2123
|
Tuesday, July 07, 2020, 17:43 |
Carla Babcock | ITE | Development | TM4 | | RF tests on new IG-LIS wiring | Tested RF from RF driver into new IGLIS
wires at ITE. Used 5V, 1MHz (2MHz setting
because of internal halving issue). |
|
|
983
|
Wednesday, July 08, 2015, 12:18 |
chad fisher | South Hot-Cell | Repair | TM2 | | R U Coil line Removal | R U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module. |
|
|
362
|
Monday, May 27, 2013, 10:35 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | Pumps Started HV testing to follow | The pumps have been turned on at ~9:30
this morning. Current values are 6.61 Mohm
TCS:DIC1 @19.4 C. HV testing will start momentarily. |
|
|
1673
|
Tuesday, January 02, 2018, 14:47 |
Anders Mjos | Conditioning Station | Standard Operation | | | Pumping on secondary vacuum | Tuesday, January 02, 2018, 14:45: TP1S
started |
|
|
22
|
Thursday, August 18, 2011, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#2 | Pump Down | Pump down in the conditioning station
started at ~2:40 for rough down. The turbo
pumps were turned on at ~3:30 and at 3:52 |
|
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
|
1307
|
Friday, August 05, 2016, 14:13 |
Isaac Earle | North Hot-Cell | Development | | | Preparations for NHC Ventilation Test | A hole was drilled in the NHC exhaust duct
in the east end of the target hall above
the hatch to the Ante Room. This will |
|
|
2428
|
Thursday, March 30, 2023, 14:29 |
Frank Song | ITE/ITW | Development | | | Preparation of target stations for FEBIAD runs | Helium cylinder and Argon cylinder
are installed in both ITE/ITW faraday cages
, regulator for outlet pressure are not set |
|
|
344
|
Wednesday, May 15, 2013, 10:17 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | Preliminary Results from HV testing | Testing on TM3 without a source tray
was completed on 13/05.2013. All items were
tied to common and the water blocks were |
|
|
1886
|
Thursday, March 07, 2019, 12:20 |
chad fisher | South Hot-Cell | Repair | TM2 | | Pre-polishing pictures | Pictures of the water blocks before polishing
can be found on docushare, collection 24400 |
|
|
507
|
Thursday, October 17, 2013, 17:16 |
Grant Minor | ITE | Repair | | | Pre-Separator-area (ITE Harp 9) Blocks Replaced | The pre-separator-area blocks were replaced
today by Bevan and Travis, with Grant present
for photos and observation. |
8x |
|
1669
|
Thursday, December 21, 2017, 15:11 |
Anders Mjos | Conditioning Station | Maintenance | | | Powered down devices | Powered down mechanical pumps in ISAC-I
Experimental hall, vacuum gauge and turbo
pump controllers in ISAC-I B2 North Hot Cell |
|
|
1594
|
Thursday, August 03, 2017, 17:08 |
Anders Mjos | Conditioning Station | Repair | TM2 | | Power bump | Thursday, August 03, 2017, 17:08:
Restarting vacuum and water system |
|
|
2386
|
Thursday, November 03, 2022, 16:41 |
Carla Babcock | North Hot-Cell | Standard Operation | | UCx#39 | Post irradiation inspection UCx#39 | Did the PIE on UCx#39-IGLIS on Thursday
Nov. 2 2022, couple pictures uploaded to
docushare. Did not remove the target, just |
|
|
2397
|
Thursday, December 01, 2022, 13:45 |
Carla Babcock | North Hot-Cell | Standard Operation | TM4 | C#4 | Post irradiation inspection C#4 | Post irradiation inspection of C#4 which
was running in TM4/ITE was conducted at the
NHC on Nov. 22 2022. |
|
|
1573
|
Thursday, June 29, 2017, 11:12 |
Anders Mjos | South Hot-Cell | Standard Operation | TM4 | UC#20 | Post Irradiation Examination (PIE) | The target was inspected by Chad and Anders.
Photos are available on DocuShare.
It was noticed that the target tube heater |
|
|
1790
|
Monday, September 24, 2018, 10:21 |
Anders Mjos | South Hot-Cell | Standard Operation | TM2 | UC#23 | Post Irradiation Examination (PIE) | UC#23 experienced short between target
and heat shield as it was heated during operation.
The inspection of the target after irradiation |
|
|
1326
|
Tuesday, August 23, 2016, 08:05 |
chad fisher | South Hot-Cell | Maintenance | | | Post Hot Cell Entry Clean-up | Plastic has been removed from the floor
and any known active items in the hot cell
moved to the south east corner in an attempt |
|
|
2308
|
Thursday, February 24, 2022, 13:23 |
David Wang | ITE/ITW | Maintenance | | | Polyurethane water cooling lines replacement in ITE and ITW. | Polyurethane water cooling lines
in ITE and ITW HV shroud are replaced.
Both stations Ta, Tu, MSP, HS, Coil , EE |
|
|
390
|
Thursday, June 27, 2013, 14:27 |
chad fisher | South Hot-Cell | Development | | | Polishing Cleaning tool - Water blocks | The polishing/cleaning tool prototype is
now finished and appers to work great.
Thanks to Dan and Maico for the great |
|