ccf123-0d03-47b8-86c9-27ae5b29c70d.jfif
Attachment 22: f5747a26-1431-4506-8127-e30b1e829339.jfif
Attachment 23: fbcb86a1-2d48-46a9-a64f-f5bcb01959fa.jfif
Attachment 24: Open_Target_tube_dimple_feature.jfif
Attachment 25: Operation_Target_Tube_removal_(2).jfif
Attachment 26: Operation_Target_Tube_removal.jfif
Attachment 27: Procedure_Ripping_into_target_tube_(2).jfif
Attachment 28: Procedure_Ripping_into_target_tube_(4).jfif
Attachment 29: Procedure_Ripping_into_target_tube_(5).jfif
Attachment 30: Procedure_Ripping_into_target_tube_(6).jfif
Attachment 31: Procedure_Ripping_into_target_tube.jfif
Attachment 32: Target_Electrode_Conductor_removed.jfif
Attachment 33: Target_Tube_Window_ENTRANCE.jfif
Attachment 34: Target_window_ENTRANCE.jfif
Attachment 35: Target_window_EXIT.jfif
  2725   Tuesday, December 03, 2024, 10:10 Frank SongITEStandard OperationTM2Ta#68module disconnection

TM2 with spent target TA#68 was disconnected  in ITE and is being moved to SHC. All water lines are purged for module storage.

Attachment 1: TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf TM2_with_spent_target_TA#68_disconnection_in_ITE_2024-12-03.pdf
  2726   Tuesday, December 03, 2024, 10:51 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - ITE to SHC

TM2 was moved from ITE to SHC with Ta#68 target. During the move, a railing was lightly bumped by the corner of the module - no obvious damage or issues have been observed. Otherwise, the move was smooth.

  2727   Tuesday, December 03, 2024, 12:28 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM3 move - TCS to ITE

TM3 was moved with UCx#47 from TCS to ITE. The move was smooth.

  2728   Tuesday, December 03, 2024, 15:53 Aaron TamSouth Hot-CellStandard OperationTM2Ta#68Ta#68 Removal

  Note: Ta#68 had a difficult install. See E-log ID# 2698 for more info 

First look:

  • Containment box cover looks the same as previous (See:ID: 2697)
  • Target shows large amount of soot-like deposits (See photos for locations)
  • Deposits seem to have been left on parts of the service tray as well ie.: Multipin connector 

Removal:

  • Removal was smooth
  • Water-line bracket fixing bolts seemed loose even before I put a tool to them 

Eyes of sides:

  • Better photos of where deposits are 
  • Everything else seems normal 
Attachment 1: Containment_Cover_Internal.jpg
Containment_Cover_Internal.jpg
Attachment 2: First_Look.jpg
First_Look.jpg
Attachment 3: First_look_Water_Lines_and_bracket.jpg
First_look_Water_Lines_and_bracket.jpg
Attachment 4: First_look_Water_Lines_and_bracket.jpg
First_look_Water_Lines_and_bracket.jpg
Attachment 5: First_Look_water_line_bracket_closer.jpg
First_Look_water_line_bracket_closer.jpg
Attachment 6: First_Look_Triplet_Conductos.jpg
First_Look_Triplet_Conductos.jpg
Attachment 7: Triplet_conductors_2.jpg
Triplet_conductors_2.jpg
Attachment 8: Multi_Pin.jpg
Multi_Pin.jpg
Attachment 9: Top.jpg
Top.jpg
Attachment 10: Top_Closer.jpg
Top_Closer.jpg
Attachment 11: Top_Closer_(2).jpg
Top_Closer_(2).jpg
Attachment 12: Right.jpg
Right.jpg
Attachment 13: Left.jpg
Left.jpg
Attachment 14: Bottom.jpg
Bottom.jpg
Attachment 15: Bottom_Closer.jpg
Bottom_Closer.jpg
Attachment 16: Extraction_electrode.jpg
Extraction_electrode.jpg
Attachment 17: Extraction_electrode2.jpg
Extraction_electrode2.jpg
Attachment 18: Extraction_electrode3.jpg
Extraction_electrode3.jpg
Attachment 19: Extraction_electrode4.jpg
Extraction_electrode4.jpg
Attachment 20: Deposit.jpg
Deposit.jpg
Attachment 21: Deposit2.jpg
Deposit2.jpg
Attachment 22: Deposit_3.jpg
Deposit_3.jpg
  2730   Wednesday, December 04, 2024, 09:00 David WangFacilitiesStandard OperationTM2 all water lines on TM2 have been purged.

all water lines on TM2 have been purged. Refilled them(except HS ) with 60psi nitrogen for module silo storage before next year using. 

  2731   Wednesday, December 04, 2024, 10:40 Adam NewsomeSouth Hot-CellStandard OperationTM2 TM2 move - SHC to silo

TM2 was remotely moved from the South Hot Cell to SW Silo. Reading at SHC = 89.8 mSv/h. The move was smooth.