Message ID: 2123     Entry time: Tuesday, July 07, 2020, 17:43
Author: Carla Babcock 
Category: ITE 
Type: Development 
Module: TM4 
Target/Number:  
Subject: RF tests on new IG-LIS wiring 

Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).

As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).

The matching resistor will be changed and it will be retested.