Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
1156
Entry time:
Thursday, February 25, 2016, 06:48
Author:
David Wang
Category:
ITE
Type:
Standard Operation
Module:
Target/Number:
Subject:
4 Shielding blocks have been transferred from ITE to block storage area.
Dan and I transferred 4 shielding blocks from ITE to block storage area. The ITE pit is opened now.
ELOG V2.9.2-2455