2446
|
Thursday, May 25, 2023, 13:10 |
David Wang | Conditioning Station | Maintenance | TM2 | | TCS MP1 is replaced due to poor performace. | TCS MP1 is replaced due to poor performance(
system shows unstable and high reading on
TCSCG1A and high TP1,TP2 current draw) . |
|
2447
|
Monday, May 29, 2023, 12:52 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | Module Connection | TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully. |
|
2449
|
Tuesday, May 30, 2023, 12:30 |
Frank Song | ITW | Standard Operation | TM2 | TiC#6 | gas lines pump out in ITW Faraday Cage | Gas lines pumped |
|
2453
|
Tuesday, June 06, 2023, 17:36 |
Carla Babcock | ITW | Standard Operation | TM2 | TiC#6 | Module conditioning | Conditioned TM2 up to 48kV in ITW. Some
sparks and current is not very stable. Drawing
about 178uA at 48kV. |
|
2472
|
Tuesday, August 08, 2023, 12:59 |
David Wang | ITW | Standard Operation | TM2 | SiC #6 | TM2 SiC#6 dhas been disconnected in ITW | TM2 SiC#6 has been disconnected in ITW.
See check list |
|
2473
|
Tuesday, August 08, 2023, 13:01 |
David Wang | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TM2 TiC#6 post run electrical check at NHC. | TM2 TiC#6 post run electrical check has
been done at TCS. See attachment |
|
2474
|
Wednesday, August 09, 2023, 09:41 |
David Wang | North Hot-Cell | Standard Operation | TM2 | Nb#10 | TM2 Nb# 10 electrical and leak check at NHC | Nb#10 has been installed on TM2 . electrical
and leak check on HS line are good. See attachment. |
|
2475
|
Wednesday, August 09, 2023, 13:13 |
David Wang | Conditioning Station | Standard Operation | TM2 | Nb#10 | Tm2 Nb#10 has been connect at TCS. | TM2 Nb#10 has been connect at TCS. TCS
water system and vacuum system have been
started. Everything looks ok so far. TCS |
|
2476
|
Wednesday, August 09, 2023, 13:43 |
Carla Babcock | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TiC#6 PIE | PIE on TiC#6 was done in the NHC. The target
assembly looked brand new when we took it
out, no heating spots or deposits (pictures |
|
2477
|
Tuesday, August 15, 2023, 13:58 |
Frank Song | ITW | Standard Operation | TM2 | Nb#10 | Module Connection | TM2 with new target Nb#10 was moved
to ITW from TCS and re-connected in pit.
TPs are running at their full speed. |
|
2479
|
Friday, August 25, 2023, 07:22 |
Frank Song | ITW | Repair | TM2 | Nb#10 | module disconnection | TM2 with target Nb#10 was disconnected
in ITW yesterday for beam production issue
investigation. |
|
2480
|
Monday, August 28, 2023, 12:16 |
Frank Song | North Hot-Cell | Repair | TM2 | Nb#11 | electric/leak check | TM2 with new target Nb#11 has been
E/L checked sitting on NHC. |
|
2481
|
Tuesday, August 29, 2023, 09:07 |
Frank Song | ITW | Repair | TM2 | Nb#11 | electrical check | TM2 with new target Nb#11 replaced
has been electric checked one more time in
ITW. |
|
2482
|
Tuesday, August 29, 2023, 09:28 |
Frank Song | ITW | Repair | TM2 | Nb#11 | Module Connection | Module was connected yesterday and
all turbo pumps are running at their top
speed. |
|
2490
|
Tuesday, October 03, 2023, 07:56 |
Frank Song | ITW | Standard Operation | TM2 | Nb#11 | module disconnection | TM2 with target Nb#11 has been disconneted
in ITW. The HS line was purged with Nitrogen
in station. |
|
2491
|
Tuesday, October 03, 2023, 14:28 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Nb#11 | electrical check | An electric checked right after TM2
was moved from ITW. |
|
2492
|
Wednesday, October 04, 2023, 10:41 |
Frank Song | South Hot-Cell | Standard Operation | TM2 | Ta#66 | electrical check/leak check | TM2 with new target Ta#66 had an
electrical check and leak check on SHC. |
|
2493
|
Thursday, October 05, 2023, 13:50 |
Frank Song | ITW | Standard Operation | TM2 | Ta#66 | Module Connection | TM2 with new target Ta#66 was connected
in ITW. |
|
2514
|
Wednesday, January 03, 2024, 13:55 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | Disconnect TM2 in ITW. | TM2 has been disconnected in ITW. All water
lines are nitrogen purged. Filled 60 psi
argon to all Tm2 water lines for module storage |
|
2515
|
Wednesday, January 03, 2024, 14:03 |
David Wang | ITW | Standard Operation | TM2 | Ta#66 | ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test. | ITW primary and secondary vacuum vessel
leak check and TM2 water lines helium pressure
test are done today. No major concern. see |
|