Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2525     Entry time: Monday, January 22, 2024, 09:50
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module:  
Target/Number:  
Subject: ITW entrance module has been moved from SHC to ITW. 

ITW entrance module has been moved from SHC to ITW. A slightly bump on module shielding block bottom side corner to tank vessel side when lowed module into tank. No big concern on this slight  bumping. Otherwise the move is perfect.

 

 

 

 

 

 

ELOG V2.9.2-2455