Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2456     Entry time: Tuesday, June 13, 2023, 11:45
Author: Frank Song 
Category: North Hot-Cell 
Type: Standard Operation 
Module: TM4 
Target/Number: TiC#5 
Subject: electrical check 

 TM4 with spent target TiC#5 electric check after moving from ITE to NHC.

Attachment 1: TM4_with_spent_target_electric_check_right_after_moving_to_NHC.png  1.278 MB  | Show | Hide all
ELOG V2.9.2-2455