Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2392     Entry time: Wednesday, November 23, 2022, 11:27
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: UCx#41 
Subject: electric and leak check after new target installed 

 an electric check and leak check done on NHC, TM4 with new target UCx#41 is ready moving to TCS.

Attachment 1: TM4_with_UCx#41_electric_and_leak_check_on_NHC.png  147 kB  | Show | Hide all
ELOG V2.9.2-2455