Message ID: 361     Entry time: Thursday, May 23, 2013, 14:12
Author: Bevan Moss 
Category: Conditioning Station 
Type: Maintenance 
Module:  
Target/Number:  
Subject: Primary Circuit Drained and Flushed 

 Rob Walker has drained the primary side of the conditioning station. It will be flushed, filled  and chemically treated. It was desired to chemically treat the primary side before before but it took so long that sediment was found (things started to grow).