Message ID: 2386     Entry time: Thursday, November 03, 2022, 16:41
Author: Carla Babcock 
Category: North Hot-Cell 
Type: Standard Operation 
Module:  
Target/Number: UCx#39 
Subject: Post irradiation inspection UCx#39 

Did the PIE on UCx#39-IGLIS on Thursday Nov. 2 2022, couple pictures uploaded to docushare. Did not remove the target, just the heat shield cover.

Final electrical check on the module showed a dead short from TGHT/TBHT to HV common, which we did not see online. Seems like it must have occurred after ramp down? It persisted on the target after we removed it from the module. We couldn't find any obvious contact points, because it seems it did not happen while current was running in the target. Possible locations are the bottom support leg for the TBHT and the top of the right side target leg, though it was difficult to confirm with the camera.

Otherwise the only thing to note was a blacker-than-usual spot on the inside of the Cu heat shield, downstream in the proton direction.

 