2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. | TM3 has been moved from ITW to S-W silo.
The move is smooth. |
|
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW. The
move is smooth. |
|
|
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection | TM4 with target TiC#9 is connected
in ITW. See attachment. |
|
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. | vacuum leak check on TM4 service cap in
ITW was done this morning. leak
detector leak rate 0.0XE-9 atm.cc/sec. No |
|
|
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection | TM4 with spent target TiC#9 was disconnected
in 29-10-2024 and it is being moved from
ITW to SHC. |
|
|
2717
|
Tuesday, November 12, 2024, 12:30 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | Module Connection | TM4 with new target UCx#46 was moved
from TCS to ITW and has been re-connected
right after. see attachment pls. |
|
|
2739
|
Friday, January 03, 2025, 10:41 |
David Wang | ITW | Standard Operation | TM4 | UCX46 | ITW primary and secondary vacuum vessel leak check for 2025 shut down | ITW primary and secondary vacuum vessel
leak check for 2025 shut down has been
done. Also,TM4 internal water line helium |
|
|
2741
|
Monday, January 06, 2025, 08:38 |
Frank Song | ITW | Standard Operation | TM4 | UCx#46 | module disconnection | TM4 WITH UCx#46 was disconnected
in 2025-01-02 in ITW. Forms attached. |
|
|
2628
|
Tuesday, July 02, 2024, 11:38 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been moved
from ITW to ITE, MAA area has been secured. |
|
|
2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving. |
|
|
1144
|
Tuesday, December 01, 2015, 11:26 |
Travis Cave | ITE/ITW Cooling | Standard Operation | TM4 | UC#14 | Module moved | TM#4 with UC#14 has been moved from the
conditioning station to the east target station. |
|
|
1164
|
Monday, March 14, 2016, 11:24 |
David Wang | ITE/ITW Cooling | Maintenance | | | HALCW resin tank filter cartridges are changed today | Two of resin tank filter cartridges(supply
and return) are changed today. Old cartridges
and bagged and tagged. The contact field |
|
|
1200
|
Friday, April 08, 2016, 08:13 |
Anders Mjos | ITE/ITW Cooling | Maintenance | | | High Active Water Resistivity | The high active water resistivity took
a long time to recover after the upgrade
to the water cooling circuit. The system |
|
|
1671
|
Tuesday, January 02, 2018, 10:46 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Start High active water system. | High active water system was
checked before restart. A small water leak
on resin can supply valve was found. It is |
|
|
1676
|
Tuesday, January 16, 2018, 06:50 |
David Wang | ITE/ITW Cooling | Standard Operation | | | Field measurement on old resin tank in silo | The old resin tank has been stored in silo
since last year March. Without crane
the tank up, We use the pole monitor measured |
|
|
1693
|
Wednesday, March 07, 2018, 10:36 |
David Wang | ITE/ITW Cooling | Development | | | HALCW resin can flow meter replacment | HALCW resin can flow meter replacement
is done. Less that 100 mL water was drained
to a small tray during the job. RPG checked |
|
|
2080
|
Monday, March 09, 2020, 14:31 |
David Wang | ITE/ITW | Standard Operation | | | TH emergency exit test. | Frank and I did the test. The emergency
exit hatch on roof was opened and closed
twice. Everything works fine. |
|
|
2082
|
Thursday, March 12, 2020, 13:42 |
David Wang | ITE/ITW | Development | | | New ITE IGLIS cables installation | New IGLIS cables installation is done.
Two bundle of new cables are pulled from
ITE to electrical room. They are in one PVC |
|
|
2214
|
Friday, April 30, 2021, 14:09 |
Luca Egoriti | ITE/ITW | Development | TM4 | | TM4 resistance measurements for P2N | Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical |
|
|
2225
|
Wednesday, June 09, 2021, 10:15 |
David Wang | ITE/ITW | Standard Operation | TM4 | UCX33. | ITE water signal interlock check. | Annual ITE water signal interlock check
is done. HS, TAR, TUBE, MSP, EE, COIL
1, containment box window, HVC1, HVC2, 2A |
|