Message ID: 344     Entry time: Wednesday, May 15, 2013, 10:17
Author: Bevan Moss 
Category: Conditioning Station 
Type: Standard Operation 
Module: TM3 
Target/Number: No Source Tray 
Subject: Preliminary Results from HV testing 

 Testing on TM3 without a source tray was completed on 13/05.2013. All items were tied to common and the water blocks were left open at the bottom of the module. They were left with the quick connections at the top. The vacuum was in the low 10^-6T range so this was deemed acceptable. The cooling lines withing the cage in the target hall were shorted so flow could continue. As you will see from the results a maximum of 44kV was achieved before a major spark turned the power supply off. I will be compiling all the the data so it can be compared. Also attached is the archiver data, strip tool data, and RGA data.

Attachment 1: module_hv_test_0KV.rga  21 kB
Attachment 2: MODULE_hv_test_42kv.rga  21 kB
Attachment 3: TM3_13052013_no_source_tray.xlsx  400 kB