Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2577     Entry time: Thursday, May 02, 2024, 09:00
Author: David Wang 
Category: ITW 
Type: Standard Operation 
Module: TM4 
Target/Number:  
Subject: Annual ITW water signal interlock check has been done.  

Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine.

ELOG V2.9.2-2455