Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 77 of 141  Not logged in ELOG logo
ID Date Author Categorydown Type Module Target/Number Subject
  2472   Tuesday, August 08, 2023, 12:59 David WangITWStandard OperationTM2SiC #6TM2 SiC#6 dhas been disconnected in ITW

TM2 SiC#6 has been disconnected in ITW. See check list

Attachment 1: TiC#6_TM2_disconnection_checklist.pdf
TiC#6_TM2_disconnection_checklist.pdf TiC#6_TM2_disconnection_checklist.pdf TiC#6_TM2_disconnection_checklist.pdf
  2477   Tuesday, August 15, 2023, 13:58 Frank SongITWStandard OperationTM2Nb#10Module Connection

 TM2 with new target Nb#10 was moved to ITW from TCS and re-connected in pit. TPs are running at their full speed. 

Attachment 1: TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf TM2_with_Nb#10_connection_in_ITW_2023-08-15.pdf
  2479   Friday, August 25, 2023, 07:22 Frank SongITWRepairTM2Nb#10module disconnection

 TM2 with target Nb#10 was disconnected in ITW yesterday for beam production issue investigation.

Attachment 1: TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
  2481   Tuesday, August 29, 2023, 09:07 Frank SongITWRepairTM2Nb#11electrical check

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf
  2482   Tuesday, August 29, 2023, 09:28 Frank SongITWRepairTM2Nb#11Module Connection

 Module was connected yesterday and all turbo pumps are running at their top speed. 

Attachment 1: TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
  2493   Thursday, October 05, 2023, 13:50 Frank SongITWStandard OperationTM2Ta#66Module Connection

 TM2 with new target Ta#66 was connected in ITW. 

Attachment 1: TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf TM2_with_Ta#66_connection_in_ITW_2023-10-04.pdf
  2514   Wednesday, January 03, 2024, 13:55 David WangITWStandard OperationTM2Ta#66Disconnect TM2 in ITW.

TM2 has been disconnected in ITW. All water lines are nitrogen purged. Filled 60 psi argon to all Tm2 water lines for module storage in winter shut down.

Attachment 1: TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf TM2_with_Ta#66_was_disconnected_in_ITW_2024-01-02.pdf
  2515   Wednesday, January 03, 2024, 14:03 David WangITWStandard OperationTM2Ta#66ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test.

ITW primary and secondary vacuum vessel leak check and TM2 water lines helium pressure test are done today. No major concern. see attachment for small air to vacuum leak we found.  TM2 water lines helium pressure test is fine.   HS and window line leak rate are 1.4Xe-8 atm.cc/sec. all other water lines are below 3.0XE-9atm.cc/sec.

Attachment 1: ITW_2024_shut_down_leak_check.pdf
ITW_2024_shut_down_leak_check.pdf
  2521   Thursday, January 11, 2024, 13:57 David WangITWStandard Operation  ITW entrance module has been disconnect.

ITW entrance module has been disconnected per document190510. It will be moved to SHC for diagnostic group tomorrow.

  2525   Monday, January 22, 2024, 09:50 David WangITWStandard Operation  ITW entrance module has been moved from SHC to ITW.

ITW entrance module has been moved from SHC to ITW. A slightly bump on module shielding block bottom side corner to tank vessel side when lowed module into tank. No big concern on this slight  bumping. Otherwise the move is perfect.

 

 

 

 

 

 

  2526   Monday, January 22, 2024, 09:56 David WangITWStandard Operation  Entrance module has been connected in ITW pit.

Entrance module has been connected in ITW pit per document 190510 " entrance module disconnection and removal procedure".

 

  2538   Tuesday, February 06, 2024, 13:28 David WangITWMaintenance  ITW exit 1 module has been disconnected and reconnected for o ring replacement

ITW exit 1 module was disconnected  for Exit module flange o -ring replacement yesterday. After oring replacement, the module has been reconnected.

  2539   Tuesday, February 06, 2024, 13:36 David WangITWMaintenance  ITW exit 1 module tank flange o ring has been replaced.

ITW exit 1 module tank flange o ring has been replaced. the old o r-ing was completely flat in slot without elastic property.  tank flange, module flange, and o ring slot were clean by acetone and canister vacuumed. Raised up module 3 feet and pulled new o-ring over module top so new o ring could be  installed without moving module out. after new o ring installation, craned down module to flange and raised up module 2 feet again to confirm the o ring is properly sit in slot.

  2541   Monday, February 12, 2024, 18:44 Carla BabcockITWMaintenance  ITW annual HV testing

ITW was set up for HV testing - water is running and at a high resistivity due to injected N. Einzel lens is attached to ground. Everything else is as normal. The module plug is in so no vacuum bypasses were needed. Very easy to ramp to 60kV. Sat at 60 for about 1.5hrs with maybe 1 spark (hard to say from the strip tool data). Current draw was about 176uA. Data dumped as isac/data/ITW_HVtesting_shutdown2024

Attachment 1: Screenshot_from_2024-02-12_18-44-03.png
Screenshot_from_2024-02-12_18-44-03.png
  2544   Thursday, February 15, 2024, 13:52 David WangITWStandard Operation  ITW entrance module and exit 1 module leak check after module move and tank flange orings replacement.

 ITW entrance module and exit 1 module leak check on module service cap/top air to vacuum seals and module to tank flange  o-rings have been done. all seals and o rings are leak free to 0.0 xE-9atm.cc/sec except one leak ( to low E-6 atm.cc/sec) on ITW RV4 KF50 o-ring was found. It caused by a cross o ring surface scratch on KF 50 flange. the scratch was sanded and polished out. on second time leak check, it is leak free.

  2574   Tuesday, April 30, 2024, 09:20 David WangITWDevelopmentTM4 A new SST gas line is using for ITW febiad gas staion in pit.

A new SST gas line with swagelock tube fittings and VCR fit is using for ITW febiad gas staion in pit. Gas line is leak checked on bench. No leak . it is installed on TM4 in ITW now,

  2575   Wednesday, May 01, 2024, 09:50 David WangITWStandard OperationTM4 TM4 has been connected to ITW.

TM4 has been connected to ITW. see attachment.

Attachment 1: Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf Scanned_from_a_Xerox_Multifunction_Printer_(10).pdf
  2577   Thursday, May 02, 2024, 09:00 David WangITWStandard OperationTM4 Annual ITW water signal interlock check has been done.

Annual ITW water signal interlock check has been done. Renee helped me on it. Everything works fine.

  2581   Thursday, May 02, 2024, 18:48 Carla BabcockITWStandard Operation  ITW cage setup

ITW gas lines pumped down to 2e-3Torr on leak detector with leak rate in the low e-7 atm-cc/s. Gas bottles opened at 3psi and labels in epics changed to reflect correct setup. switch box set to cathode mode, checked that anode wire was at HV common.

note ballast is removed from ITW now to be used in ITE so that line is blanked off.

ELOG V2.9.2-2455