Tuesday, September 03, 2024, 11:40, David Wang, ITW, Standard Operation, TM3, TiC#8, TM3 has been moved from ITW to S-W silo.
|
TM3 has been moved from ITW to S-W silo. The move is smooth. |
Tuesday, September 17, 2024, 11:16, David Wang, ITW, Standard Operation, TM4, TiC#9, TM4 has been moved from TCS to ITW.
|
TM4 has been moved from TCS to ITW. The move is smooth. |
Tuesday, September 17, 2024, 13:42, Frank Song, ITW, Standard Operation, TM4, TiC#9 , Module Connection
|
TM4 with target TiC#9 is connected in ITW. See attachment. |
Monday, September 23, 2024, 11:35, David Wang, ITW, Standard Operation, TM4, TiC #9., vacuum leak check on TM4 service cap in ITW.
|
vacuum leak check on TM4 service cap in ITW was done this morning. leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap
module top. |
Tuesday, November 05, 2024, 09:49, Frank Song, ITW, Standard Operation, TM4, TiC#9 , module disconnection
|
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
Tuesday, November 12, 2024, 12:30, Frank Song, ITW, Standard Operation, TM4, UCx#46, Module Connection
|
TM4 with new target UCx#46 was moved from TCS to ITW and has been re-connected right after. see attachment pls. |
Friday, January 03, 2025, 10:41, David Wang, ITW, Standard Operation, TM4, UCX46, ITW primary and secondary vacuum vessel leak check for 2025 shut down
|
ITW primary and secondary vacuum vessel leak check for 2025 shut down has been done. Also,TM4 internal water line helium pressure test has been
finished. Both results are normal. There are two small old leak on EXit 1 and Exit2 module top plate o-ring under 1Xe-8 atm.cc/sec which we
knoew in past years test. resin spray on leak area reduce the leak ratee below 5Xe-9 atm.cc/sec. No concern on these small leak. See attachment |
Monday, January 06, 2025, 08:38, Frank Song, ITW, Standard Operation, TM4, UCx#46, module disconnection
|
TM4 WITH UCx#46 was disconnected in 2025-01-02 in ITW. Forms attached. |
Tuesday, July 02, 2024, 11:38, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks have been moved from ITW to ITE, MAA area has been secured. |
Wednesday, July 24, 2024, 10:10, Frank Song, ITE/ITW/Storage Area, Standard Operation, , , shielding blocks transfer
|
5 shielding blocks have been transferred from ITE to ITW. MAA is secured again after moving. |
Tuesday, December 01, 2015, 11:26, Travis Cave, ITE/ITW Cooling, Standard Operation, TM4, UC#14, Module moved
|
TM#4 with UC#14 has been moved from the conditioning station to the east target station. |
Monday, March 14, 2016, 11:24, David Wang, ITE/ITW Cooling, Maintenance, , , HALCW resin tank filter cartridges are changed today
|
Two of resin tank filter cartridges(supply and return) are changed today. Old cartridges and bagged and tagged. The contact field on them are 650usv/hr.
The new cartridges are fiber-glass, Triumf store item. After replacement, the field on contact with the filter case are about 10 usv/hr. But the field
on contact with top resin tank has been increased from 45usv/hr to 225 usv/hr |
Friday, April 08, 2016, 08:13, Anders Mjos, ITE/ITW Cooling, Maintenance, , , High Active Water Resistivity
|
The high active water resistivity took a long time to recover after the upgrade to the water cooling circuit. The system needed about a month (from end
February to end March) to recover to nominal values. See attached plot of archiver data.
TM1 has now been connected in ITW and the water resistivity remains > 8 MOhm cm, which should allow normal operation. However, the resin is |
Tuesday, January 02, 2018, 10:46, David Wang, ITE/ITW Cooling, Standard Operation, , , Start High active water system.
|
High active water system was checked before restart. A small water leak on resin can supply valve was found. It is fixed. MP1 and MP2 were
started and checked separately. System pressure and flow rate are normal.MP1 is in operation now. |
Tuesday, January 16, 2018, 06:50, David Wang, ITE/ITW Cooling, Standard Operation, , , Field measurement on old resin tank in silo
|
The old resin tank has been stored in silo since last year March. Without crane the tank up, We use the pole monitor measured the field around
the bottom of the tank in silo. The average contact field on the bottom is about 4.0msv/hr. @0.5meter , the field is about 900usv/hr. It is still
too hot to remove it. |
Wednesday, March 07, 2018, 10:36, David Wang, ITE/ITW Cooling, Development, , , HALCW resin can flow meter replacment
|
HALCW resin can flow meter replacement is done. Less that 100 mL water was drained to a small tray during the job. RPG checked the water. Less than 20
counts. Water are dumped the high active sump. The HALCW MP1 is started. No leak on new gauges and fittings. Old gauge is labeled , bagged,
and stored in TH. |
Monday, March 09, 2020, 14:31, David Wang, ITE/ITW, Standard Operation, , , TH emergency exit test.
|
Frank and I did the test. The emergency exit hatch on roof was opened and closed twice. Everything works fine. |
Thursday, March 12, 2020, 13:42, David Wang, ITE/ITW, Development, , , New ITE IGLIS cables installation
|
New IGLIS cables installation is done. Two bundle of new cables are pulled from ITE to electrical room. They are in one PVC conduit. The old cables are
not removed yet. I will pull old cables out when new cables are installed onto device in ITE Faraday cage. |
Friday, April 30, 2021, 14:09, Luca Egoriti, ITE/ITW, Development, TM4, , TM4 resistance measurements for P2N
|
Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical feedthroughs (A,B,C,D,E,I,P,Q,R,U,60kV,ground) taken with no target or no short attached to the module. |
Wednesday, June 09, 2021, 10:15, David Wang, ITE/ITW, Standard Operation, TM4, UCX33. , ITE water signal interlock check.
|
Annual ITE water signal interlock check is done. HS, TAR, TUBE, MSP, EE, COIL 1, containment box window, HVC1, HVC2, 2A window, 2A shielding
plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked. Everything is working properly.
2021-06-22. Annual ITW water signal interlock check is done, HS, TAR, MSP, EE, COIL1 , containment box window, HVC1 , HVC2, 2A window, |
|