Entry  Tuesday, October 06, 2015, 13:25, David Wang, ITE, Standard Operation, TM4, , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mppTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdf
Weekly update target hall schedule. See attachment 1,2.
Entry  Tuesday, October 06, 2015, 13:00, David Wang, ITE, Repair, TM4, , spark on top of TM4 in ITE 
During the weekend condition The TM4 spark at 30KV without vacuum response. It is confirmed the spark is from the top TM4 this morning.The flexible cables
in a  black wire sleeve which is used for febiad X pin connection drooped too close to the TM4 surface plate, and caused the sparking. The problem
is fixed by Anders and David. The cables is put back where it should stay.  After test, no sparking on the top.
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
The ITE is configured to take proton beam.
Entry  Tuesday, October 06, 2015, 12:50, David Wang, ITE, Standard Operation, TM4, Ta#46, 5 Shielding blocks have been transferred from ITW to ITE. 
The ITE is configured to take proton beam.
Entry  Monday, October 05, 2015, 10:19, Anders Mjos, Conditioning Station, Maintenance, , , Chiller maintenance 
 will be performed Tuesday October 6th
Tuesday, October 06, 2015: Maintenance re-schedlued for Wednesday October 7th
Entry  Thursday, October 01, 2015, 09:18, Travis Cave, Spent Target Vault, Standard Operation, , , Targets transfered to mini storage. 
In preparation for shipping of the spent targets five have been moved to the mini storage. The following target were moved to the mini storage, SiC#26,
Ta#36, UC#9,10,11.
Entry  Wednesday, September 30, 2015, 11:14, Travis Cave, South Hot-Cell, Repair, TM3, no target, Electrical Check TM3_elecchk_notgt_shc.PDF
TM#3 electrical check at the south hot cell, no target, all value are done at 1000Volts. See the attached PDF for the results.
Entry  Wednesday, September 30, 2015, 08:50, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Module moved 
TM#3 is in the south hot cell it was moved from the north west silo.
Entry  Tuesday, September 29, 2015, 12:31, David Wang, ITE, Standard Operation, TM4, Ta#46, TM4 has been connected in ITE 
Dan and I connected TM4 in ITE. The turbo- pumps are started. Water supply to TM4 only at this stage. Everything is good so far.
Entry  Tuesday, September 29, 2015, 09:38, Travis Cave, ITE, Standard Operation, TM4, Ta#46, Module moved 
TM#4 with Ta#46 has been moved to ITE from the conditioning station.
Entry  Monday, September 28, 2015, 10:10, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, Switched off CS vacuum pumps and water system 
I switched off CS vacuum pumps and water system after Isac opps finished the TM4 conditioning at CS.
Entry  Friday, September 25, 2015, 08:21, Travis Cave, South Hot-Cell, Standard Operation, , UC#13, Spent Target move Vault_Storage_September_24_2015.pdf
The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr
upon removal from the hot cell. See attached PDF for details.
Entry  Friday, September 25, 2015, 07:56, David Wang, Conditioning Station, Standard Operation, , , Target Hall schedule from Sep 08th 2015 to Dec 25th 2015 Target_Hall_Scheduled_Activities__Sep_09_to_Dec_30.pdfTarget_Hall_Scheduled_Activities__Sep_09_to_Dec_30.mpp
weekly update see attachment
Entry  Thursday, September 24, 2015, 14:59, Friedhelm Ames, Conditioning Station, Standard Operation, TM4, Ta#46, start high voltage conditioning 
 
Entry  Thursday, September 24, 2015, 07:00, David Wang, Conditioning Station, Maintenance, TM4, Ta#46, Turned off TCS all vacuum pumps and water pumps. 
TCS:MP1 back up pressure went up too high (700mtorr).I turned off all the pumps.The TCS is under vacuum still. TCS water  package cooling fans showed
error on control page.The water pumps are stopped  also.
Restarted the vacuum pumps 40 minutes after stopping. Everything is back to normal. The MP1 back up pressure need to be monitored frequently before
Entry  Wednesday, September 23, 2015, 14:35, David Wang, Conditioning Station, Standard Operation, TM4, Ta#46, TM4 has been connected at CS 
TM4 has been connected at CS. Turbo- pumps and water system are started and running . The HV cover has been installed on the module. Everything is good
so far.
Entry  Wednesday, September 23, 2015, 14:32, David Wang, Conditioning Station, Standard Operation, TM4, Ta#45, Helium pressure test on TM4 HS line at CS 
Helium pressure test HS line at CS with 70 psi for 2 minutes. Base  leak rate 0.0xE-9atm.cc/sec. No response. The line is leak tight.
Entry  Wednesday, September 23, 2015, 13:56, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Electrical Check TM4Ta46elecchkCS.PDF
TM#4 electrical check at the conditioning station with Ta#46 target.
Entry  Wednesday, September 23, 2015, 08:38, Travis Cave, Conditioning Station, Standard Operation, TM4, Ta#46, Module moved 
TM#4 with Ta#46 has been moved from the south hot cell to the conditioning station.
Entry  Tuesday, September 22, 2015, 13:15, David Wang, South Hot-Cell, Standard Operation, , Ta#46, Leak check on TM4 HS water line with new Ta#46 target. at SHC 
Chad and I leak checked the HS line at SHC. No leak. Leak rate 0.0xE-9atm.cc/sec.