Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2526     Entry time: Monday, January 22, 2024, 09:56
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: Entrance module has been connected in ITW pit. 

Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".

 

ELOG V2.9.2-2455