Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 983     Entry time: Wednesday, July 08, 2015, 12:18
Author: chad fisher 
Category: South Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number:  
Subject: R U Coil line Removal 

R U coil line removal started at 11:30. Water block jig installed and coil line disconnected from module.

Attachment 1: TM2_20150708_coil_line_leak.jpg  972 kB  | Show | Hide all
ELOG V2.9.2-2455