Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2473     Entry time: Tuesday, August 08, 2023, 13:01
Author: David Wang 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: TiC#6 
Subject: TM2 TiC#6 post run electrical check at NHC. 

TM2 TiC#6 post run electrical check has been done at TCS. See attachment

Attachment 1: TiC#6_post_run_electrical_check.pdf  114 kB  | Show | Hide all
ELOG V2.9.2-2455