Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 1154     Entry time: Friday, February 12, 2016, 13:00
Author: David Wang 
Category: Conditioning Station 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: 2016 Winter Shut Down Target Hall Schedule  

2016 Winter shut down target hall schedule. See attachments1,2.

 update the schedule weekly. Everything is on time so far. see attachment 3,4.

Update the schedule according to beam new beam schedule and target process. see attachment 5,6

Attachment 1: 2016_winter_shut_down__target_hall_schedule.mpp  544 kB
Attachment 2: 2016_winter_shut_down__target_hall_schedule.pdf  151 kB  | Show | Hide all
Attachment 3: 2016_winter_shut_down__target_hall_schedule.mpp  544 kB  Uploaded Friday, February 19, 2016, 07:23
Attachment 4: 2016_winter_shut_down__target_hall_schedule.pdf  153 kB  Uploaded Friday, February 19, 2016, 07:23  | Show | Hide all
Attachment 5: 2016_winter_shut_down__target_hall_schedule.mpp  544 kB  Uploaded Tuesday, February 23, 2016, 11:45
Attachment 6: 2016_winter_shut_down__target_hall_schedule.pdf  156 kB  Uploaded Tuesday, February 23, 2016, 11:45  | Show | Hide all
ELOG V2.9.2-2455