Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2449     Entry time: Tuesday, May 30, 2023, 12:30
Author: Frank Song 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: TiC#6 
Subject: gas lines pump out in ITW Faraday Cage 

 Gas lines pumped down at electric room for TM2 at ITW is done, leak rate 0.0e -8 <1.0e -3 T P pressure

Attachment 1: gas_lines_pumped_out_to_ITW.JPG  62 kB  | Show | Hide all
ELOG V2.9.2-2455