Message ID: 1573     Entry time: Thursday, June 29, 2017, 11:12
Author: Anders Mjos 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UC#20 
Subject: Post Irradiation Examination (PIE) 

The target was inspected by Chad and Anders. Photos are available on DocuShare. It was noticed that the target tube heater terminals had lifted up from the insulator on the target assembly as seen in this Photo. This has later been detemined to be from the assembly, where additional clearance was required and achieved by installing washers.