Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1163     Entry time: Friday, March 04, 2016, 13:58
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 2016 Winter Shut Down Target Hall Schedule 

Update Schedule according to changes.See attachment1, 2.

 Re-post it after some minor correction See attachment 3,4.

Update schedule according changes. See attachments 5,6

 update schedule according to changes. See attachment 7,8

Attachment 1: 2016_winter_shut_down__target_hall_schedule.mpp  320 kB
Attachment 2: 2016_winter_shut_down__target_hall_schedule.pdf  152 kB  | Show | Hide all
Attachment 3: 2016_winter_shut_down__target_hall_schedule.pdf  145 kB  | Show | Hide all
Attachment 4: 2016_winter_shut_down__target_hall_schedule.mpp  304 kB
Attachment 5: 2016_winter_shut_down__target_hall_schedule.pdf  150 kB  Uploaded Tuesday, March 08, 2016, 09:43  | Show | Hide all
Attachment 6: 2016_winter_shut_down__target_hall_schedule.mpp  362 kB  Uploaded Tuesday, March 08, 2016, 09:43
Attachment 7: 2016_winter_shut_down__target_hall_schedule.pdf  150 kB  Uploaded Friday, March 11, 2016, 07:47  | Show | Hide all
Attachment 8: 2016_winter_shut_down__target_hall_schedule.mpp  352 kB  Uploaded Friday, March 11, 2016, 07:47
ELOG V2.9.2-2455