Subject: Post Hot Cell Entry Clean-up 

Plastic has been removed from the floor and any known active items in the hot cell moved to the south east corner in an attempt to shield the anteroom. Fields at the aluminum panel were reduced from 66 uSv/h to 58.8uSv\h. No contamination found on walls, floor, tacky mats, or standard aluminum cover. The aluminum cover with breathable air line hole did have 400 counts on 44-2, 1200 on ludlum.

 