Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1159
Entry time:
Thursday, February 25, 2016, 09:29
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
TM4
Target/Number:
Subject:
TM4 has been disconnected in ITE.
TM4 has been disconnect in ITE(except vacuum lines). The ITE vacuum system is still operating.
ELOG V2.9.2-2455