2432
|
Tuesday, April 18, 2023, 07:28 |
chad fisher | North Hot-Cell | Maintenance | | | NHC entry summary | NHC was entered on April 17, 2023 for inspection
and maintenance. Summary :
Compressible and non-compressible |
|
|
2439
|
Monday, May 08, 2023, 10:59 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check/leak check | TM4 with target TiC#5 installed has
been leak checked and electric checked on
NHC. |
|
|
2456
|
Tuesday, June 13, 2023, 11:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | TiC#5 | electrical check | TM4 with spent target TiC#5 electric
check after moving from ITE to NHC. |
|
|
2457
|
Tuesday, June 13, 2023, 11:49 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | electrical check and leak check | TM4 with new target SiC#45 installed
has been leak checked and electrical checked
on top of NHC. |
|
|
2463
|
Wednesday, July 12, 2023, 22:21 |
Carla Babcock | North Hot-Cell | Standard Operation | | TiC#5 | TiC#5 post irradiation inspection results | The TiC#5 post irradiation inspection was
done on Wed. June 14 and Mon. June 19. This
target didn't have any obvious issues but |
|
|
2464
|
Tuesday, July 18, 2023, 10:08 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | SiC#45 | module disconnection & electrical check right after transferred from ITE to NHC | TM4 with spent target SiC#45 was
disconnected ITE and an electrical
check made right after moved on NHC. |
|
|
2466
|
Wednesday, July 19, 2023, 08:09 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | An electrical check was made after
new target installed on TM4. |
|
|
2467
|
Tuesday, July 25, 2023, 16:25 |
Carla Babcock | North Hot-Cell | Standard Operation | | SiC#45 | SiC#45 post irradiation inspection | Looked at SiC#45 in the hot cell. Looked
very clean, no deposits on the heat shield
or other components. Target also looked very |
|
|
2473
|
Tuesday, August 08, 2023, 13:01 |
David Wang | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TM2 TiC#6 post run electrical check at NHC. | TM2 TiC#6 post run electrical check has
been done at TCS. See attachment |
|
|
2474
|
Wednesday, August 09, 2023, 09:41 |
David Wang | North Hot-Cell | Standard Operation | TM2 | Nb#10 | TM2 Nb# 10 electrical and leak check at NHC | Nb#10 has been installed on TM2 . electrical
and leak check on HS line are good. See attachment. |
|
|
2476
|
Wednesday, August 09, 2023, 13:43 |
Carla Babcock | North Hot-Cell | Standard Operation | TM2 | TiC#6 | TiC#6 PIE | PIE on TiC#6 was done in the NHC. The target
assembly looked brand new when we took it
out, no heating spots or deposits (pictures |
|
|
2480
|
Monday, August 28, 2023, 12:16 |
Frank Song | North Hot-Cell | Repair | TM2 | Nb#11 | electric/leak check | TM2 with new target Nb#11 has been
E/L checked sitting on NHC. |
|
|
2484
|
Tuesday, August 29, 2023, 10:45 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | UCx#42 | electrical check | TM4 with spent target UCx#42
has been electric checked at NHCpost right
after transferred from ITE. |
|
|
2485
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
|
2486
|
Tuesday, August 29, 2023, 14:32 |
Frank Song | North Hot-Cell | Standard Operation | TM4 | Ta#65 | electrical check/leak check | TM4 with new target Ta#65 has been
E/L checked at NHCPost. |
|
|
2627
|
Thursday, June 27, 2024, 09:49 |
David Wang | North Hot-Cell | Standard Operation | | Nb#10 | Nb#10target has been remotely transferred from NHC to SHC. | Nb#10target has been remotely transferred
from NHC to SHC. |
|
|
2679
|
Wednesday, September 11, 2024, 13:38 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Manipulator - Y-axis motion not functioning | Update 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited |
|
|
2681
|
Monday, September 16, 2024, 08:23 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote end #9352 reapir | On Friday, September 6, 2024 Model 'N'
remote arm #9352 was removed from the NHC
right side installed position to investigate |
|
|
2758
|
Wednesday, January 29, 2025, 11:39 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote Arm #9342 Tong Cable | Model N remote arm serial #9342 tong cable
has been un-jammed from between pulley 3D
(see picture) and casting (this is an ongoing |
|
|
2787
|
Tuesday, April 01, 2025, 09:47 |
Frank Song | North Hot-Cell | Repair | | | Two NHC light bulbs replacement | 2 broken lights of NHC were replaced in
Target Hall. see pics attached. |
    |