Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2538     Entry time: Tuesday, February 06, 2024, 13:28
Author: David Wang 
Category: ITW 
Type: Maintenance 
Module:  
Target/Number:  
Subject: ITW exit 1 module has been disconnected and reconnected for o ring replacement 

ITW exit 1 module was disconnected  for Exit module flange o -ring replacement yesterday. After oring replacement, the module has been reconnected.

ELOG V2.9.2-2455