Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1151     Entry time: Friday, January 08, 2016, 09:29
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module:  
Target/Number:  
Subject: Window Decon 

Entered the hot cell to perform final decon on the window. Initial swipes this morning were 11000 c.p.m. on 44-2. After decon approximately 100 counts.

ELOG V2.9.2-2455