Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1153     Entry time: Friday, January 22, 2016, 14:24
Author: David Wang 
Category: South Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 2016 Winter Shut Down Target Hall Schedule (sketch) 

Post a sketch of 2016 winter shut down target hall schedule. see attachment 1,2

 UPDATE THE SCHEDULE ACCORDING TO CYCLOTRON SIDE JOB. SEE ATTACHMENTS 3,4

Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf  145 kB  | Show | Hide all
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp  271 kB
Attachment 3: 2016_winter_shut_down__target_hall_schedule.pdf  145 kB  Uploaded Friday, February 05, 2016, 08:53  | Show | Hide all
Attachment 4: 2016_winter_shut_down__target_hall_schedule.mpp  384 kB  Uploaded Friday, February 05, 2016, 08:53
ELOG V2.9.2-2455