Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2397     Entry time: Thursday, December 01, 2022, 13:45
Author: Carla Babcock 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: C#4 
Subject: Post irradiation inspection C#4 

Post irradiation inspection of C#4 which was running in TM4/ITE was conducted at the NHC on Nov. 22 2022.

The yields from this target had been dropping and its behaviour was erratic, with the voltages on the tube and target jumping all over the place sometimes. The ion current on the FCs followed the voltages. We took this to mean the target container was breaking down.

Upon inspection we found the container looked pretty damaged - highly crystallized and distorted. The container had gone banana-shaped, but not in the usual direction. It had curved  in the direction of the ion source (see photos). The heat shield and other surrounding components were super clean, no deposits or marks at all.

Attachment 1: 20221122_152435.jpg  3.147 MB  | Show | Hide all
Attachment 2: 20221122_153033.jpg  2.733 MB  | Show | Hide all
Attachment 3: 20221122_152407.jpg  3.182 MB  | Show | Hide all
ELOG V2.9.2-2455