Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1160     Entry time: Wednesday, March 02, 2016, 09:51
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number:  
Subject: all water lines on TM2 and TM4 are purged. 

All water lines on TM2 and TM4 are purged for upcoming water lines helium pressure test.

ELOG V2.9.2-2455