Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2490     Entry time: Tuesday, October 03, 2023, 07:56
Author: Frank Song 
Category: ITW 
Type: Standard Operation 
Module: TM2 
Target/Number: Nb#11 
Subject: module disconnection 

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf  158 kB  | Show | Hide all
ELOG V2.9.2-2455