Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2492     Entry time: Wednesday, October 04, 2023, 10:41
Author: Frank Song 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM2 
Target/Number: Ta#66 
Subject: electrical check/leak check 

 TM2 with new target Ta#66 had an electrical check and leak check on SHC. 

Attachment 1: TM2_with_Ta#66_electical_and_leak_check_in_SHC_2023-10-04.pdf  79 kB  | Show | Hide all
ELOG V2.9.2-2455